Your browser is outdated!

To ensure you have the best experience and security possible, update your browser. Update now

×

rajaram ram

rajaram ram

Rotating Equipment Supervisor

50 years old
Driving License
Tamilnadu (606308) India
Employed Available
A successful, highly result oriented Rotating Equipment Engineer with 10 Years of professional experience in Upstream, Downstream and LNG business verticals with reputed Oil and Gas Companies.
Resume created on DoYouBuzz

Mechanical Maintenance Supervisor

M/s. IMCO Engineering & Constr. Co. W.L.L. – Kuwait / Mechanical Maintenance Service Contract
Since February 2006
Shuaiba Refinery
Kuwait
  • Work experience in troubleshooting, overhauling and repair of all Static & rotating equipment
  • Maintenance jobs carried out in heat exchangers of fixed, floating, hair pin, and U tube type which include activities right from channel/Dome remove, bundle pulling, cleaning, inspection, testing, (Shell tube & final) and re fixing all equipment’s.
  • Maintenance jobs carried out in Fin-fan air coolers, which include activities like blinding, plugs removal, tube ID cleaning, inspection hydro testing activities etc.
  • Maintenance jobs carried out in Distillation column, which include activities like blinding, man way open, removal of distributor, inspection tray man way open, tray cleaning, Re-fixing etc.
  • Maintenance jobs carried out in Absorber & vessels, , which include activities like blinding, man way open, Demister removal, cleaning, Re-fixing etc.
  • Maintenance jobs carried out in Storage tanks, , which include activities like blinding, man way open, Secondary/primary seal removing, Inspection, test & Re- fixing etc.

Mechanical Maintenance Supervisor

M/S Gulf Spic Gen. Trading & Cont. Co. W.L.L. – Kuwait./ Mechanical Maintenance Service Contract
October 2012 to December 2015
Mina Abdulla Refinery
Kuwait
  • Preventive and Predictive maintenance program set up and execution
  • Service of flow serve pump & replace of thrust bearing
  • Fully involved in various pre - commissioning activities such as steam/air blowing, lube oil flushing, turbine, compressor and pump -mechanical runs and sols runs
  • Shutdown maintenance of Tower internal parts its cleaning, service & box up
  • Service of heat exchangers of fixed, floating, hair pin, and U tube type which include activities right from channel/Dome remove, bundle pulling, cleaning, testing, (Shell tube & final) and re fixing
  • Review, Blinding/De- Blinding list & Isolate the equipment into flow/ process line as per blind list, arrangement of proper gasket & tools.
  • Lump sump job fully involved in erection of various pumps, valves, trays, and drum
  • Erection & alignment of static and rotary equipment’s.
  • Retrofit of two sets of new electronic governor system for wet gas compressor drive turbines C-20-101-ST / 201 ST complete with all accessories and bulk materials at Delayed Coker (Unit-20) in MAB Refinery

Mechanical Supervisor

M/S Gulf Spic Gen. Trading & Cont. Co. W.L.L. – Kuwait / Installation of New Compressor at GC7, 8 & 21, KOC.
March 2010 to September 2012
KOC South East
Kuwait
  • Erection & Alignment of New Man Turbo Compressor(TV gas/40 Ton),Centrifugal pumps
  • Erection & Alignment of Scrubber (15 Ton),Oil cooler(10 Ton),Discharge Cooler (25 Ton), Lube Oil skid(12 Ton),and Assembly of internal parts
  • Dry gas seal assembly, fixing and coordinate with vendor
  • Man turbo compressor decouple & couple from motor to compressor
  • Assembly & Alignment of lube oil cooler fin fan
  • Pre - commissioning activities such as steam / air blowing lube oil flushing, Compressor and pump - mechanical runs and solo runs
Company Description
Installation of new compressor at GC7, 8 & 21, KOC

Mechanical Foreman

M/S Gulf Spic Gen. Trading & Cont. Co. W.L.L. – Kuwait. / Improving Maintainability of Trim Coolers and De-salter/Dehydration Heaters
June 2009 to February 2010
  • Erection & Alignment of New heaters, 4 Nos (15 Ton)
  • Erection & Alignment of Centrifugal pump with Motor
  • Alignment of Pipe rack, structural steel (500 Ton)
  • Assembly of de salter internal parts

Mechanical Foreman

M/S Southern Petrochemical Industries Corporation, India./ Maintenance of Steam turbine at Thermal Power Plant,Neyveli
June 2008 to December 2008
Neyveli
India
  • Overhauling and repair of all centrifugal pump and steam turbine
  • Replace of Mechanical seal & bearing
  • Different type of alignment such as Rim and face & Reverse alignment