Marcelo Gil

Lead Mechanical Engineering

Marcelo Gil
Sao Paulo Brazil
Professional Status
Employed
Open to opportunities
About Me
LANGUAGES: Proficiency in English, Spanish and Portuguese (native).

Specialties: ABNT Standards Committee for Process Centrifugal Pumps – Brazil.

REGISTRATION CREA – 0600854808 – SP (affiliation with engineering council of Brazil since 1979).

PUBLICATION: Presenting NR-13 to foreign staff of BECHTEL (Frederick – USA).

SPECIFIC TECHNICAL EXPERTISE/SPECIALIST COURSES:
Education for Quality System (Philip Crosby) – 40 hours;
SEQ-ISO 9000 / Quality Assurance for Selecting and Using Technical Standards – 40 hours;
Selecting Centrifugal Pumps (KSB) – 20 hours;
ABNT Standards Committee for Process Centrifugal Pumps – 6 months.
Resume created on DoYouBuzz

Rotating Mechanical Equipment Supervisor

CNEC-WorleyParsons Engineering, Brazil
May 2007 to 2011
Sao Paulo
Brazil
    1. PETROBRAS – RPBC (DIESEL) PLANT. Detailing of mechanical engineering for Treatment Unit 2 (UT 2), consisting of Diesel Hydrotreating Unit 2 (HDT 2 - U-32313); Hydrogen Generation Unit 2 (UHG 2 - U-22311); Sulfur Recovery Unit 4 (URE 4 - U-42225); DEA Treatment Unit 3 (DEA 3 - U-32323); Water Treatment Unit Acid 2 (UTAA 2 - U-25126); Ammonia Converter 2 (U-25323); TR-25 124 - Cooling Tower at UT 2; Blow Down System; System Pump Out; Unit of cryogenic nitrogen storage; SE-32313 - Power Substation UT 2 and interconnections; CCL-23 - House Local Control UT 2 and interconnections; Demineralization System - DESMI; Expansion of the CAC (Central Air Compressed RPBC) and all interconnections, including pumps, mixers, tanks and vessels (NR-13).
    1. BASF – SODIUM METHYLATE PLANT. Detailing of mechanical engineering for Sodium Methylate Plant, with production of 15 kt/y, including consolidation of Equipment Lists, technical Data Sheets issues, vendors Calculations Reports, technical analysis for pumps / loading-unloading arms / ejectors / static mixers / Venturi Gas / HVAC specifications and elaboration of materials requisitions (MRs), Technical Analysis of equipment and packages, Vendors Drawings verification for all equipment of ISBL and OSBL areas.
    1. PETROBRAS – RPBC (GASOLINE) PLANT. Detailing of mechanical engineering for CRACKED NAPHTHA HYDRODESULFURIZATION UNIT (U-2316), DEA TREATMENT UNIT (U-22323), COKER NAPHTHA HYDROTREATING UNIT (U-2315), SUBSTATION (C-09) and LOCAL CONTROL HOUSE (CCL-18), including: 48 pumps (SULZER as API-610), 4 oil mist lubrication systems (LUBRITECH), 2 centrifugal compressors (SIEMENS and ELLIOTT as API-617 with turbine driven as API-612) and 2 reciprocating compressors (DRESSER-RAND and HOWDEN as API-618).