Your browser is outdated!

To ensure you have the best experience and security possible, update your browser. Update now

×

Mohamed Raafat Abdelhakim

Mohamed Raafat Abdelhakim

Construction Manager

44 years old
Driving License
Cairo Egypt
Employed Available
hard worker and can work under pressure
Resume created on DoYouBuzz

Team Leader Quality Control Engineer

Orascom Saudi Contracting Company
Since January 2017
Full-time
jeddah
Saudi Arabia
  • Project: King Abdul Aziz International Airport Development Project(KAIA)(PHASE 1) – Jeddah
    • Main Contractor : Saudi Binladin group (SBG)
    • Consultant : Dar Al-handasah
    • Cost Of Project ( Orascom Scope about): 1,640,000,000.00 SR
    • Description Of Job: Principally but not necessarily limited to:
    • Review all the projects’ specifications related to my scope of work.
    • Inspect the executed works against the project specifications and Quality control standards and procedures.
    • Inspect and close the Non-Conformance Report (NCR) Internal or those issued by the Engineer/Consultant.
    -Expediting corrective and preventive action proposal responses to NCR’s raised and their action upon acceptance
    -Re-inspecting works to ensure corrective and preventive actions taken are adequate
    • Participate in the preparation of the project QC Procedures, inspection and test plans according to the project Quality Plan.
    • Check and forward the Daily Inspection Request to the client after carrying out the internal inspection.
    • Co-ordinate with the client's inspection team for final & approved inspections.
    • Coordinate with the Site/Section Engineers to arrange daily inspection program.
    • Prepare daily QC Inspection Report and submit it to the SR QCE/Quality Control Manager.
    • Check and make sure that the work is executed in accordance with the latest approved drawings.
    • Prepare check list for any discrepancies or nonconformance activities to follow up and submit it to the SR QCE/Quality Manager.
    • Check on Hold points.
    • Issue NCR whenever a non-conformance has been found.
    • Keep records of all inspections done by third party as well as the Corporate QC Manager on equipment vendors or fabricators.
    • Assist the Corporate QC Manager in following outstanding issues as a result of the inspections.
    • Review the QC section in the submitted tender documents and summaries the requirements.
    • Participate as required by the Corporate QC Manager in site visits.
    • Perform other assignments as necessary to support the function/department
    -Review Quality Control related change orders related to Construction / Commissioning activities
    • Description Of Project: The existing infrastructure and facilities OF KAIA are inadequate to cope with increasing demand. To relieve congestion, accommodate future growth and achieve the optimum objectives for commercialized Domestic / International Passenger and Cargo hub operations, KAIA requires major expansion and upgrading of its existing infrastructure and facilities. The KAIA expansion shall take place in three Development Phases: the first phase for 30M passenger capacity; the second phase for 43M passenger capacity; and the final phase, for 80M passengers capacity. The Work include(Aprons, Taxiways, Roads, Tunnels, Bridges, Load Centres and Infrastructure, transportation Centre and Supporting Facilities)

Team Leader Civil Engineer

Orascom Saudi Contracting Company
October 2015 to December 2016
Full-time
makkah
Saudi Arabia
  • • Project: Abraj Kudai (Kudai Towers)-Holy Makkah- Saudi Arabia
    • Main Contractor : Saudi Binladin group (SBG)
    • Consultant : Dar Al-handasah
    • Cost Of Project :13 Billion SR and Orascom Scope about 400 Millions S.R
    • Description Of Job: To Execute The Skeleton And Finishes According To Certified Drawings +Remove any Barriers As Soon As to Execute the Work With High Quality and in the Determined Time + Supervision On Implementing And Follow Up Implementing Of Work Items.
    Description Of Project: Orascom's Scope is the Structural Works for Towers; 1A, 1B, 2B (as a sub-contractor under Saudi Binladen Group). Also, the Electromechanical Works for 6 Towers of 12 Towers. The Project Consists of a Large Podium Spread on all the Site, topped by 12 towers. Accommodating Several Elements with a Total built-up area of around 1.5 million m2. These include the construction of 12 Towers, A Podium Housing, a bus station, Shopping mall, restaurants, food courts, a conference center and car parks. On top of Roof (tower 6) a Dome is Housing a State of the Art Convention center.

Senior Site Engineer

Bin Sammar Contracting Company
January 2012 to April 2015
Full-time
sakaka aljouf
Saudi Arabia
  • • Project: Implementation of Obstetric\ Gynecology & Pediatric Hospital 300-bed
    • Cost Of Project : 300 Million S.R
    • Description Of Job: To Execute The Skeleton And Finishes According To Certified Drawings +Remove any Barriers As Soon As to Execute the Work With High Quality and in the Determined Time +Deal With Subcontractors And Assign them The Tasks Required And Follow Them +Make Subcontractors Invoices + Supervision On Implementing And Follow Up Implementing Of Work Items.
    • Description Of Project: Implementation Of Obstetric\ Gynecology & Pediatric Hospital 300-bed. Consists Of Main Building of Area 12000 m2 divided to 9 zones(Basement+ ground floor+7 Typical Floors)+ Tunnel of length 125 m Connect Between Main Building And Technical plant+ Technical Plant Of Area 2500 m2+Mosque+Landscape Works

Site Manager

Upper Egypt For Education Servicies Company
June 2009 to December 2011
Full-time
minya
Egypt
  • • Project: Implementation of Schools Complex
    • Cost Of Project : 35 Million L.E
    • Description Of Job: Execute The Skeleton And Finishes According To Certified Drawings +Quantity Survey +Make Owner Invoices +Make Subcontractors Invoices + Supervision On Implementing And Follow Up Implementing Of Work Items.
    • Description Of Project: Implementation Of Schools Complex In New Minia City Of Area 11000 m2 With Finishes.

Inspection Engineer.

Environmental & Civil Engineering Consulting Center (ENVIRO CIVEC)
June 2006 to May 2009
Full-time
Minya
Egypt
  • Project: Medical Syndicate Housing Project (13 towers x 12 floors)
    • Cost Of Project : 150 Million L.E
    • Description Of Job: Supervision On Execution Of 13 Towers+ revision of Invoices and Certified Them+ Certifies Companies and Contractors
    • Description Of Project: Implementation Of Doctors Towers In Minia City Consisting in 13 Towers Each Tower Have 600 m2 area based On Piles which are Execute With (C.F.A) Method With 20 m Depth and 80 cm Diameter Under 1.1 m Raft Foundation

Site Engineer.

(Atic)(Arabia Trade For Industrial Contracting)Company.
January 2004 to May 2006
Minya
Egypt
  • • Project: Implementation Of Royal Elminia White Cement Plant.
    • Cost Of Project : 100 Million L.E
    • Description Of Job: To Execute Civil Works Of The Plant +Execute Slip Forms For Cement Silos Of Hight 30 M Using Ready Mix Concrete +Prestressed Concrete Works For Cement Silos And All Concrete Is Fair Face.
    • Description Of Project: Implementation Of Royal Elminia White Cement Plant With All Its Components(Crusher-Cement Silos-Clinker Silos-Cement Mill-Cement Packing Building)

Inspectiion Engineer

Consulting Engineering Office(Ceo)(Consultant Engineer /Prof.Dr.Ayman Shaheen)
August 2002 to December 2003
Minya
Egypt
  • Supervision On Implementation Of The Following Establishments:-
  • (A):-
  • • Project: Implementation Of Educational Careers Syndicate Tower In Elminia Governorate.
  • • Position: Consultant Engineer.
  • • Cost Of Project : 30 Million L.E
  • • Description Of Job: Supervises Tower Works +Revision Of Invoices And Quantity Survey And Accept Them+ Acceptation Of Materials And Companies That Specialized To Execute The Work.
  • • Description Of Project: Implementation Of Educational Careers Syndicate Tower In Elminia Governorate Of Area 1500 M2 Consists Of Basement+ Ground Floor And 11 Typical Floors On Deep Foundations(1000 Piles Of 60 Cm Diameter And 11 M Depth Executed By Using C.F.A Method And Raft Of Thickness 1.2 M As A Piles Cap)
  • -Sharing In Making An Experiment Of Loading On One Pile In The Building Which Its Load Reached To 150 Tons.
  • (B):-
  • • Project: Implementation Of Craftsmen City.
    • Cost Of Project : 25 Million L.E
  • • Description Of Job: Supervises Works +Revision Of Invoices And Quantity Survey And Accept Them+ Supervises Infrastructure Works For The Whole City(Water And Wasting Networks),Complete Roads Network Of The Project ,Telephone Lines ,Electricity Cables Extending +Responsible Of Concrete Laboratory In The Site And Quality Control Tests +Finishing Works.
  • • Description Of Project: Implementation Of Craftsmen City In Elminia Consisting Of 200 Craft Unit.

Bachelor of Civil Engineering,

Minya University

1997 to 2002

PMP

  • Attend and Success PMP Preparation course (36 hours)
  • • Autocad
  • • Sap 2000
  • • Microsoft office with all previous and latest versions