EPC Project of WTP Buaran 3 Cap. 3000 Lps at Moya, Jakarta City, 2022 - Present
EPC Project of Transmission Pipe DN800, 600, 500, 450 x 10 km (Steel Pipe) and WTP Cap. 1000 Lps at Moya, Semarang City, 2019
EPC Project of Uprating WTP Cap. 1575 Lps at TKCM, Tangerang City, 2018
Others:
Create and manage mechanical planning for support the implementaton of civil and structure engineering project
Collect and compile design data and information related to mechanical planning in order to map out the infrastructure equipment plan and development
Prepare mechanical equipment planning drawings and prepare detailed drawings for concept design and detail design
Apply and implement national and international standards of mechanical equipment
Prepare the bill of quantities and pricing plans related to mechanical works planning
Communicate with the owners, consultants, and sub-contractors in relation to mechanical items on projects
Mechanical Engineer
PT Moya Indonesia
May 2016
to April 2018
Transmission Water Pipe DN600, DN500 x 12 km (HDPE) Project at Cikarang City, 2017
Piping & Pump Reservoir 1 x 2000 m3 Project at KSB Cikarang City, 2017
Piping & Pump Reservoir 2 x 2000 m3 Project at Villa Mutiara Cikarang City, 2017
EPC Project of WTP Cap. 500 Lps at Bekasi City, 2016
Design Pipe Transmission & Distribution (HDPE) Project at Tangerang City, 2016
Others:
Familiar to design pumping system, pipe sizing, hydraulic calculation, and other about mechanical design for water treatment process
Make detail engineering design including detail drawing and bill of quantity
Project Engineer
PT Dialog
September 2014
to May 2016
Change Out Catalyst Project at Pertamina RU-II Dumai, 2015
Change Out Catalyst Project at Pertamina RU-VI Balongan, 2015
Change Out Catalyst Project at Pertamina RU-V Balikpapan, 2015
Loading Catalyst Project at RFCC Pertamina RU-IV Cilacap, 2015
Others: -Responsible for stock or status consumable, tool, and equipment at workshop
Make material requirement of project and request for quotation to vendor, and finally make a purchase requirement order to purchasing division
Became an engineer in the project with the responsibility of coordinating with the supervisor or team leader to define the procedures and equipment for execution of the project, coordinated with the owner during the project, also making all the documents for a report on the project
Mechanical Engineer
PT Bestindo
March 2010
to September 2014
Preliminary Design of WTP Cap. 5000 Lps at Jatiluhur, 2014
EPC Project of WTP Cap. 500 Lps at Moya, Tangerang City, 2013-2014
Pipeline 6” x 40 km (Steel Pipe) Project at Bojonegoro City, 2011-2012
Others:
Team member for design water treatment project as mechanical engineer
Familiar to design pumping system, pipe sizing, hydraulic calculation, and other about mechanical design for water treatment process -Detailing drawing and technical advice for construction at site