Your browser is outdated!

To ensure you have the best experience and security possible, update your browser. Update now

×

Hector Perez

Hector Perez

Central Manufacturing Engineering Manager

WCM Expertise
Management Leader
Automotive Industry
Continuous Improvement Expert
Results Oriented
40 years old
Mexico City Mexico
Employed Available
Focus and dedicated Manager with high technical skills in Continuous Improvement, Plant Layout Leadership & Management skills demonstrated by 10 years of experience, leading new Facility Projects to Lean Layout success.
Resume created on DoYouBuzz
  • WCM Manufacturing Excellence Pillar Expert
  • Autonomous Maintenance (AM) Leader at floor level.
  • Professional Maintenance (PM) Leader at floor level.
  • Workplace Organization (WO) Leader at each plant to eliminate MURI, MURA & MUDA issues.
  • Focus Improvement (FI) Leader for Quick Kaizen, Major Kaizen and Advanced Kaizen
  • Lead Central Productivity team towards improvements and standards development.
  • Lead Central Layout team towards New Plant Layout development.
Learn more
  • Changes and Improvements for the 5 Plant Layouts for GETRAG in China (Nanchang Plant, Ganzhou Plant, Yudu Plant, DCT Plant & Wuhan Plant)
  • Determine Equipment Quantity, Line Balancing, Floor Space Requirements, reduce cost of machinery and operator.
  • Develop & Training of SMED, VSM, DMAIC, Kaizen, PDCA, One Piece Flow Workshops & Lean Layout Corporate Standard
  • Ergonomics - Single Meta Expert
  • DOCUMENTED SAVINGS
    1. Nanchang Plant - G1 Layout
    • 20% Space Saving
    • 65% Reduce Total Travel Distance
    • Reduce from 65 m2/1000 transmissions to 55 m2/1000 transmissions
    1. DCT Plant - New Plant Development
    • New Plant – Site Selection Analysis – Layout Project Development
    • 50 m2/1000 transmissions vs. Target 55 m2/1000 transmissions
    • 10% reduced in Throughput Time due to closer machines.
    1. DCT Plant - DCT300 Project
    • VSM Analysis for Future Project with WIP Improvements ahead of launching.
    • Develop Plant Layout for 510K Customer Demand
    1. DongFeng - New Plant Development
    • 44 m2/1000 transmissions vs. Target 50 m2/1000 transmissions
    • 30% Chaku Chaku implementation Target achieved so far.
    • 77% Space Utilization vs. 80% Target
    • “U” Shape Configuration in Case CNC Machines
    1. Ganzhou Plant - B6 Project
    • 73% Space Utilization vs. 80% Target
    • Less than 10 meters Travel distance in Cell Configuration.
    • Layout able to change according to the increase of volume with minimal movements.
Learn more
  • Regular Production Update, Line Balancing, OEE Analysis, Calculate quantity of people, Material handling design
  • Operator Instructions, Visual Factory, Process Flow, Downtime Analysis, Operator Balance Chart, Standard Time, Layout Proposal, Kaizen, PDCA
  • Involved at the New Project Implementation, all required documentation, start up and follow up in regular production.
  • DOCUMENTED SAVINGS
  • 8.6 Gears Lappers Machine:
    • 88% Reduction in Changeover Time due to SMED application.
    • 5 S's Implementation.- Reduction of 1 operator per shift (3 total)
  • 8.6 Pinion Gear Hobbing Machines:
    • Cost Avoidance of 3 operators for 8.6 model volume increase.
  • Helical Gears:
    • Reduction of 5 operators due to Layout Changes
  • Boss Project:
    • Relocation and Installation of more than 150 machines with Lean Layout perspective
Learn more

Master Degree

De La Salle University

September 2010 to September 2011
Business Administration (truncated)

Bachelors Degree

De La Salle University

September 2002 to December 2006
Industrial Engineer
  • Lean Layout implementation
    Expert
  • WCM Expertise – Manuf. Excellence Pillar
    Good
  • Kaizen Execution
    Expert
  • Standardize Work
    Expert
  • JIT Tools (OPF, SMED, Kanban, VSM, Yamazumi, Spaghetti Diagram)
    Expert
  • VSM Analysis
    Expert
  • JIDOKA tools (PDCA, Ishikawa Diagram, Paretto Analysis)
    Expert
  • Leader & Mentorship
    Expert
  • AutoCAD
    Expert
  • TimerPro
    Advanced
  • FlexSim
    Good
  • Microsoft Office
    Advanced
  • Spanish
    Expert
  • English (fluent)
    Expert
  • Chinese (basic)
    Intermediate