Wassim SAÏD

Piping & Mechanical Engineer / Commissioning Engineer

32 years old
Driving License
Tunis (2083) Tunisia
Employed Available

Mechanical & Piping Engineer

Alpha Engineering International
Since September 2015
Sousse
Tunisia
  • Project: CPF Direct Fired Heater Upgrade
    Company: MARETAP - Tunisia 2017
    • SOW for Heater Mechanical Inspection
  • Above Ground Welded Storage Tanks Design, Construction, Inspection and Repair API 650 & 653 Training for Tunisians Tanks Owners (ETAP, SNDP)
    Tunisia - 17/04/2017 to 21/04/2017
  • Project: Flow Lines Replacement Bids Technical Evaluation
    Company: MARETAP - Tunisia 2017
    • Technical Offer Evaluation for Flowlines Replacement
  • Project: Gas Lift Compressor Installation
    Company: OMV - Tunisia 2017
    • Gas Lift Compressor Installation SOW
    • Process Tie-ins Identification
    • Piping Arragement
    • Piping MTO
    • 3D Model Review
  • Project: New Skimmer Installation
    Company: OMV - Tunisia 2017
    • Process Tie-ins Identification
    • Skimmer Supply Specifications
    • Piping Isometric Drawings
    • Piping Arragement
    • Piping MTO
    • 3D Model Review
  • Project: Foundation Flatness Check for Gas Generator Installation
    Company: OMV - Tunisia 2017
    • Flatness Check Site Survey
    • Flatness Check Report
  • Project: NFPA 20 Fire Fighting Pumps
    Company: MARETAP- Tunisia 2017
    • NFPA 20 Diesel & Electrical Fire Fighting Pump Specification
    • NFPA 20 Diesel & Electrical Fire Fighting Pump TDS / IDS / RDDS
  • Project: Detail Engineering for Construction of new pipeline from Guebiba station to CFTP Station
    Company: TPS - Tunisia 2015/2016/2017
    Elaboration of:
    • Pumps Technical Data Sheets and Supply Specifications
    • Pig Traps Technical Data Sheets and Supply specifications
    • Pipeline Trenching, Linning, Laying, Joint Coating, Welding and NDE Procedures
    • Painting Specification
    • Piping Arrangement, Isometric Drawings and MTO
    • Piping and Pipeline Stress Analysis
    • Pipeline Crossings Schedule
  • Project: Separators and Tanks Cold Repair
    Company: MARETAP - Tunisia 2017
    • Non Metallic Repair Scope Of Work
    • Services Prices Schedule
  • Project: Fire Fighting Pump Rental Specification
    Company: MARETAP - Tunisia 2017
    • Scope Of Work
    • Services Prices Schedule
  • Project: Budgetary Estimation For Tanks and Flowlines Repair
    Company: MARETAP - Tunisia 2016
    • Damaged Flowlines Repair Budgetary Estimation
    • Damaged Tanks Repair Budgetary Estimation
  • Project: Gas Pipeline Design Verification
    Company: MARETAP - Tunisia 2016
    • Pipeline Corrosion Rates and Remaining Life
    • Thickness Verifications (API 5L and NT 109.01)
    • Pipeline Calculation Note
  • Project: Flexible Loading Hoses Specifications and Bids Evaluation Company: MARETAP - Tunisia 2016
    • Flexible Hoses Technical Data Sheets and Supply Specifications
    • ITT Documentaions
    • Bids Evaluation and Technical Acceptance
  • Project: Gas Lift Compressors Upgrade
    Company: OMV - Tunisia 2016
    • Gas Lift Compressor Procurement and Installation SOW
    • Services Prices Schedule
    • Gas Lift Compressor Piping Installation Drawings
  • Project: Heat Exchanger Calculation Note Elaboration
    Company: STIR - Tunisia 2016
    • Shell and Tube Heat Exchanger Mechanical Calculation Note
    • Thickness Verification Check
  • Project: Engineering Documents update Company: TPS - Tunisia 2016
    • As-Built Activities
    • Update of TPS Stations Engineering Documents
    • Flange Management Procedure and Budgetary Estimation
    • P&ID Elaboration (as Design Engineer)
  • Project: Sour Water API 650 500 m3 Welded Tank Design
    Company: AEC - Tunisia 2016
    • API 650 Storage Tank Calculation Note
    • Mechanical Drawings
  • Project: Cherouq Flowlines Replacement Engineering
    Company: OMV - Tunisia 2016
    • Flowlines Construstion and Welding Specifications
    • Flowlines MTO
    • Contractors SOW and Prices Schedule
  • Project: Storage Tanks Piping Relocation (Fast Track)
    Company: OMV - Tunisia 2016
    • Stress Analysis
    • ISO, Piping Arrangement and MTO
  • Project: Detail Engineering for Trunk Line and Waha Reception Facilities
    Company: OMV - Tunisia 2015/2016
    Elaboration of:
    • Slug Catcher, KO Drum, Pumps, Flare System, Pig Traps Data Sheets and Supply Specifications
    • Piping Arrangement, Isometric Drawings and MTO
    • Piping and Pipeline Stress Analysis
  • Project: Detail Engineering for Gathering System Phase II
    Company: MVI - Tunisia 2015
    • Flowlines Stress Analysis
    • Construction Scope Of Work, Lump Sum, Equipment and Manpower Prices Schedule
    • Anchor Flange, Barred Tee Technical Data Sheets
  • Project: Centre Huile As-Built at El Borma Station
    Company: SITEP - Tunisia 2015
    • Plant As-Built Isometric Drawings Elaboration
    • Plant As-Built P&ID Elaboration
    • Plant 3D Model
    • As-Built On Site Activities
  • General Activities:
    • Mechanical Department Quality Actions Tracking and Achievement
    • Technical Offer Presentation
    • Manhours Estimation
    • Project Schedule Preparation
    • Drawings Check and Comments