Your browser is outdated!

To ensure you have the best experience and security possible, update your browser. Update now

×

Yasser Elkhouly

Piping Design Engineer

Piping
Piping Design
Piping Engineer
Yasser Elkhouly
48 years old
Cairo (11751) Egypt
Professional Status
Employed
Available
About Me
Over Fifteen years’ of experience in Plant Design and Piping Design Expert, I have started my professional career since 1997 as a Piping Designer, I possess the relevant Piping design engineering experience for Oil & Gas, Power Plant, Water and Wastewater.
Working Since 2005 in the Oil&Gas Sector as Offshore, Onshore, LNG Plant Petrochemical Plant, different type of projects as FEED, EPCM and detail design engineering, for different engineering firms, QUANTAPOINT, WorleyParsons and Chiyoda.
Personal attributes include leadership and sound judgment as well as creativity, analytical and troubleshooting skills during my career history has been improved and evolved by experience gained due to interacting to diverse backgrounds and culture of different organizations at several countries.
Resume created on DoYouBuzz
  • Projects handled:
  • KAMOSE Development Project - NOSPCO
  • NEAG New Surface Injection System - BADR Petroleum Company (BAPETCO)
  • EMC-Replacement of the Existing Pneumatic Network at Meadia - Abu Qir Petroleum
  • Scope of the work:
    • Review Project specification and general specification.
    • Implement Piping design for the required facilities included in the project scope of work.
    • Review Plot Plan regarding piping design requirement and equipment layout arrangement.
    • Implement piping 3D Model using AutoCAD Plant 3D, checking and review 3D model.
    • Execute site survey & prepare site survey report.
    • Design and prepare for general pipe route for study of major values of Equipment Layout and
    instrumentations locations
    • Prepare Piping drawing for pipe rack and sleeper civil loading data.
    Provide piping support type and location including pipe loading values and directions to Civil group.
    • Prepare piping design for construction drawing including Piping Isometric drawing, Piping general
    arrangement drawing and special pipe support drawing.
    • Preparing Piping MTO and piping work volume.
    • Dealing with other disciplines reviewing provided data.
    • Review piping material Vendor Print checking the acceptability to piping design requirement and project
    standards and specifications.
    • Handle 3D Model Review Meeting discussion project aspects and basis of design with client discipline
    representative.
    • Confirm Piping Tie-in point location, prepare Piping Tie-in List.
    • Review Internal discipline document reflecting related data to piping design as (Process P&ID, Mechanical
    Equipment Drawing and Data sheets, Instrumentation hook-up Drawing and data Sheets).
  • Projects handled:
    ▶ Long Term Engineering, Procurement, Construction Management (EPCm) Services Contract - RasGas Company Limited.
    ▶ QatarGas EPCm service for combined projects
    ▶ QAPCO Secondment projects
    ▶ FEED and EPCM Qatar Shell GTL Project.
  • Scope of the work:
    • Review / Clarify contract document, verify design package, preparing individual design plan.
    • Execute Site survey and preparing site survey report to indicted scope of work on the life plant, following
    client safety requirement.
    • Review Project specification and general specification.
    • Implement Piping design for the required facilities included in the project scope of work.
    • Review Plot Plan regarding piping design requirement and equipment layout arrangement.
    • Execute 3D customizing, Checking and review 3D model.
    • Prepare Piping drawing for pipe rack and sleeper civil loading data.
    • Prepare piping design and construction drawing including Piping Isometric drawing, Piping general
    arrangement drawing and special pipe support drawing
    • Prepare Piping MTO materials and piping work volume.
    • Review, develop and finalize of Line List.
    • Confirm piping Tie-in point location preparing Tie-in List.
    • Test Block Diagram drawing preparation.
    • Prepare Blinding Plan to implement the required Tie-In point.
    • Prepare Sub-contract Requisition, followed by Sub-contract TBE according to project specifications.
    • Sub-contracts meeting and bidders site visit giving instruction about the piping project scope of work.
    • Review other disciplines data sheet to achieve optimum design.
    • Dealing with client to achieve design requirements.
    • Dealing with Sub-contract responding the Technical Queries response issued by Sub-contract during
    construction stage.
    • Prepare As-built 3D model and As-built drawing.
    • Manage and supervise group of designers to achieve project design requirement.
    • Lead design team to control project progress according to project schedule to maintain project deadline.
    • Deal with project management team to estimate Man-hours for new Project, applying piping input to
    build new project CTR’s & project schedule.
Learn more
  • Projects handled:
    ▶ GUPCO REHABILITATION PROJECT - GUPCO
    ▶ Karama Power Plant - QARUN PETROLEUM COMPANY (QPC)
    ▶ Akik Gas Plant Relocation project - Khalda Petroleum Company (KPC)
    ▶ NORTH SHEDWAN NEAR SHORELINE PROJECT - GUPCO
    ▶ SOPC FIRE FIGHTING Project - Suez Oil Processing Company (SOPC)
  • Scope of the work:
    Scope of the work:
    • Develop Laser documentation for offshore oil complex, using laser scanning data, for REHAB Project.
    • Prepare equipment 3D Cad model for Ramadan 6 complex using CADWorx as per laser scanning data.
    • Prepare piping 3D Cad model, using CADWorx as per laser scanning data. for REHAB Project
    • Implement Plot plans and as-per Cad model and laser scanning data, for REHAB Project
    • Implement piping arrangement drawing and per Cad model and laser scanning data, for REHAB Project
    • Prepare Equipment elevations for the complex using the 3D Cad model as per the laser scanning data.
    • Design and prepare for general pipe route for study of major values of Equipment Layout and
    instrumentations locations.
    • Implement Piping design for the required facilities included in the project scope of work.
    • Prepare Piping drawing for pipe rack and sleeper civil loading data.
    • Provide piping support type and location including pipe loading values and directions.
    • Preparing Equipment nozzle orientation drawing.
    • Prepare piping design and construction drawing including Piping Isometric drawing & GA Drawing.
    • Preparing Piping MTO materials and piping work volume.
    • Review internal discipline document reflecting related data to piping design.
    • Handle 3D Model Review Meeting discussion project aspects and basis of design with client.
    • Prepare As-built 3D model and As-built drawing.
    • Manage and supervise group of designers to achieve project design requirement.
    • Lead design team to control project progress according to project schedule to maintain project deadline.
  • Projects handled:
    ▶ GUPCO REHABILITATION PROJECT – GUPCO
    ▶ Mobil Producing Nigeria Unlimited offshore platforms - Mobil
    ▶ Chevron Nigeria Limited (CNL) offshore platforms. – CHEVRON
  • Scope of the work:
    • Develop As-built documentation of offshore oil platforms, using QUANTAPOINT Prism 2D & 3D (Laser
    Scanning Software).
    • Develop Plot plans and equipment arrangement Plans for complexes Using Laser Scanning data.
    • Develop Framing Plans and Structure elevations Using Laser Scanning data.
    • Execute Piping 3D models and Clashing check for 3D Design Model Using Laser Scanning data.
    • Design and prepare for general pipe route for study of major values of Equipment Layout and
    instrumentations locations.
    • Prepare piping design and construction drawing including Piping Isometric drawing, Piping general
    arrangement drawing and special pipe support drawing
    • Preparing Piping MTO materials and piping work volume.
    • Site Visit to verify Piping Isometrics through constructability reports provided by construction team.
    • Review internal discipline document reflecting related data to piping design.
    • Manage and supervise group of designers, execute on-job training for junior team member.
    • Lead design team to control project progress according to project schedule to maintain project deadline.

Senior Piping Designer

Chemonics Egypt
December 2003 to June 2005
Full-time
Cairo
Egypt
  • Scope of the work:
    Using Autocad to develop and prepare Water, Wastewater and Stormwater Network Drawing, Hydraulic Profile Drawing, Valve chamber Mechanical drawing, layout and Detail drawing for Water and Wastewater treatment plant.

Piping Designer

Senior Consulting Engineering
April 2000 to September 2002
Cairo
Egypt
  • Scope of the work:
    Using Autocad to develop and prepare Water, Wastewater and Stormwater Network Drawing, Hydraulic Profile Drawing, Valve chamber Mechanical drawing, layout and Detail drawing for Water and Wastewater treatment plant.

CAD Designer

EKG Consulting Engineering
May 1997 to May 1999
Cairo
Egypt
  • Scope of work:
    Using Autocad to develop and prepare Water, Wastewater and Network Drawing, Hydraulic Profile Drawing, Valve chamber Mechanical drawing, layout, Detail drawing and Piping Isometric Drawing for Water and Wastewater treatment plant.
PDS piping design and equipment design
Intermediate
SPR software for PDS model review and checking
Advanced
Laser scanning documentation software (Prism 2D& Prism 3D) Quantapoint software
Expert
Navisworks software for different 3D model review and checking
Advanced
CAD tools (AutoCAD & CADWorx)
Expert
Auto plant Piping Design Sofware
Good
AVEVA PDMS Piping and Equipment design training prepared by Chiyoda Almana.
Intermediate
Microsoft office (Word, Excel, PowerPoint, Access).
Advanced

B.Sc. of Applied Arts, in Interior Design

Faculty of Applied Arts

September 1994 to July 1999
Joined Faculty of Applied Arts at Helwan University, studying Architectural Interior Design.