A successful, highly result oriented Rotating Equipment Engineer with 10 Years of professional experience in Upstream, Downstream and LNG business verticals with reputed Oil and Gas Companies.
Work experience in troubleshooting, overhauling and repair of all Static & rotating equipment
Maintenance jobs carried out in heat exchangers of fixed, floating, hair pin, and U tube type which include activities right from channel/Dome remove, bundle pulling, cleaning, inspection, testing, (Shell tube & final) and re fixing all equipment’s.
Maintenance jobs carried out in Fin-fan air coolers, which include activities like blinding, plugs removal, tube ID cleaning, inspection hydro testing activities etc.
Maintenance jobs carried out in Distillation column, which include activities like blinding, man way open, removal of distributor, inspection tray man way open, tray cleaning, Re-fixing etc.
Maintenance jobs carried out in Absorber & vessels, , which include activities like blinding, man way open, Demister removal, cleaning, Re-fixing etc.
Maintenance jobs carried out in Storage tanks, , which include activities like blinding, man way open, Secondary/primary seal removing, Inspection, test & Re- fixing etc.
M/S Gulf Spic Gen. Trading & Cont. Co. W.L.L. – Kuwait./ Mechanical Maintenance Service Contract
October 2012
to December 2015
Mina Abdulla Refinery
Kuwait
Preventive and Predictive maintenance program set up and execution
Service of flow serve pump & replace of thrust bearing
Fully involved in various pre - commissioning activities such as steam/air blowing, lube oil flushing, turbine, compressor and pump -mechanical runs and sols runs
Shutdown maintenance of Tower internal parts its cleaning, service & box up
Service of heat exchangers of fixed, floating, hair pin, and U tube type which include activities right from channel/Dome remove, bundle pulling, cleaning, testing, (Shell tube & final) and re fixing
Review, Blinding/De- Blinding list & Isolate the equipment into flow/ process line as per blind list, arrangement of proper gasket & tools.
Lump sump job fully involved in erection of various pumps, valves, trays, and drum
Erection & alignment of static and rotary equipment’s.
Retrofit of two sets of new electronic governor system for wet gas compressor drive turbines C-20-101-ST / 201 ST complete with all accessories and bulk materials at Delayed Coker (Unit-20) in MAB Refinery