  • Project: Construction of New Pipeline from Guebiba Station to CFTP
    Company: AEC/TPS - Tunisia 2017
    • Status Index & SubSystems Boundaries Elaboration
    • Pre-Commissioning and Commissioning Procedure Elaboration
    • Leak & Inerting Procedure Elaboration
    • Leak Test Packs
    • Pre-Commissioning & Commissioning Check-Lists & Test-Sheets Elaboration
    • Commissioning On Site Activities (Piping, Pressure Vessels, Rotating Equipment)
  • Project: Commissioning Assistance for OMV Well Pads
    Company: OMV - Tunisia 2017
    • On Site Commissioning Activities (Piping, Instrumentation, Safety)
    • Commissioning Activities Follow-Up and Coordination (Between Disciplines and Company/Contractors)
  • Project: Commissioning and Start-Up Assistance Catalytic Reforming Unit at Tunisian Refinery
    Company: STIR - Tunisia 2016
    • Status Index & SubSystems Boundaries Elaboration
    • Pre-Commissioning and Commissioning Procedure Elaboration
    • Leak & Inerting Procedure Elaboration
    • Leak Test Packs
    • Pre-Commissioning & Commissioning Check-Lists & Test-Sheets Elaboration
    • Commissioning On Site Activities (Piping, Rotating Equipment, Pressure Vessels, Fractionating Column, Direct Fired Heaters, Reactors)
  • Project: EPCC - Trunk Line and Waha Reception Facilities
    Company: OMV - Tunisia 2015-2016
    • Pre-Commissioning and Commissioning Procedure Elaboration.
    • Leak & Inerting Procedure Elaboration
    • Leak Test Packs
    • Pre-Commissioning & Commissioning Check-Lists & Test-Sheets Elaboration

Mechanical & Piping Engineer

Alpha Engineering International
Since September 2015
Sousse
Tunisia
  • Project: CPF Direct Fired Heater Upgrade
    Company: MARETAP - Tunisia 2017
    • SOW for Heater Mechanical Inspection
  • Above Ground Welded Storage Tanks Design, Construction, Inspection and Repair API 650 & 653 Training for Tunisians Tanks Owners (ETAP, SNDP)
    Tunisia - 17/04/2017 to 21/04/2017
  • Project: Flow Lines Replacement Bids Technical Evaluation
    Company: MARETAP - Tunisia 2017
    • Technical Offer Evaluation for Flowlines Replacement
  • Project: Gas Lift Compressor Installation
    Company: OMV - Tunisia 2017
    • Gas Lift Compressor Installation SOW
    • Process Tie-ins Identification
    • Piping Arragement
    • Piping MTO
    • 3D Model Review
  • Project: New Skimmer Installation
    Company: OMV - Tunisia 2017
    • Process Tie-ins Identification
    • Skimmer Supply Specifications
    • Piping Isometric Drawings
    • Piping Arragement
    • Piping MTO
    • 3D Model Review
  • Project: Foundation Flatness Check for Gas Generator Installation
    Company: OMV - Tunisia 2017
    • Flatness Check Site Survey
    • Flatness Check Report
  • Project: NFPA 20 Fire Fighting Pumps
    Company: MARETAP- Tunisia 2017
    • NFPA 20 Diesel & Electrical Fire Fighting Pump Specification
    • NFPA 20 Diesel & Electrical Fire Fighting Pump TDS / IDS / RDDS
  • Project: Detail Engineering for Construction of new pipeline from Guebiba station to CFTP Station
    Company: TPS - Tunisia 2015/2016/2017
    Elaboration of:
    • Pumps Technical Data Sheets and Supply Specifications
    • Pig Traps Technical Data Sheets and Supply specifications
    • Pipeline Trenching, Linning, Laying, Joint Coating, Welding and NDE Procedures
    • Painting Specification
    • Piping Arrangement, Isometric Drawings and MTO
    • Piping and Pipeline Stress Analysis
    • Pipeline Crossings Schedule
  • Project: Separators and Tanks Cold Repair
    Company: MARETAP - Tunisia 2017
    • Non Metallic Repair Scope Of Work
    • Services Prices Schedule
  • Project: Fire Fighting Pump Rental Specification
    Company: MARETAP - Tunisia 2017
    • Scope Of Work
    • Services Prices Schedule
  • Project: Budgetary Estimation For Tanks and Flowlines Repair
    Company: MARETAP - Tunisia 2016
    • Damaged Flowlines Repair Budgetary Estimation
    • Damaged Tanks Repair Budgetary Estimation
  • Project: Gas Pipeline Design Verification
    Company: MARETAP - Tunisia 2016
    • Pipeline Corrosion Rates and Remaining Life
    • Thickness Verifications (API 5L and NT 109.01)
    • Pipeline Calculation Note
  • Project: Flexible Loading Hoses Specifications and Bids Evaluation Company: MARETAP - Tunisia 2016
    • Flexible Hoses Technical Data Sheets and Supply Specifications
    • ITT Documentaions
    • Bids Evaluation and Technical Acceptance
  • Project: Gas Lift Compressors Upgrade
    Company: OMV - Tunisia 2016
    • Gas Lift Compressor Procurement and Installation SOW
    • Services Prices Schedule
    • Gas Lift Compressor Piping Installation Drawings
  • Project: Heat Exchanger Calculation Note Elaboration
    Company: STIR - Tunisia 2016
    • Shell and Tube Heat Exchanger Mechanical Calculation Note
    • Thickness Verification Check
  • Project: Engineering Documents update Company: TPS - Tunisia 2016
    • As-Built Activities
    • Update of TPS Stations Engineering Documents
    • Flange Management Procedure and Budgetary Estimation
    • P&ID Elaboration (as Design Engineer)
  • Project: Sour Water API 650 500 m3 Welded Tank Design
    Company: AEC - Tunisia 2016
    • API 650 Storage Tank Calculation Note
    • Mechanical Drawings
  • Project: Cherouq Flowlines Replacement Engineering
    Company: OMV - Tunisia 2016
    • Flowlines Construstion and Welding Specifications
    • Flowlines MTO
    • Contractors SOW and Prices Schedule
  • Project: Storage Tanks Piping Relocation (Fast Track)
    Company: OMV - Tunisia 2016
    • Stress Analysis
    • ISO, Piping Arrangement and MTO
  • Project: Detail Engineering for Trunk Line and Waha Reception Facilities
    Company: OMV - Tunisia 2015/2016
    Elaboration of:
    • Slug Catcher, KO Drum, Pumps, Flare System, Pig Traps Data Sheets and Supply Specifications
    • Piping Arrangement, Isometric Drawings and MTO
    • Piping and Pipeline Stress Analysis
  • Project: Detail Engineering for Gathering System Phase II
    Company: MVI - Tunisia 2015
    • Flowlines Stress Analysis
    • Construction Scope Of Work, Lump Sum, Equipment and Manpower Prices Schedule
    • Anchor Flange, Barred Tee Technical Data Sheets
  • Project: Centre Huile As-Built at El Borma Station
    Company: SITEP - Tunisia 2015
    • Plant As-Built Isometric Drawings Elaboration
    • Plant As-Built P&ID Elaboration
    • Plant 3D Model
    • As-Built On Site Activities
  • General Activities:
    • Mechanical Department Quality Actions Tracking and Achievement
    • Technical Offer Presentation
    • Manhours Estimation
    • Project Schedule Preparation
    • Drawings Check and Comments
  • Graduate Project
  • FEED and Pre-Design of a Water Evaporator using the Heat dissipated by Gas Turbine Exhaust.
    • Material Selection
    • Piping Design (ASME B31.3, ASME B16.11, ASME B16.20)
    • Pumps Selection (API 610)
    • Tubular Heat Exchangers Design (ASME VIII Div.1, TEMA)
    • Cost Estimation
    • Feasability Study

Mechanical Engineer

ENIT (Ecole Nationale d'Ingénieurs de Tunis)

2012 to 2015

Engineering Preparatory Studies

IPEIEM (Institut Préparatoire aux Etudes d'Ingénieurs El Manar)

2010 to 2012

Bachelor's Degree

Hannibal Technical Secondary School

Since 2010
  • English: Fluent
    Good
  • French: Fluent
    Advanced
  • Arabic: Mother Tongue
    Advanced
  • Italian: Mother Tongue
    Advanced
  • Storage Tanks: API 650, 12B, 653
  • Pressure Vessel: ASME VIII Div. 1, API 510, RP 571, RP 572
  • Pipeline: ASME B31.4, B31.8, API RP 1102, NT 109.01, 109.02
  • Piping: ASME B31.3, B16.5, B16.11, B16.20, API 570
  • Flexible Hoses: BS 1435, BS EN 1762
  • Welding: ASME IX, API RP 577
  • NDE: ASME V
  • Materials: ASME II, ASTM, NACE
  • FF Pumps: NFPA 20
  • Pumps: API 610
  • Compressors: API 618, 619
  • OPERCOM®
  • Pressure Vessels Inspection (API 510)
  • Pre-Commissioning and Commissioning
  • Piping & Pipeline Sizing
  • Piping and Pipeline Stress Analysis
  • Welded and Bolted Storage Tanks Design
  • Pressure Vessels Design
  • AUTOCAD
    Good
  • CADWORX PLANT
    Good
  • CADWORX P&ID
    Advanced
  • CADWORX EQUIPMENT
    Advanced
  • NAVISWOKS
    Good
  • CAESAR II
    Advanced
  • PVELITE
    Advanced
  • CATIA V5
    Good
  • HTRI XCHANGER
    Good
  • National Diploma of Arabic Music