Honest person and well intended for keeping constant productivity improvement, and making the things right by applying ethical and professional principles
Resume created on DoYouBuzz
  • Project Phases Developement
    General & detailed scope definition, Engineering requirements & specifications, Planning & execution strategy definition, Resource allocation, Logistics involved, Detailed scheduling, Cost estimate & budgeting, Financial planning, Execution plan & progress monitoring, Risk Assessment, Comissioning & Delivery to client, Final reporting.
    Expert
  • Project Planning & Detailed Scheduling.
    Detailed scheduling by using Critical Path and PERT Technics, highlighting critical tasks and scheduling parameters,such as start and finish dates, free floating time for each task, etc.
    Expert
  • Project execution strategy definition
    Depending upon project nature and environment conditions, available resources among other things, strategy for execution is to be defined.
    Expert
  • Project execution optimization.
    From start and up to full completion, project optimization is carried out by monitoring actual progress, so proper decisions can be taken.
    Expert
  • Financial Plan & Cost Monitoring
    Prior to start, and even before bidding, a financial plan is created in order to ensure monetary sufficiency for materials purchasing, personnel wages and resources invoicing among others for a continuous execution. This implies that costs involved have to be monitored, and correct irregularities, if any. This also provides the actual financial status of the project.
    Expert
  • Multidisciplinary Linking
    Capability for coordinating multidisciplinary team in order to fulfill project requirements (i.e.: Structural engineering, mechanical, welding, automation systems, etc.)
    Expert
  • Invoicing
    According to the contract terms, invoicing by progress or by specific dates is always a priority, and full gathering of required documents is achieved in order to justify and support the amounts worksheet, so special care about this item is always kept.
    Expert
  • Executive Reporting
    A summarized report containing pertinent information to an specific project at a certain date, such as progress achieved, actual progress vs. scheduled progress, actual cost vs actual income, variations causes, potential risks, QHSE performance, etc. This report is prepared for top level management into the organization.
  • QHSE fully committed
    Regarding these areas (quality, health, safety end environment), full collaboration and full requirements complyment with responsable team and management for those areas is always carried out prior to any project start.
  • Optimization Methods
    CPM, Pert and Network Analysis methodologies are applied when needed for optimization prior and during execution.
  • Operations Management
    Supply chain and logistics analysis are applied, constantly reviewed and linked to actual scheduling.
  • Engineering Management (Basic and Detailed)
    Development of detailed engineering right from philosophy of operations that creates project iteself.
  • Technical Scope
    Identify technical aspects of contract requirements for fulfilment.
  • Administrative Scope
    identify contractor and client commitments during the contract effective time frame for fulfilment, including warranties, trusts, legal and invoicing terms.
  • Legal Scope
    Vigilance of complyment of legal part of contract
  • Experienced Team Builder
    Ability for selecting and gathering qualified
    personnel as needed by project requirements.
  • Full leadership capabilities
    Organize and task assignment to team members in order to fulfill project requirements.
  • Clean and smooth work environment builder
    This is intended to improve productivity by estimulating confidence among team menbers.
  • Task assignation by date
    Especific task assignation to fulfill by determined date for each tam member.
  • With Client
    Client Contract Management and Supervisors for day-to.day comments, progress reporting , and for detecting any additional work not included in the original scope, but needed for job completion. Abilities for negotiating
  • With Suppliers, Vendors and Subcontractors
    Ability to create a smooth relationship with suppliers, vendors and subcontractors , in order to ease material supply and hired services process,
  • With Authorities
    Official authorities oftenly review and check compliance with safety, health at work and environmental requirements among others. Abilities for negotiating these matters have been developed through experience.
  • With Staff & Co-workers
  • New Opportunities detection
    Ability to detect new forthcoming contracts or extensions to currently effective one.
  • Microsoft Project
    Expert level user for this software and fully applied for scheduling and optimizing projects in time and costs.
  • Microsoft Office Suite
    Mid level user of the whole suite; MS Excel used for Budgeting.
  • Google Chrome for Web browsing
  • Google Earth for Overview & Site Locations
  • Quicken Home & Business 2017
    Personal finance software expert user.
  • Adobe Acrobat DC for document editing
  • Structural Engineering Design for Concrete & Steel.
    Based on ACI concrete specifications and codes and AISC Code, structural design can be performed for civil construction.
  • Engineering procedures
    Detailed step-by-step engineering procedures for civil construction and for offshore oil & gas-related facilities installations are able to be done.
  • Engineering calculations
    In order to properly submit these construction and installation procedures, some calculations for structural design and for offshore installations are needed and also capable to perform them.
  • Economic Structure Knowledge
    Advanced knowledge about how an economy is structured, and its principal parameters.
  • Macroeconomics Knowledge
    Advanced macroeconomics knowledge for a full understanding how an economic system works and the effects of variations on its parameters.
  • Project Feasibility Analysis
    Feasibility analysis of a certain project is one of my skills. This includes aspects such as: Return of the investment analysis, optimal location, optimal cost and duration, etc.
  • english (fluent)
    95% Spoken and 95% Written, with ability to keep a fluent conversation and able to manage leadership on business meetings.
  • Managing, planning, executing all Construction Operations regarding an offshore pipeline project
  • Scope of work included shore approaching operations and onshore inland pipelaying.
  • Also included connecting with Pemex existing facilities
  • Fully responsible with client and Company
  • Gerenciamiento de Proyeto para generación de métricas de desempeño de un contrato de Diavaz para Pemex, Estas métricas son las descritas en la metodología del PMI.

Project Management Advisor

Several - Non disclosed
May 2016 to April 2018
Consultant
Mérida
Mexico
  • Improvement on Project Completion Dates and Delivery Time.
  • Detection of Improvement Areas
  • Optimization of costs in some tasks related to their process.
Learn more
  • Planning on construction site. Included prefabricated spool pieces at fabrication yard as subcontract on this project.
  • Edit and present updated schedules to client
  • Optimize actual operations
  • Edit and submit engineering procedures for current operations.
  • Assist to Operations Manager in Optimizing construction methods for pipelay and related tasks for the project.
  • Assist to Operations Manager in reviewing all the class- related items for the fleet of vessels.
  • Diagnostic the performance of the company and suggestions for improvement.
Learn more

Project Management Advisor

Several - Non disclosed
March 2015 to January 2016
Consultant
Mérida
Mexico
  • Improvement on Project Completion Dates and Delivery Time.
  • Detection of Improvement Areas
  • Optimization of costs in some tasks related to their process.
  • Project Manager for 36 inch Pipeline to Dos Bocas. Included civil construction works on onshore existing facilities at Dos Bocas, Tab.
  • Project Superintendent for Submarine pipelines at Litoral Tabasco. Included prefabricated spool pieces at fabrication yard as subcontract on this project.
  • Project Superintendent advisor for Gas Line for Hadera, Israel. Included prefabricated spool pieces at fabrication yard as subcontract on this project.
  • Project Superintendent advisor for Gas Line to Atuabo in Ghana, Africa. Included prefabricated spool pieces at fabrication yard as subcontract on this project.
  • Project Manager for Offshore production facilities at Campeche Bay. Included prefabricated spool pieces at fabrication yard as subcontract on this project.
  • Optimization of support staff in office and offshore,
  • Optimization in offshore operations and project scheduling.
Learn more
  • Sales Target Achieved in 2011
  • Fabrication yard construction optimization accomplished.
  • Optimization of Overhead Staff
  • First awarded contract by Pemex after bidding process.
Learn more
  • Optimization for offshore operations on current pipelay and current contracts. Included prefabricated spool pieces at fabrication yard as subcontract on this project.
Learn more
  • Optimization for marine and construction crew on board Semi 1 & Semi 2 Semisubmersible platforms. Included prefabricated spool pieces at fabrication yard as subcontract on these projects.
  • Optimization for offshore construction operations
  • Optimization of Contracts revenues by executing all listed work items included in contract exhibits.
  • Optimization of crew rotation.
  • 6 year-in-a-row awarded by Client as safest contractor on the field.
Learn more
  • Construction of 27 submarine pipelines at Cantarell field. Included prefabricated spool pieces at fabrication yard as subcontract on this project.
  • Optimization of stafff on board.
  • Opimization of site positioning operations for vessels
  • Optimization of construction schedule
  • Operations management for offshore projects, regarding platform installation, pipelay and maintenance. Included prefabricated spool pieces at fabrication yard as subcontract on these projects.
  • Optimization of all contracts on time frames and costs.
  • Supply chain development system for marine supplies and contract materials.
  • ISO 9000 Quality System implementation
  • CPM and PERT Optimization techniques applied for scheduling
  • Planning all projects form begginning at bidding phase
  • Project engineering and issuing construction procedures
  • ABS certification for all construction procedures on executed projects between 1994 and 1997.
  • Coordinating and optimizing all marine and construction crews on board the fleet of vessels.
Learn more

Civil Engineering

Facultad de Ingeniería UADY

September 1976 to December 1980
Bachelor degree on civil engineering, concrete and steel structures specialty branch. Remarkable Notes.

High School

CUM

September 1973 to June 1976
High School Degree, Mathematics and Physics branch
  • Classical
  • Rock (classical, progressive, indie)
  • New Age
  • Jazz
  • Military
  • Documentary
  • History
  • Thriller
  • Romantic
  • Drama
  • Action
  • Classic
  • Modern
  • Topics about Economics