Your browser is outdated!

To ensure you have the best experience and security possible, update your browser. Update now

×

Marcelo Gil

Lead Mechanical Engineering

Marcelo Gil
Sao Paulo Brazil
Professional Status
Employed
Open to opportunities
About Me
LANGUAGES: Proficiency in English, Spanish and Portuguese (native).

Specialties: ABNT Standards Committee for Process Centrifugal Pumps – Brazil.

REGISTRATION CREA – 0600854808 – SP (affiliation with engineering council of Brazil since 1979).

PUBLICATION: Presenting NR-13 to foreign staff of BECHTEL (Frederick – USA).

SPECIFIC TECHNICAL EXPERTISE/SPECIALIST COURSES:
Education for Quality System (Philip Crosby) – 40 hours;
SEQ-ISO 9000 / Quality Assurance for Selecting and Using Technical Standards – 40 hours;
Selecting Centrifugal Pumps (KSB) – 20 hours;
ABNT Standards Committee for Process Centrifugal Pumps – 6 months.
Resume created on DoYouBuzz

Offshore Lead Mechanical Engineer

WorleyParsons (UK / Brazil)
August 2012 to June 2013
London
United Kingdom
  • STATOIL – PEREGRINO FIELD OFFSHORE: Detailing of mechanical engineering for the Peregrino II field located 85 kilometers offshore Brazil in the Campos basin at about 100 meters of water depth covering engineering services, procurement activities interfaces and management assistance for the Peregrino Phase II facilities project. Battery limits interface and overall system responsibilities goes from the Electrical Submerged Pumps down hole and into existing FPSO for integration with the existing production facilities, including the main activities, as follows: Concept Study, FEED study, identification, procurement and follow up of delivery of Long Lead Items (LLI), preparation of technical basis for the EPC bid packages and assistance in technical bid evaluation, hook up and commissioning support, preparing the commissioning system and the commissioning procedures, updating and evaluation of overall schedule for the project, support on process to obtain the required Brazilian Governmental Authority approvals and final documentation for hand over to Operations (Life Cycle Information - LCI).