I am a Civil Supervisor holding a Civil Engineering bachelor degree, with a working experience of 8 years in different contracting companies both local and international.
I have been engaged in a wide variety of projects (Housing north Algeria/ Oil & Gas Algeria Desert ) with an estimated total value between US $ 100 million & US $ 1.6 billion.
Through my career I have proven effective in comprehending and successfully addressing series of issues that may arise in the course of a construction project (technical studies, project planning, cash-flow analysis, time-schedule etc.). I was also able to face and address issues concerning site management (supervision and execution of landscape works, employees and sub-contractors management, materialʼs supply, Companyʼs Liaison between Clients and Constructors etc.). Taking part in different kind of projects gave me the opportunity to gain significant experience in many aspects of construction projects from the beginning until the completion of the project.
I consider myself a solid team-player, hard working and strongly motivated person, always trying to improve my skills and eager to help in any way in order to have the best possible result when facing difficulties.
My main goal for the future is to continue engaging in big construction projects abroad.
It would be great if you could consider my candidacy for this job opening in algeria . Please do not hesitate to contact me for any further information.
Drive consistency across the various operating centers with respect to project execution plans, project execution protocols and ensure consistency with respect to construction and engineering standards.
Ensure that all safety rules are present and respected before proceeding to all Works/ activists ( PPE, Total Safety Task Instruction TBT , permit of work valid, Hard barricade)
Complete all performance reviews, objective setting and other human resources activities associated with managing the Civil Construction Team Health, Safety and Environmental Responsibilities Demonstrate commitment to excellent HSE performance in all aspects of the work.
Manage, coach and provide direction to the Civil Construction Team in the field across both sites
Review and approved documentation submitted by contractor i.e. materials submittals, method statements, ITP of project work items, check lists and QA/QC procedures.
Sub-Contractor management including evaluating sub-contractor capabilities and assisting as applicable in the evaluation of contractor proposals and bids.
Develop, review and approve contractual documentation to support work order development. " Understand construction cost estimates (budget), contracts signed for the project, and report on construction cost performance.
Assist in ensuring the Quality Assurance System is implemented in accordance with company standards.
•Inspect project sites to monitor progress and ensure conformance to engineering plans, specifications, construction and safety standards.
Review contractor non conformance (NCR) and site observation notice (SON) to evaluate submitted recommended dispositions for approval and final closure.
Supervision, monitors, witness and perform a surveillance inspection to all Subcontractors on earth work, civil work and Building for the entire project.
Giving Instruction and programs of project priorities to civil Subcontractor’s managers, supervisors that should be completed on Specified time.
Prepare and submit daily report to the superintendent/managers.
Prepare and submit weekly, monthly concrete volume quantities of all the foundations, likes, walls lefts castes during the week.
Ensure that all safety rules are present and respected before proceeding to all Works/ activists ( PPE, Total Safety Task Instruction TSTI , permit of work valid, Hard barricade)
Prepare also RFI (Request for Information) status if we found an issue during the construction activistes.
Following up all kind of test during construction steps ( slump and compaction tests.
Witness all the pre-pour inspection with QC civil inspector and make sure that the survey report and QC forms were signed off before the pouring.
request new technical query as per site work modification
coordinate with engineering team for new scop of work as per new site condition
Civil supervisor and coordinator between my company and subcontractors and also between my company and client.
Direct supervion for more then 200 manpower including formen and survoyer and also earth work team and heavy equipment (21 dump truck , 10 excavator , 2 dozer ,5 water truck and 3 mix truck )
Organization and preparation for conc’t pouring form the excavation tell the stripping of form work
Earthwork and Related Operations consists of excavation for the construction of the roadway, excavation for structures and pipe, constructing backfill around structures and pipe, and constructing embankments as required for the roadway, ditches, and channel changes.
Construction of different foundation (pipe sleeper FDN, pipe rack FDN , manhole ….)
Daily and weekly report of manpower and material to my superintendent and daily allocation manpower to the client.
Prepared new work with the drawing and plans to the subcontractors and send daily request for inspection to our quality department
Preparing hand over to the different department mechanical and electrical and instruments and HVAC.
Daily tool box talk and coordinate with HSE department and there activities.
Controlling the work quality and ensuring the Client satisfaction.
Ensure that the quality documentation are available and its use at site
Elaborate the data base for the recording of necessary documents.
Ensure non-conformances are identified, tracked and closed out prior to acceptance of the work.
Checked working plans with its section Details as required.
Gather as built Data(s) for inspection preparation and joint survey works.
Prepare daily progress report work.
Checked daily manpower time sheets, tools and materials needed.
Requires Overtime as necessary.
Do Daily Safety Toolbox Meeting TBT before shift starts.
Does Earth Work As built Survey(s) for volumetric calculation report.
Ensures the quality of work according to the plans, standards and technical specifications of the project.
Checks and controls work (Layout, Excavation, Level, formwork and reinforcement, concrete) In accordance with the plan.
Coordination with state agencies CTC (Technical Control and Construction) and laboratory materials.
Control and retrieves certificates of tested materials used (front bottom of the excavation, concrete, materials identification, tests for compactness).