I am currently searching for new opportunities on rotational basis. Position on drill ship semi-sub or Jack-up. Location preferably Asian Region or Africa. I am immediately available. Willing to work through Agency or under direct contract.
Introduction career summary:
Started as a Marine Engineer in the Navy. For 15 years and was working from Assistant Engineer up till position of Chief Engineer on different Oil- and Chemical Tankers. Held the position of Marine Engineer on Drills Ships. Conducted three (3) projects as Assistant Technical Section Leader up till position of Section Leader for Tension Leg Platforms and DP Drillship sixed (6) generation from construction side until finished first drilling program. Responsible for the Drilling and Marine Equipment. Currently senior surveyor with duties such as: Acceptance Test, Condition Survey, Drops Object Surveys, and Assessments for Personal, Safety, Equipment and Management systems for different type of platforms, such as Landrigs, Jack-ups, Drillships and Semi Subs.
Ship Yard and factory audits: Singapore: Sambawang China: Dalian China: Chengdou China: Baouji Carry out audit to determine the present progress of the planned work scopes. Included reports based on a review and assessment of the project including scheduling, budgets, contract status, project management, technical specifications and manuals, certification, verification of equipment standards and workmanship.
Currently live in China with Permanente Residence. Chinese driver license. Work permit and work license.
Initial Rig visit to verify the status and progress prior to start acceptance testing
Critical spare parts verification.
Verification of all documentation in accordance with API and local legislation.
Visual Inspection
Function testing/witnessing of Testing of Equipment and systems
Review of rig certification
Review of the rig preventive maintenance system
Detailed Description
Rigs specifications: Manufacturer: KERUI Model: ZJ40/JJ225/35 Built 2014 / 2015 Power: 1.000 Hp Topdrive: NOV 11SA
Once all equipment and systems were individual tested, a system Integration test was completed and witnessed. During this test a Load / endurance test of the power plant and load / endurance test of the mud pumps were executed.
Special considerations were the high level of H2S expected during drilling operations and ambient working temperature was > 55° Celsius.
Off line testing was conducted and witnessed for HP piping system, standpipe manifold, Choke manifold and BOP stack.
Acceptance program based on Client was reviewed and modified specific for this type of land rigs. Pre-checks were implemented according and based on clients and international standards
In order to prepare the rig, equipment ans systems for acceptance testing were witnessed for installation of auxiliary equipment and systems once the mast was raised.
Start date was one 1 day prior to raising mast as the power plant was operational to complete DROPS object survey from drill floor level up to crown table.
On request of the client 1 experienced and qualified multi-skilled surveyors in order verify the status and the completeness of the rig assembly readiness for starting the acceptance testing with focus on the installation, operational condition and performance of the top drive, power plant, mud process equipment and systems, high pressure mud systems and well control equipment. In order to ensure consistency and adhering to the clients requirements the operators rig management will be technically supported on daily basis by surveyor.
Company Description
Wagenborg Foxdrill was founded in 1967 in Oldenzaal, the Netherlands. Since then Wagenborg Foxdrill has gained a large amount of experience in numerous countries around the world, under harsh conditions both onshore and offshore. The core value of its services is their personnel - highly qualified, engaged people, who persist when others stop.