Your browser is outdated!

To ensure you have the best experience and security possible, update your browser. Update now

×

Ijaz Akbar

Ijaz Akbar

CV

32 ans
Gujranwala (52461) Pakistan
Apprenti En simple veille
I have been an excellent student throughout my educational career. I never settle for anything less than best. The proof, I never passed a single exam without an award. I had achieved a second position and a ‘2 Gold Medals’ in Matriculation, Associate Diploma, and Bachelor's respectively. I managed to win scholarships at a technical college from ‘Pakistan Council of Scientific and Industrial Research’ and so it from PBTE (Punjab Board of Technical Education) Lahore.
CV réalisé sur DoYouBuzz

Production Engineer

Master Industrial Complex, Sadhoki Pakistan
Février 2018 à août 2018
  • To Enterprise the Production demands and fulfill the Quality standards.
  • Guide and trained the team of production line to optimize the hourly based Production.
  • Minimized the waste and improve recycling to improve productivity.
  • To Design, Built and run an Energy efficient Car in SEM Asia In Singapore.
  • Managed logistics of 'Seven Teams' from Pakistan to Singapore
  • Worked in precision drilling tools, Crushing, Testing and substitutes mixing departments
  • Knowledge of production control and QC/QA and HS&E audits in cement Industry.
  • Studied aircraft's engine and propulsion system overhauling
  • Worked with highly precise aircraft jigs & fixtures used in assembly & maintenance
  • Learned and assisted in maintenance of tools like moulding, dies and moulds.
  • Assistance in Mould polishing, machining and CNC metal working.

Master In Sustainable Industrial Engineering

Genie Industrial Grenoble INP

Depuis septembre 2018
Quality & Process Development/SQL/Management/Microeconomics and Sustainable Development.

Bachelor of Science in Mechanical Engineering

Genie Mechanic

Septembre 2013 à juin 2018
Studied, CAD/CAM, Manufacturing/Mechanic of Machines/Industrial Economics/Control System/Calculus/Mechanics of Materials and Engineering Dynamics.
  • Basket Ball
  • Badminton
  • Woolly-wall
  • Prepare and managed Production plans to meet the top deadlines.
    Bon niveau
  • Organize and coordinate the manufacturing process
    Bon niveau
  • Prepare and manage Industrial tools
  • Intervene maintenance tools and methods
    Avancé