Your browser is outdated!

To ensure you have the best experience and security possible, update your browser. Update now

×

Maryam Hesami

CEM Project operation director

Employed Available
Experienced Operation director with a demonstrated history of working in the telecommunications industry. Highly Skilled leading technical teams into delivering projects of Mobile Operators. Have proper experience with delivering of Smart care Solution as newly project in telecommunications industry .
Resume created on DoYouBuzz

WCDMA Optimization and Planning Engineer

Huawei Technologies Co.
August 2014 to December 2015
Full-time
Tehran
Iran
  • Interacting with customer in weekly presentations, reporting sessions and meetings
  • Tuning a wide domain of parameters including Power Control, Cell Admission Control, IntraFreq/IRAT HO, Load Control (LDR), Directed Retry (DRD) and idle mode parameters for network improvement
  • Troubleshooting and optimizing parameters in order to improve the KPIs ,reducing congestion and drops; improving IRAT, SOFT HO, Paging, CSSR, RRC Connection and RAB Establishment Success for voice, packet and high speed
  • Performing consistency check to ensure that parameters that were set in the network was aligned with the agreed baseline
  • Network audit and capacity evaluation for expansion and new site planning
  • Feature Trial and optimization and getting customer's approval for the results
  • RNC parameters mapping after rehoming
  • Deploying OMstar, FMA and NASTAR for Analyzing KPI degradation ,network parameters audit and Missing neighbors. Providing suggestions to customer for network KPI improvement
  • Worst cells optimization
  • Initializing parameter Planning for more than 2000 sites in R2/R4 with U-Net software
  • Coverage Optimization (Network Redesign tilts azimuth and parameter changes) in order to improve the KPIs and traffic sharing between neighboring sites without affecting overall coverage/traffic.
  • Finalization SSV(Single-Side-Verification) test methodology with customer
  • SSV Report template Finalization with Custome
  • Getting SSV approval for more than 200 3G sites
  • Finalization WCDMA KPI Formula with Customer and KPI definition in MOS52000
  • Troubleshooting for operator's VIP and VVIP users