Project: King Abdul Aziz International Airport Development Project(KAIA)(PHASE 1) – Jeddah • Main Contractor : Saudi Binladin group (SBG) • Consultant : Dar Al-handasah • Cost Of Project ( Orascom Scope about): 1,640,000,000.00 SR • Description Of Job: Principally but not necessarily limited to: • Review all the projects’ specifications related to my scope of work. • Inspect the executed works against the project specifications and Quality control standards and procedures. • Inspect and close the Non-Conformance Report (NCR) Internal or those issued by the Engineer/Consultant. -Expediting corrective and preventive action proposal responses to NCR’s raised and their action upon acceptance -Re-inspecting works to ensure corrective and preventive actions taken are adequate • Participate in the preparation of the project QC Procedures, inspection and test plans according to the project Quality Plan. • Check and forward the Daily Inspection Request to the client after carrying out the internal inspection. • Co-ordinate with the client's inspection team for final & approved inspections. • Coordinate with the Site/Section Engineers to arrange daily inspection program. • Prepare daily QC Inspection Report and submit it to the SR QCE/Quality Control Manager. • Check and make sure that the work is executed in accordance with the latest approved drawings. • Prepare check list for any discrepancies or nonconformance activities to follow up and submit it to the SR QCE/Quality Manager. • Check on Hold points. • Issue NCR whenever a non-conformance has been found. • Keep records of all inspections done by third party as well as the Corporate QC Manager on equipment vendors or fabricators. • Assist the Corporate QC Manager in following outstanding issues as a result of the inspections. • Review the QC section in the submitted tender documents and summaries the requirements. • Participate as required by the Corporate QC Manager in site visits. • Perform other assignments as necessary to support the function/department -Review Quality Control related change orders related to Construction / Commissioning activities • Description Of Project: The existing infrastructure and facilities OF KAIA are inadequate to cope with increasing demand. To relieve congestion, accommodate future growth and achieve the optimum objectives for commercialized Domestic / International Passenger and Cargo hub operations, KAIA requires major expansion and upgrading of its existing infrastructure and facilities. The KAIA expansion shall take place in three Development Phases: the first phase for 30M passenger capacity; the second phase for 43M passenger capacity; and the final phase, for 80M passengers capacity. The Work include(Aprons, Taxiways, Roads, Tunnels, Bridges, Load Centres and Infrastructure, transportation Centre and Supporting Facilities)
• Project: Abraj Kudai (Kudai Towers)-Holy Makkah- Saudi Arabia • Main Contractor : Saudi Binladin group (SBG) • Consultant : Dar Al-handasah • Cost Of Project :13 Billion SR and Orascom Scope about 400 Millions S.R • Description Of Job: To Execute The Skeleton And Finishes According To Certified Drawings +Remove any Barriers As Soon As to Execute the Work With High Quality and in the Determined Time + Supervision On Implementing And Follow Up Implementing Of Work Items. Description Of Project: Orascom's Scope is the Structural Works for Towers; 1A, 1B, 2B (as a sub-contractor under Saudi Binladen Group). Also, the Electromechanical Works for 6 Towers of 12 Towers. The Project Consists of a Large Podium Spread on all the Site, topped by 12 towers. Accommodating Several Elements with a Total built-up area of around 1.5 million m2. These include the construction of 12 Towers, A Podium Housing, a bus station, Shopping mall, restaurants, food courts, a conference center and car parks. On top of Roof (tower 6) a Dome is Housing a State of the Art Convention center.
• Project: Implementation of Obstetric\ Gynecology & Pediatric Hospital 300-bed • Cost Of Project : 300 Million S.R • Description Of Job: To Execute The Skeleton And Finishes According To Certified Drawings +Remove any Barriers As Soon As to Execute the Work With High Quality and in the Determined Time +Deal With Subcontractors And Assign them The Tasks Required And Follow Them +Make Subcontractors Invoices + Supervision On Implementing And Follow Up Implementing Of Work Items. • Description Of Project: Implementation Of Obstetric\ Gynecology & Pediatric Hospital 300-bed. Consists Of Main Building of Area 12000 m2 divided to 9 zones(Basement+ ground floor+7 Typical Floors)+ Tunnel of length 125 m Connect Between Main Building And Technical plant+ Technical Plant Of Area 2500 m2+Mosque+Landscape Works
• Project: Implementation of Schools Complex • Cost Of Project : 35 Million L.E • Description Of Job: Execute The Skeleton And Finishes According To Certified Drawings +Quantity Survey +Make Owner Invoices +Make Subcontractors Invoices + Supervision On Implementing And Follow Up Implementing Of Work Items. • Description Of Project: Implementation Of Schools Complex In New Minia City Of Area 11000 m2 With Finishes.
Environmental & Civil Engineering Consulting Center (ENVIRO CIVEC)
June 2006
to May 2009
Full-time
Minya
Egypt
Project: Medical Syndicate Housing Project (13 towers x 12 floors) • Cost Of Project : 150 Million L.E • Description Of Job: Supervision On Execution Of 13 Towers+ revision of Invoices and Certified Them+ Certifies Companies and Contractors • Description Of Project: Implementation Of Doctors Towers In Minia City Consisting in 13 Towers Each Tower Have 600 m2 area based On Piles which are Execute With (C.F.A) Method With 20 m Depth and 80 cm Diameter Under 1.1 m Raft Foundation
(Atic)(Arabia Trade For Industrial Contracting)Company.
January 2004
to May 2006
Minya
Egypt
• Project: Implementation Of Royal Elminia White Cement Plant. • Cost Of Project : 100 Million L.E • Description Of Job: To Execute Civil Works Of The Plant +Execute Slip Forms For Cement Silos Of Hight 30 M Using Ready Mix Concrete +Prestressed Concrete Works For Cement Silos And All Concrete Is Fair Face. • Description Of Project: Implementation Of Royal Elminia White Cement Plant With All Its Components(Crusher-Cement Silos-Clinker Silos-Cement Mill-Cement Packing Building)
Supervision On Implementation Of The Following Establishments:-
(A):-
• Project: Implementation Of Educational Careers Syndicate Tower In Elminia Governorate.
• Position: Consultant Engineer.
• Cost Of Project : 30 Million L.E
• Description Of Job: Supervises Tower Works +Revision Of Invoices And Quantity Survey And Accept Them+ Acceptation Of Materials And Companies That Specialized To Execute The Work.
• Description Of Project: Implementation Of Educational Careers Syndicate Tower In Elminia Governorate Of Area 1500 M2 Consists Of Basement+ Ground Floor And 11 Typical Floors On Deep Foundations(1000 Piles Of 60 Cm Diameter And 11 M Depth Executed By Using C.F.A Method And Raft Of Thickness 1.2 M As A Piles Cap)
-Sharing In Making An Experiment Of Loading On One Pile In The Building Which Its Load Reached To 150 Tons.
(B):-
• Project: Implementation Of Craftsmen City. • Cost Of Project : 25 Million L.E
• Description Of Job: Supervises Works +Revision Of Invoices And Quantity Survey And Accept Them+ Supervises Infrastructure Works For The Whole City(Water And Wasting Networks),Complete Roads Network Of The Project ,Telephone Lines ,Electricity Cables Extending +Responsible Of Concrete Laboratory In The Site And Quality Control Tests +Finishing Works.
• Description Of Project: Implementation Of Craftsmen City In Elminia Consisting Of 200 Craft Unit.