PETROBRAS – RPBC (DIESEL) PLANT. Detailing of mechanical engineering for Treatment Unit 2 (UT 2), consisting of Diesel Hydrotreating Unit 2 (HDT 2 - U-32313); Hydrogen Generation Unit 2 (UHG 2 - U-22311); Sulfur Recovery Unit 4 (URE 4 - U-42225); DEA Treatment Unit 3 (DEA 3 - U-32323); Water Treatment Unit Acid 2 (UTAA 2 - U-25126); Ammonia Converter 2 (U-25323); TR-25 124 - Cooling Tower at UT 2; Blow Down System; System Pump Out; Unit of cryogenic nitrogen storage; SE-32313 - Power Substation UT 2 and interconnections; CCL-23 - House Local Control UT 2 and interconnections; Demineralization System - DESMI; Expansion of the CAC (Central Air Compressed RPBC) and all interconnections, including pumps, mixers, tanks and vessels (NR-13).
BASF – SODIUM METHYLATE PLANT. Detailing of mechanical engineering for Sodium Methylate Plant, with production of 15 kt/y, including consolidation of Equipment Lists, technical Data Sheets issues, vendors Calculations Reports, technical analysis for pumps / loading-unloading arms / ejectors / static mixers / Venturi Gas / HVAC specifications and elaboration of materials requisitions (MRs), Technical Analysis of equipment and packages, Vendors Drawings verification for all equipment of ISBL and OSBL areas.
PETROBRAS – RPBC (GASOLINE) PLANT. Detailing of mechanical engineering for CRACKED NAPHTHA HYDRODESULFURIZATION UNIT (U-2316), DEA TREATMENT UNIT (U-22323), COKER NAPHTHA HYDROTREATING UNIT (U-2315), SUBSTATION (C-09) and LOCAL CONTROL HOUSE (CCL-18), including: 48 pumps (SULZER as API-610), 4 oil mist lubrication systems (LUBRITECH), 2 centrifugal compressors (SIEMENS and ELLIOTT as API-617 with turbine driven as API-612) and 2 reciprocating compressors (DRESSER-RAND and HOWDEN as API-618).