I am an enthusiastic engineer with 3 years of experience in manufacturing. I work with an effective communication, flexible attitude, and excellent analytical and problem solving skills. I am able to undertake challenging tasks and responsibilities in a high pressure working environment to ensure product quality even in specific domain (Aerospace) and for important clients (Airbus, ATR). My goal is to effectively apply my knowledge and skills for the benefits of the organization working with.
Manage quality control and electrical test operations in collaboration with my team which include 4 team leaders, 8 electrical technicians and 41 controllers.
Coordinate different tasks and actions with the support functions (Logistic, Scheduling, Maintenance and Technical Studies Department).
Ensure the manufacturing efficiency of the control and test and resources availability to respect the manufacturing time plan delivered by the Scheduling Department.
Analyze and monitor available capacities; short and long term capacity through quality control and test planning.
Present weekly performance indicators (Productivity, 5S, Quality, Wastes, Delay, Absenteeism, and Areas of Improvements) to the production and plant managers using PowerPoint.
Ensure products’ compliance with client’s requirement (Airbus, ATR).
Propose and implement improvement solutions with the coordination of LEAN Department in order to minimize operators’ errors and to best meet customer requirement with zero default.
Follow the efficiency indicators of my team on a daily basis according to the priorities and the manufacturing’s load plan.
Prepare, validate and certify the final product delivery documents (EASA).
Added Values and Achievements:
Zero client claim during my duties as the head quality control and test team that ensure the best quality of the final products (electrical wiring systems for aeronautics) that cost up to 35000€/product.
Daily meeting with Quality Department to analyze real time quality defaults in order to make corrective actions to stop these defect generations.
Monthly meeting my team leaders with HR Department coordination with to discuss social areas of improvement within the company environment.
Meet my team during the 10 – 15 first minutes every day to motivate them and to communicate the working issues and the appropriate solutions if any problem was detected.
Trained 41 controllers to use new technologies (Tablets) in order to eliminate paper waste in control and test process.
Manufacturing reimplementation to optimize production flow and reduce wastes (time, resources and work space).
Rebuild the electrical test team by affecting the new team leader and assist to his integration.
Approve ISO 9100 AFNOR certificates for control and test department.
Code sources development of the three modules using Embedded C language.
Test and validate the three modules using NXP LPC 3250 plate-form (ARM 9).
Write the technical documents of the three modules.
Company Description
Project Title: Study, design and develop the Handover, Backup and Coexistence modules, parts of the central coordinator block according to HomePlug AV specification.