More than 29 years experience in EPC or PMC, Electrical Engineering, supervision on different steps of onshore or offshore oil and gas projects (Construction, Pre commissioning, Commissioning, Startup, Maintenance) within an international environment with standards and particular specifications relating to oil and gas contracts; supervision of construction in accordance with high level of safety and technical specifications, quality control with establishing of punch list, management of work permits, establishing of procedures, material management, constitution of pre-commissioning and commissioning files, supervision of pre-commissioning / commissioning activities, follow-up of schedule and reporting, meetings organization, management of modifications, utilization of opercom system (ICAPS), project management system (Win PCS), CMMS system (Optimis, Mainta, SAP) and material management system (SAP).
Technical assistance to Total for Commissioning works for Rosa Project on FPSO Girassol
Detailed Description
Located 135 kilometers offshore Angola, the Rosa reservoirs lie 1,000 to 1,500 meters below the seabed, in a water depth of 1,350 meters. The subsea production system comprises 14 producers and 11 water injectors. The production network comprises 225 kilometers of flow, injection, control and service lines and a 1,250-meter riser tower. When Rosa came on stream, it raised the Girassol/Jasmim/Rosa cluster production plateau to 250,000 barrels of crude oil per day.