Your browser is outdated!

To ensure you have the best experience and security possible, update your browser. Update now

×

Gino Blyweert

Gino Blyweert

Offshore industrial.

60 years old
Driving License
Nantong (226000) China
Consultant Available
I am currently searching for new opportunities on rotational basis. Position on drill ship semi-sub or Jack-up. Location preferably Asian Region or Africa.
I am immediately available. Willing to work through Agency or under direct contract.

Introduction career summary:

Started as a Marine Engineer in the Navy. For 15 years and was working from Assistant Engineer up till position of Chief Engineer on different Oil- and Chemical Tankers. Held the position of Marine Engineer on Drills Ships. Conducted three (3) projects as Assistant Technical Section Leader up till position of Section Leader for Tension Leg Platforms and DP Drillship sixed (6) generation from construction side until finished first drilling program. Responsible for the Drilling and Marine Equipment. Currently senior surveyor with duties such as: Acceptance Test, Condition Survey, Drops Object Surveys, and Assessments for Personal, Safety, Equipment and Management systems for different type of platforms, such as Landrigs, Jack-ups, Drillships and Semi Subs.

Ship Yard and factory audits:
Singapore: Sambawang
China: Dalian
China: Chengdou
China: Baouji
Carry out audit to determine the present progress of the planned work scopes. Included reports based on a review and assessment of the project including scheduling, budgets, contract status, project management, technical specifications and manuals, certification, verification of equipment standards and workmanship.

Currently live in China with Permanente Residence.
Chinese driver license.
Work permit and work license.
Resume created on DoYouBuzz

Surveyor

Consultant
Since September 2012
Netherlands
  • Work in close liaison with offshore installation management during operations and verify maintenance of surface Drilling Equipment and Production Equipment and analyze and resolve operational problems in drilling categories by evaluating data pertinent to the specific problems. Evaluate data as to scope, effect on existing programs, economic values, long range planning and budgetary considerations. Preparing detailed work scopes for accomplishment during scheduled refits. Recommend new operating methods or physical modifications to improve existing marine and drilling equipment. Estimated costs and prepared justifications and complete expenditure requests as required by contractor. Coordinate and direct overall effort of marine design and drilling equipment, new construction maintenance and repair programs. Implemented corrective action as required to make certain that all elements proceed satisfactorily on schedule within the money and time allowed. Directed work of 3rd parties when assigned. Checked that status and operating reports were written according to established methods of good report presentation. Recommendations made for a further study or reports and maintenance procedures to changes. Approve reports for transmittal to superintendent. Inspect repair work in progress prior to and upon completion of repairs to ensure adequacy of the work within schedule and budget for Marine and Drilling equipment.

Senior Surveyor

FoxDrill
May 2015 to August 2015
Part-time
Muscat
Oman
  • Initial Rig visit to verify the status and progress prior to start acceptance testing
  • Critical spare parts verification.
  • Verification of all documentation in accordance with API and local legislation.
  • Visual Inspection
  • Function testing/witnessing of Testing of Equipment and systems
  • Review of rig certification
  • Review of the rig preventive maintenance system
Learn more

Senior Surveyor

Lloyds Register
Since 2012
Consultant
Serooskerke
Netherlands
  • Full condition surveys executed on following types of rigs:
    Land rigs
    Work over units.
    Jack ups
    Semi Subs
    Drill Ships
    The purpose of the surveys was to determinate the visual condition and state if maintenance of equipment, in order to minimize downtime caused by a mechanical breakdown during drilling operations and to ensure that the equipment is maintained in a safe working order. Initial intrusive surveys was completed for the drilling equipment, mud system, the well control equipment, the power plant, the electrical equipment, the safety equipment, the maintenance system and the spare parts.

    Pre Hire audits:
    Scope of work included criteria used, such as internationally recognized standards, local legislative requirements, safety and operating standards, the originals equipment manufacturer’s maintenance and operating specifications and accepted oilfield and safety practices.

    Ship Yard Audits:
    The objective of any QA/QC and Project Support services was to provide a verification system that will ensure, to the highest degree possible, that the completed MODU’s equipment and systems comply with the build contract specification and all the applicable Statutory, Class and Industry requirements to ensure the MODU is Fit for Purpose and will operate with the utmost reliability.

    The final result was to achieve that the MODU, its systems and equipment where verified for following:

    • Inspected at daily intervals during installation;
    • Constructed or installed in accordance with the Approved Design Criteria;
    • Provided with traceably and certification to verify the manufacturing and test processes; Operated as stated in the Functional Design Specification (FDS);
    • Warranted by the builder and or Original Equipment Manufacturer (OEM) for their continued functionality during the rig’s drilling operations.

    Applicable Standards and References
    The criteria which have been used as reference during this survey where internationally recognized standards, local legislative requirements, client’s safety and operating standards, the original equipment manufacturer’s maintenance and operating specifications and accepted oilfield operating and safety practices.

    Deliverables:
    A full detailed report with recommendations and pictures included.

Drilling Equipment Engineer

Petrobras
2010 to 2012
Rio de janeiro
Brazil
  •  Start-up and drilling of first well.
     Acceptance Test for drilling Equipment.
     Continuously improved and monitored the Computer Management Maintenance System (CMMS) including compliance of planned maintenance activities against performance indicators.
     Carried out root cause analysis of shut down and break down reports specifically looking in to PM/CM requirements.
     Maintained the CMMS with proven best practices, improved the functionality of system based on input from users and own experience to support the Maintenance Philosophy.
     Responsible as a maintenance Manager in his absence.
     Monitored and report the status and quality of the maintenance activities, executed on-board, and the reported through the CMMS, vendor- and other maintenance reports.
     Monitored the maintenance back log.
     Followed up and improve Job Risk Analysis Inspection.
     Follow up and improve Condition Based Maintenance programs
     Monitor and evaluate criticality of each tagged component in accordance with the maintenance philosophy.
     Develop and perform CMMS training for selected personnel on the vessels.
     Advise CMMS project team in develop and implementing the required information.
     Maintenance system MAXIMO
  •  Dry Dock and Planned Maintenance System experience
     Technical Report writing
     Intimate knowledge of Major Class Societies.
     Review and comment on design documents and drawings for hull, marine and drill floor.
     Review and comment on FAT and commissioning procedures
     Attend FAT, installation, MC/EC and final commissioning
     Hand over to operations
     Installing and supervising all machinery to be installed on ship.
     Supervision of Quality Control and Mechanical completions for Drilling and Marine department.
     Supervision of Commissioning for all Mechanical Machinery for Drilling and Marine Department.
     Full commissioning AKMH and Rolls Royce Engine’s.
     Good knowledge of standards, regulations and requirement within the industry (API)
  •  During Construction: Resolving technical queries, project hazard analysis issues, and ensured that all design changes where captured by document control system. Communicated with all Mech Engineers and designers for design changes, vendor data, schedule input and cost data. FAT tests field trips to projects locations and to equipment vendor shops where required.

    During operations Responsible for the maintenance of surface Drilling Equipment and Production Equipment and analyze and resolve operational problems in drilling categories by evaluating data pertinent to the specific problems. Evaluate data as to scope, effect on existing programs, economic values, long range planning and budgetary considerations. Preparing detailed work scopes for accomplishment during scheduled refits. Recommend new operating methods or physical modifications to improve existing marine and drilling equipment. Estimated costs and prepared justifications and complete expenditure requests as required by contractor. Coordinate and direct overall effort of marine design and drilling equipment, new construction maintenance and repair programs. Implemented corrective action as required to make certain that all elements proceed satisfactorily on schedule within the money and time allowed. Directed work of 3rd parties when assigned. Checked that status and operating reports were written according to established methods of good report presentation. Recommendations made for a further study or reports and maintenance procedures to changes. Approve reports for transmittal to superintendent. Inspect repair work in progress prior to and upon completion of repairs to ensure adequacy of the work within schedule and budget for Marine and Drilling equipment.

     Start-up and commissioning:
     Top Drive System: TDS 8 VARCO.
     Elevators VARCO BX 3 and 4 including full overhaul on 6 monthly bases.
     Drawworks ADS 10 including full overhaul and replacing Eaton brake system.
     Pipe Racking System: PRS 8I including replacing gearboxes and brake systems.
     Sullair Air Intensifier system for Drawworks.
     Pipe Conveyor System with optional Loading Arm.
     PS 30 and Rotary table.
     Iron Roughneck AR 5000 including complete overhaul from all hydraulic and mechanical components.
     High Pressure Mud Pumps National 14P-220.
     All deck cranes from National. 1Yearly PM`s done by BRIDON Company.
     Generators CAT 3612 4.3 Mw.
     Reverse Osmosis System for freshwater makers.
     Skidding System BARDEX.
     Marine department including all Seawater pumps and remote operating Valve’s.
     Maintenance system SAP3
  • Reason for leaving: Full production capacity was reached. No drilling operation apart from work-over’s. Nationalisation of crew and staff.

Control Room Operator DP Drill Ship ( 3rd Engineer)

Total
2000 to 2003
Luanda
Angola
  •  Third Engineer in the Marine department in function of Control Room Operator.
     Continuously improved and monitored the Computer Management Maintenance System (CMMS) including compliance of planned maintenance activities against performance indicators.
     Carried out root cause analysis of shut down and break down reports specifically looking in to PM/CM requirements.
     Maintained the CMMS with proven best practices, improved the functionality of system based on input from users and own experience to support the Maintenance Philosophy.
     Responsible as a maintenance Manager in his absence.
     Monitored and report the status and quality of the maintenance activities, executed on-board, and the reported through the CMMS, vendor- and other maintenance reports.
     Monitored the maintenance back log.
     Followed up and improve Job Risk Analysis Inspection.
     Follow up and improve Condition Based Maintenance programs
     Monitor and evaluate criticality of each tagged component in accordance with the maintenance philosophy.
     Develop and perform CMMS training for selected personnel on the vessels.
     Advise CMMS project team in develop and implementing the required information.
  • Reason for leaving: EXXONMOBILE gave me offer for Maintenance supervisor for new KIZOMBA Project (TLP/FPSO)

From 3rd engineer to 2nd engineer.

Finnlines
1998 to 2000
Helsinki
Finland
  •  M/V Transbaltica RORO
     Included were 4 weeks Ship yard in Rodstock, for 5 yearly inspections of Main Engine’s and Stern Ramp.
     Main Engine: WARTSILIA
     Type 6 cyl. VASA 46
     Type 9 cyl. VASA 46
     Aux Engines: WARTSILIA
     Type Vasa 8 R 22
     Additional maintenance executed on Hydraulics automatisations and systems for elevators.
  • Reason for leaving: Finnlines was taken over by Transfenica.

Engineer project manager

Alfa Laval
1995 to 1998
Antwerp
Belgium
  •  Job description: Engineer Project Manager Engineers and designers for carrying out detailed engineer work for Marine projects. Responsible for conceptual and detailed designs and provided necessary technical information for procurement en compliance with tender specs. Control of budget and man-hours including project schedules.
     Follow up, hands-on for Start-up and Guarantee cases of new units on different types of ship.
    Following Equipment:
     Purifiers and clarifiers
     Fresh water generators
     Heat exchangers
     Plate coolers
     Valves and pumps
  • Reason for leaving: ALFA LAVEL Sweden to close Marine Design Antwerp department.

From 4rt Engineer to 3rd Engineer

SA NYHALL
1993 to 1995
Antwerp
Belgium
  •  Gas Tanker NYHALL
     Included were 4 weeks of dry dock in Athens for 5 yearly inspections of Main engines.
     Gas Tanker NYHALL
     Main Engine: B&W 15000 HP
     AUX eng: WARTSILA 6R22

Assistant Marine Engineer to 4th Engineer.

Total Fina
1991 to 1993
Brussels
Belgium
  •  MT FINA AMERICA included 6 weeks Dry Dock in Lisboan with 5 yearly inspections of Engines and Steam boilers.
     Crude oil Tankers 89.000 DWT
     Assisting watch keeping officer during cargo operation
     General works and maintenance
     Main engine: Sulzer RND 22500 HP.
     Steam boilers up to 15 BAR. Make: Saack
     Steam turbines Laval for cargo pumps
  • Reason of leaving: Ships were sold to Greece Company

Supervisor Machine Workshop

B.V.B.A Witters
1985 to 1991
Mortsel
Belgium
  •  Job description: Senior Mechanical Engineer for coordinating 7 team members of Engineers and designers for carrying out detailed engineer work for projects. Responsible for conceptual and detailed designs. Provided necessary technical information for procurement en compliance with tender specs. Control of budget and man-hours including project schedules.
     Custom build parts made on lathe and milling machine.
     New build and proto type machinery for industrial use.
     Modification for Machinery used on construction sides and on Tankers.

Sub Eng Officer (General preventive maintenance)

Navy
1983 to 1984
Zeebruge
Belgium
  •  Shipyard 6 weeks at Antwerp Ship Repair.
     Steam boiler
     Purifiers
     Turbines
     Engine (Rolls Royce)

Bachelor

HZS ANTWERP

3 years Marine Chief Engineer unlimited power.
Learn more

H.U.E.T/BOSHIET

Falck Nutec

Since September 2014
Helicopter Underwater Escape Training with Emergency Breathing System.
Learn more

Certificate Working with Electricity

Lloyds Register

Since 2015
Covering following items:
*Witnessing of factory acceptance tests at the manufacturer's factory or test facility.
*Witnessing of electrical tests on site, for example on board a ship, in shipyard or on an oil rig as part of rail installation.
*The witnessing of site acceptance tests on a project work site.
*The use of outdoor portable tools and electrical equipment.
Introduction course for the lifting appliances training course. for Marine / Energy Surveyors.

Certificate Working Over water

Lloyds Register

Since 2015
Covers the following subjects:
*Ships / Platform to shore transfers, either by boat, basket or helicopter.
*Sea trails.
*Surveys and Inspections offshore.
*Surveys at sea.
*Tank rafting.
*Dead-weight measurements.
*Load Line verification.
*Damage and repair surveys / inspections

Certification Hydro Sulfide Awareness Training

Safety Unlimited, Inc

Since 2015
In accordance with OSHA regulations, 29 CFR 1910 and 1926 and ANSI Standard Z390.1 Also know as H2S certification.

Certification Radiation Awareness

Lloyds Register

Since 2015
General awareness of radiation, where it is found, avoiding exposure and the potential effects of uncontrolled or excessive exposure.
Essential requirements of safety management system, how to report an incident, making safe decisions and choices for health and well being.

Certification Heat Management

Lloyds Register

Since 2015
Danger of working in extreme heat with the awareness of the risks and the choices made to ensure of keep safe, prevent the effects of extreme heat on the body and what to do in emergencies.

Certification High Pressure Testing

Lloyds Register

Since 2015
Responsibilities when systems pressure testing. Assessing the risk and taking the right action. Hazards and controls.

Certifications Hazard Awareness

Lloyds Register

Since 2015
Awareness of the hazards we face at work and be mindful of the potential consequences of any related incidents.
Classification and labeling of chemicals and recognize the symbols and what they mean. Understanding of data sheets and safety advice. This to prevent injury from exposure to hazardous chemicals.

Certification Asbestos Awarenesss

Lloyds Register

Since 2015
Identify asbestos hazards and take appropriate action. Understand and describes different types and where might be find in the industry.

Certificate Anti Bribery & Corruption

LLoyds Register

Since 2015
Ethics and values which apply international regulations and new UK Bribery Act.

Vantage Card

Contractors Unlimited UK

internet based tracking tool that is widely used by oil companies, drilling companies and helicopter operators in UK waters and increasingly used for offshore work in Ireland, Denmark and the Netherlands.

Certificate Working at Height

Helix

Since March 2013
Covering responsibilities when working at height included assessing the risk and taking the right action, checking and fitting PPE, what to do in emergencies.
Learn more

Confined Space Entry

Lloyds Register

Since June 2014
LR Golden Rules
Responsibilities for confined space entry
Risk assessment
Hazard identification
Control methods
PPE (Personal Protection Equipment)
Emergency arrangements and rescue
  • Microsoft Office
    *Microsoft Access 2010
    *Microsoft Words 2010
    *Microsoft Excel 2010
    *Microsoft OneNote 2010
    *Microsoft Power Point 2010
  • Maintenance programs
    *MAXIMO
    *SAP R3
    *STAR
    *SAMS
  • Adobe Creative Suite
    *Acrobat Pro 3
    *PhotoShop CS32
  • OHAS 18001
    Occupational Health and Safety Assessment Series.
  • ISO 9000
    Quality Management Systems Fundamentals and Vocabulary
  • ISO 9001
    Quality Management Systems and requirements
  • ISO 14001
    Environmental management systems – Requirements with guidance for use.
  • ISO 19011
    Guidelines for auditing management systems
  • IMO STCW
    Pacific Maritime Legislation & Regulations.
  • ISM Code 2010
    International safety management code
  • IACS
    Requirements concerning Mobile Offshore Drilling Units.
  • Cap 437
    Offshore Helicopter Landing Areas – Guidance on standards.
  • MODU Code
    Rules for building and classing Mobile Offshore drilling units (2012)
  • API
    American Petroleum Institute standardization program
  • ISO 55001
    Asset Integrity system and requirements.
  • CCS Rules
    China Classification Society, Rules for construction and classification of Mobile offshore drilling units
  • IADC Drilling Manual 2007
    International Association of Drilling Contractors 11th edition
  • IADC Deepwater Well Control Guidelines
    3rd edition 2002
  • Marine Equipment, Drilling Equipment, Well Control Equipment, Low Pressure Mud Systems and Management procedures.
    Survey focused on the mechanical, electrical, well control and marine equipment, also on HSE-related aspects. The primary object of the acceptance survey to ensure that all items of equipment and indeed all of the rig’s systems are fully operational, able to work safely and efficiently during the drilling programme. Verification of the contractual agreements.
  • Fitness
  • Play Guitar, favorite Radio Station MNM
  • Like to travel Asia, Middle East, Africa and Europe.