I am currently searching for new opportunities on rotational basis. Position on drill ship semi-sub or Jack-up. Location preferably Asian Region or Africa. I am immediately available. Willing to work through Agency or under direct contract.
Introduction career summary:
Started as a Marine Engineer in the Navy. For 15 years and was working from Assistant Engineer up till position of Chief Engineer on different Oil- and Chemical Tankers. Held the position of Marine Engineer on Drills Ships. Conducted three (3) projects as Assistant Technical Section Leader up till position of Section Leader for Tension Leg Platforms and DP Drillship sixed (6) generation from construction side until finished first drilling program. Responsible for the Drilling and Marine Equipment. Currently senior surveyor with duties such as: Acceptance Test, Condition Survey, Drops Object Surveys, and Assessments for Personal, Safety, Equipment and Management systems for different type of platforms, such as Landrigs, Jack-ups, Drillships and Semi Subs.
Ship Yard and factory audits: Singapore: Sambawang China: Dalian China: Chengdou China: Baouji Carry out audit to determine the present progress of the planned work scopes. Included reports based on a review and assessment of the project including scheduling, budgets, contract status, project management, technical specifications and manuals, certification, verification of equipment standards and workmanship.
Currently live in China with Permanente Residence. Chinese driver license. Work permit and work license.
Full condition surveys executed on following types of rigs: Land rigs Work over units. Jack ups Semi Subs Drill Ships The purpose of the surveys was to determinate the visual condition and state if maintenance of equipment, in order to minimize downtime caused by a mechanical breakdown during drilling operations and to ensure that the equipment is maintained in a safe working order. Initial intrusive surveys was completed for the drilling equipment, mud system, the well control equipment, the power plant, the electrical equipment, the safety equipment, the maintenance system and the spare parts.
Pre Hire audits: Scope of work included criteria used, such as internationally recognized standards, local legislative requirements, safety and operating standards, the originals equipment manufacturer’s maintenance and operating specifications and accepted oilfield and safety practices.
Ship Yard Audits: The objective of any QA/QC and Project Support services was to provide a verification system that will ensure, to the highest degree possible, that the completed MODU’s equipment and systems comply with the build contract specification and all the applicable Statutory, Class and Industry requirements to ensure the MODU is Fit for Purpose and will operate with the utmost reliability.
The final result was to achieve that the MODU, its systems and equipment where verified for following:
• Inspected at daily intervals during installation; • Constructed or installed in accordance with the Approved Design Criteria; • Provided with traceably and certification to verify the manufacturing and test processes; Operated as stated in the Functional Design Specification (FDS); • Warranted by the builder and or Original Equipment Manufacturer (OEM) for their continued functionality during the rig’s drilling operations.
Applicable Standards and References The criteria which have been used as reference during this survey where internationally recognized standards, local legislative requirements, client’s safety and operating standards, the original equipment manufacturer’s maintenance and operating specifications and accepted oilfield operating and safety practices.
Deliverables: A full detailed report with recommendations and pictures included.