Change Out Catalyst Project at Pertamina RU-II Dumai, 2015
Change Out Catalyst Project at Pertamina RU-VI Balongan, 2015
Change Out Catalyst Project at Pertamina RU-V Balikpapan, 2015
Loading Catalyst Project at RFCC Pertamina RU-IV Cilacap, 2015
Others: -Responsible for stock or status consumable, tool, and equipment at workshop
Make material requirement of project and request for quotation to vendor, and finally make a purchase requirement order to purchasing division
Became an engineer in the project with the responsibility of coordinating with the supervisor or team leader to define the procedures and equipment for execution of the project, coordinated with the owner during the project, also making all the documents for a report on the project
Company Description
Plant Service Company in Petroleum and Petrochemical Industry
Preliminary Design of WTP Cap. 5000 Lps at Jatiluhur, 2014
EPC Project of WTP Cap. 500 Lps at Moya, Tangerang City, 2013-2014
Pipeline 6” x 40 km (Steel Pipe) Project at Bojonegoro City, 2011-2012
Others:
Team member for design water treatment project as mechanical engineer
Familiar to design pumping system, pipe sizing, hydraulic calculation, and other about mechanical design for water treatment process -Detailing drawing and technical advice for construction at site