More than 26 years experience in EPC or PMC, Electrical Engineering, supervision on different steps of onshore or offshore oil and gas projects (Construction, Pre commissioning, Commissioning, Startup, Maintenance) within an international environment with standards and particular specifications relating to oil and gas contracts; supervision of construction in accordance with high level of safety and technical specifications, quality control with establishing of punch list, management of work permits, establishing of procedures, material management, constitution of pre-commissioning and commissioning files, supervision of pre-commissioning / commissioning activities, follow-up of schedule and reporting, meetings organization, management of modifications, utilization of opercom system (ICAPS), project management system (Win PCS), CMMS system (Optimis, Mainta, SAP) and material management system (SAP).
Supervising call for tender for all works in tank Farms buildings (electricity, plumbing, metal works, external woodworks, covering, painting) according client specification
Follow-up on site of the works in order to respect planning; organizing and plan of maintenance works
Choicing of sub-contractors
Supervising the area work programs achievement
Detailed Description
The Caspian Pipeline Consortium is a consortium and a pipeline to transport Caspian oil from Tengiz field to the Novorossiysk Marine Terminal on Russia's Black Sea coast. It is also a major export route for oil from the Kashagan and Karachaganak fields. The diameter of the 1,510 kilometers long oil pipeline varies between 1,016 millimetres (40.0 in) and 1,067 millimetres (42.0 in). There are five pumping stations. The marine terminal includes two single point moorings and the tank farm consists of four steel storage tanks of 100,000 cubic meters each. Pipeline throughflow started at 350,000 barrels per day (56,000 m3/d) and supposed to be increased up to 700,000 barrels per day (110,000 m3/d)..