I have more than 25 years’ experience in QA/QC management with over 8 years in supervisory role manufacturing company and over 17 years as Deputy QC Manager, Snr. Inspection Engineer, QA/QC Engineer, QC Welding Engineer, QC ( Welding, Mechanical, Piping and Structural ) Inspector of Offshore and Onshore Oil & Gas Construction components such as Jacket, CPP Platform, Petrochemical, Refinery, LNG pipeline, Shipbuilding and Power Plant Energy.
at JFE Engineering - Jakarta and MES Engineering co. ltd, Batang - Central of Java
Indonesia
The work scope will be supervision of the contractor’s inspectors in inspecting all mechanical aspects of the tanks/vessels in accordance with Code and Project Specifications, including material/equipment quality, fabrication at shop, testing and reporting. And also manage and monitoring construction site activity to achieve Project Quality level of the Cone Roof Tanks (Fixed-roof type) to be used for storage of Lubrication Oil, made from Carbon Steel Plate, between 100 to 300 kilo-liters in size in accordance with API 650, there will be twenty six (26) tanks/vessels (in the first stage).
Projects:
Delta - i Project at Cikarang – Client PT. Idemitsu Lube Techno Indonesia. (May 2018 ~ April 2019)
Participated in preparing and implementing of surveillance program to assess contractor work progress, ensure and or verify contractor work product are completed meeting project quality levels.
The intent of this activity is to recognize critical project stage and activities early enough to put adequate resource in place to identify and address potential quality issues, thus avoiding non conformity and deficiencies and their associated impact on cost and schedule.
Projects:
Central of Java Power Plant 2 X 1000MW - Mitsui E&S co.ltd (October 2019 ~ September 2023)
Monitoring of Implementation Quality Management System running smoothly at the contractors and regularly active to conducted Audit of System Quality Management. Participate in developing, support in establishing and implementing and continuous improvement Quality Management System in accordance ISO 9001 – 2015 standard requirements.
Established Quality Management Systems for Material Handling, Fabrication, Human Resources Department and HSE Department and Conducted Regularly Audit, Manage, Monitoring QMS running smoothly based on ISO 9001:2015 Standards.
PT. Chandra Asri Petrochemical (Turn‐Around Maintenance – TAM) ‐ Cilegon Indonesia.
Job Function:
Supervision, Monitoring and Manage of the contractor’s inspectors in inspecting all mechanical aspects of the projects.
Monitor and supervise the activities and work of Inspectors to ensure that all work within a specific area of the inspection activity is carried out in an efficient manner which is consistent with operating procedures and policy.
Oversee inspection of pressure vessel, piping & steel structural pre‐ fabrication and installation activities conducted at contractors / sub‐ contractors facilities and at site.
Assist in piping & structural material receiving inspections at site and review original material certificates for compliance to codes and specifications where required.
Ensure traceability is maintained for the fabricated part as stated in the project specifications.
Monitor and ensure the inspections are carried out to the required levels as mentioned in the ITPs.
Ensure effective execution of inspection schedules of the assigned unit in line with the overall inspection plans. Identify material/equipment required for the planned inspection
Project :
PT. Chandra Asri Petrochemical Expansion Naphhta Crackers Projects.
Directly Assessed and Evaluated the Contractor QA/QC activities during fabrication. Participated in preparing and implementing of surveillance program to assess contractor work progress, ensure and or verify contractor work product are completed meeting project quality levels. The intent of this activity is to recognize critical project stage and activities early enough to put adequate resource in place to identify and address potential quality issues, thus avoiding non conformity and deficiencies and their associated impact on cost and schedule.
at HTC (Heidelberg Technology Center) Bogor - East Java
Indonesia
To ensure that the structural steel fabrication and installation activities are completed meeting project quality levels.
√ Oversee inspection of steel structural pre-fabrication and installation activities conducted at contractors / sub-contractors facilities and at site. √ Assist in structural material receiving inspections at site and review original material certificates for compliance to codes and specifications where required. √ Ensure traceability is maintained for the fabricated part as stated in the project specifications. √ Monitor and ensure the inspections are carried out to the required levels as mentioned in the ITPs. √ Witness the dimensional control inspections on the pre-fabricated and as well on the installed parts. √ Co-ordinate with other disciplines for interface activities, for example civil foundation interface with structural. √ Monitor the structural welding activities inclusive of fit up / dimensional control inspections. √ Monitor the contractor uses only qualified welders and follows the approved welding procedures. √ Witness NDT / review NDT reports as required. √ Final inspection, generate punch lists and follow up of the same for close out. √ Verify Contractor, Subcontractor Quality management systems, plans, procedures, and processes are in place. √ Monitor quality, issue non-conformance reports when quality deficiencies are noted and set in motion the corrective actions jointly with contractor. √ Prepare weekly or monthly quality reports to be submitted to Construction Manager.
Main Contractor of KPC Project at Sangatta - East Kalimantan
Indonesia
Project Quality Management (Structural, Mechanical and Welding) Sangatta – East Kalimantan Indonesia √ Ensuring Sub – contractor correct Assembly / Installation as per approved drawings and procedures. √ Ensuring the equipment or material Edge Precision and Preparation. √ Checking and accepting tolerable deviation. √ Reviewing and Checking Welder’s Certificates. √ Reviewing Project Specifications. √ Reviewing Sub-contractor Procedure as per Specifications and Requirements. √ Reviewing applicable WPS in line with Project specifications and requirements. √ Review Recording of WPS, PQR and Material Certificates. √ Monitoring, Managing, Supervise of Sub-contractor works as per requirement. √ Planning of production and Inspection activities. √ Final checking of Welding quality and dimension for release. √ Reviewing of MDR report. √ Compiling and reviewing MDR submissions for internal, 2nd and 3rd party approval.
An assistant project QC manager is in charge of revising the project work plans so that these satisfy all the needs and requirements.
An assistant project QC manager is entrusted with the evaluation of the issues that can crop up in future and can obstruct the smooth functioning of the project.
It is the duty of an assistant project QC manager to conduct a precise analysis of the project so that the firm gets some information about the returns that can be expected from the project.
A project QC manager forms various teams for smooth functioning of the project and often trusts his assistant to lead the team. So, it becomes very important that the assistant project QC manager has adequate leadership skills to help drive his team to give their best in the project. - An assistant project QC manager is also responsible for the speedy completion of all the assignments entrusted by the project manager. - The job of an assistant project QC manager involves maintaining good relationships with the supervisors and the workers. We often see that many projects are not completed on time due to the innumerable differences between the management and workers.
An assistant project QC manager can help bridge the differences by highlighting them to the project manager. This way, an assistant project QC manager can act as a mediator between people he works under and people who work under him. An assistant project manager is not only responsible for maintaining harmonious relationships with the workers, but he is also expected to ensure that the clients and investors are satisfied with the way things are being done.
An assistant project QC manager is responsible for maintaining records regarding the on-site control functions. While a project is being carried out, a project manager may ask the assistant project manager to keep a day-to-day record of the various aspects involved in the project. These can include keeping a track of the team-hours, expenses etc. _ An assistant project QC manager is also responsible for keeping his team updated with the changes in the organization through effective communication, presentations etc. This helps in transparency and also helps in building the morale of the team. - An assistant Project QC manager is also responsible for helping the project manager with quality-control programs to ensure that the equipment is in good condition and that equipment which has gone through wear and tear is replaced immediately.
√ Reviewing Detailed Drawing NDT for Structure or Construction the Project. √ Determining Weld Preparation Joint Connection in Detailed Structural Drawing prior to release for production. √ Determining Welding Procedure Specification for use in Detailed Structural Drawing prior to release for production. √ Reviewing Welding Documentations Compliance (Approved Welding Procedure Specification, Procedure Qualification Record and subsequent procedures). √ Preparing Procedure and Specification Quality Control Plan. √ Liaising with the Client on requirements for Project specific Procedure and Specification. √ Compiling and managing QA/QC documentations such as Welding Procedure Specification, Weld Preparation Joint, and NDT recordings during fabrication. √ Approving and releasing Detailed Drawing for Piping and Structural Components for Installation and Construction.
Projects: Platong Gas II Development Project (Chevron Thailand Exploration & Production), Kipper Tuna Turrum Project (Esso Australia Resources Pty Ltd), North Rankin B Platform Sub Structures Project (Woodside Australia), Maersk Peregrino FPSO Module Fabrication Project (Maersk Denmark), Gorgon Project (Barrow Island LNG Plant Australia).
√ Preparation of Daily Welding Plan and Activities. √ Checking of all Welding activities preparation. √ Managing records of Consumables and logistic preparation for welding activities. √ Checking of approved Weld Symbol Details on Shop Detailed Drawings. √ Checking of appropriate detailed scale usage for detailed enlargement of Structural Steel components as per approved drawings. √ Ensuring proper Cutting and Marking of Structural Steel components as per approved drawings. √ Ensuring correct Assembly / Installation as per approved drawings and procedures. √ Ensuring Edge Precision and Preparation. √ Checking and accepting tolerable deviation. √ Reviewing and Checking Welder’s Certificates. √ Reviewing Project Specifications. √ Reviewing applicable WPS in line with Project specifications and requirements. √ Preparation of Procedures and Specifications Quality Control Plan. √ Monitoring and record of NDT status. √ Planning of production activities. √ Final checking of Welding quality and dimension for release. √ Reviewing of NDT report. √ Preparing Weld Summary Sheet for Approval by Client and Third Party Inspectors. √ Recording of WPS, PQR and Material Certificates. √ Compiling and reviewing MDR submissions for internal, 2nd and 3rd party approval.
Roles and Responsibilities: √ Preparing Dock Trial & Sea Trial Procedures. √ Preparing Inspection Test Plans. √ Checking welding documentations and approval compliance; e. g: WPS, PQR and Material Release Check Sheet. √ Preparation of inspection report. √ Recording of plate (material) documentations. √ Performing welding fit up, scantling, vacuum, air, hose, dye penetrates tests as well as other visual inspection. √ Performing piping visual, routing and pressure tests. √ Reviewing RI film & other NDT Reports. √ Reviewing of Shaft & Propulsion System alignment. √ Conducting Lightship Experiment & Survey. √ Collating documentations for MDR submissions.
Roles and Responsibilities: √ Verification of compliance to applicable Process Control Specifications & Quality Control Plan. √ Preparation of Assembly Instruction for approval. √ Co-coordinating with Training Department for Manpower Qualifications compliance. √ Supervising and coordinating technical personnel in performing inspections to ensure compliance with approved Assembly Instruction, Process Control Specification and Quality Control Plan. √ Preparing Production and Manpower Guidelines relating to specification restrictions, material, process requirements. √ Liaising with other agencies, engineering authorities and/or clients on production and process assurance issues. √ Leading improvement projects to increase Productivity and Process capability. √ Production Planning and execution under Controlled Condition. √ Production Quality Assurance and Improvement monitoring through product characteristics, modified Work instruction as necessary as well as effective & efficient maintenance and usage of equipments.
Achievement : √ Improvement of Step Motor Assembly Lines Certification; Dec 2002, Japan.
provide and maintain the project work plans so that these satisfy all the needs and requirements.
All activities of project is entrusted with the evaluation of the issues that can crop up in future and can obstruct the smooth functioning of the project
Keep and ensure all activities of the project are accordance with specification and requirement, also schedule met with target.
Welding Inspector
Welding Supervision
Inspection & Quality Control
Organizing and Coordinating Welding, NDE, and PWHT
Review Welding Procedures and Welder Qualification
Well conversant with Welding processes especially GTAW, SMAW, SAW and GMAW
Welding Engineer
Well conversant with International codes like ASME sec IX, sec V, sec II C, B31.1, B31.3, AWS D1.1, API 1104, API 5L, API 650
Welding of materials Carbon steel, Low temperature carbon steel and Austenitic Stainless steel, Duplex SS and Super Duplex SS
Well conversant with NDE methods like Radiograph Test, Ultra Sonic Test, Penetrant Test, MT
Well conversant with Testing of Material such as Tensile & Yield Strenght Test, Impact Test, Macro etch Test and Hardness Test.
QA/QC Supervisory
Verification of compliance to applicable Process Control Specification & Control Plan
To direct and coordinate technical personnel in performing inspections to ensure the workers compliance with established Assembly instruction, Process Control Specification and Control Plan
Contacts personnel of other agencies, Engineering or Client to exchange ideas, information or offer technical advice concerning process matters
Drive improvement project to increase Productivity, Process capability & Quality improvement
Plan and Carry out Production under Controlled Condition and for Direct Liaise to Customer and Supplier, Monitor Quality Improvement