Daniel MARICOURT

Electrical engineer

Intermédiaire Management
Construction
Field Engineering
Commissioning
Maintenance
Daniel MARICOURT
50 years old
Driving License
Vladimir (600024) Russia
Professional Status
Freelancer
Open to opportunities
About Me
More than 29 years experience in EPC or PMC, Electrical Engineering, supervision on different steps of onshore or offshore oil and gas projects (Construction, Pre commissioning, Commissioning, Startup, Maintenance) within an international environment with standards and particular specifications relating to oil and gas contracts; supervision of construction in accordance with high level of safety and technical specifications, quality control with establishing of punch list, management of work permits, establishing of procedures, material management, constitution of pre-commissioning and commissioning files, supervision of pre-commissioning / commissioning activities, follow-up of schedule and reporting, meetings organization, management of modifications, utilization of opercom system (ICAPS), project management system (Win PCS), CMMS system (Optimis, Mainta, SAP) and material management system (SAP).
Resume created on DoYouBuzz

Electrical Methods Engineer

SPIE OGS - Sonangol
September 2023 to October 2024
  • Assistance to Maintenance Methods Department and offshore maintenance team for all offshore electrical works of the Angolan BLOCK 3/05 (PACASSA, PALANCA, COBO – 13 production platforms and satellites, 1 FSO and 1 accommodation barge)
  • Part of LIFEX Project, preparation and replacement of all obsolete electrical equipment for the fields.

Electrical Methods Engineer - FFSD & Life Extention

SPIE OGS - TotalEnergies E&P Angola
November 2021 to August 2023
  • Preparation and follow-up of main opportunity electrical works during the Full Field Shutdown of Angola' s Block 17 FPSO (Girassol, Clov, Pazflor, Dalia).
  • Introducing Life Extention project on GIRASSOL and DALIA FPSO with replacement of obsolete systems and equipment
  • Preparation of schedule, procedures, power strategy, job cards, Job Risk Assessment...
  • Follow up material request and reception

FFSD Electrical Engineer

Atis - Total E&P Angola
May 2019 to July 2021
Freelancer
Luanda
Angola
  • Integrated in the maintenance technical support team, preparation and follow-up of main opportunity electrical works during the Full Field Shutdown of Angola' s Block 17 FPSO (Girassol, Clov, Pazflor, Dalia)
  • Preparation of schedule, procedures, power strategy, job cards, Job Risk Assessment...
  • Follow up material request and reception
Detailed Description
  • Angolan Block 17 has been invested by Total E&P in 1997. Located at about 200km away from Luanda with 1300m at sea level, the block 17 is composed of 4 FSPO (Girassol, Dalia, Pazflor and Clov) producing about 500 kb/day.

Construction Manager Temporary Site Facilities

TechnipFMC
December 2015 to April 2019
Freelancer
Sabetta
Russia
  • Management for construction and operation of all Temporary Site Facilities such as offices, canteens warehouses, workshops, roads...
  • Working in extreme ARTIC conditions on the project YAMAL LNG
Detailed Description
  • Yamal LNG is located above the polar circle in the estuary of the Ob River, a wild, remote region that is frozen for seven-to-nine months a year and where winter temperatures can drop as low as -50°C.The project aims to tap natural gas reserves totaling more than 4 billion barrels of oil equivalent. To do so, more than 200 wells have been drilled and three liquefaction trains built, each with a capacity of 5.5 million metric tons. Every year, nearly 16.5 million metric tons of LNG will transit through the port of Sabetta, with all LNG production sold to customers in Europe and Asia under 15- to 20-year contracts.

Electrical Construction Superintendent

Air Energi - Total E&P Congo
January 2014 to December 2015
Ulsan
South Korea
  • Lead and coordinate all site activities related to installation and pre-commissioning of electrical equipment of the TLP (Tendon Leg Platform) of the project MOHO NORD during the construction phase
  • Supervise construction up to pre-commissioning and provide support to commissioning & start-up personnel
  • Ensure that construction of the onshore part complies with safety practices, schedule, detailed engineering, contracts and budget
  • Avoid contractor stand-by & delays by prompt response to site queries and unexpected technical problems
  • Ensure reporting, highlighting critical issues which may affect progress, and proposing technical solutions
Detailed Description
  • The $10bn Moho Nord Subsea project is located around 75km off the coast of Pointe Noire in the Republic of Congo. It is the first deepwater offshore project in Congo at water depths ranging between 650m and 1,100m

E&I Construction Superintendent

TECHNIP
June 2013 to December 2013
Freelancer
Koniambo
New Caledonia
  • Responsible on the project KONIAMBO to follow the construction of electricity, instrumentation and cathodic protection
  • Reviewing of punch list
  • Implementation of site design modifications
Detailed Description
  • The Koniambo Nickel project, a joint-venture partnership between Xstrata Nickel and Société Minière du Sud Pacifique (SMSP), is a greenfield pyrometallurgical facility in New Caledonia designed to develop one of the world’s largest and highest-grade nickel laterite deposits.
    The project process ore in a 60,000-tonne-per-annum ferronickel smelter. The smelter will use a standard pyrometallurgical process and a new technology to confine dust.
    Because of the scale of the project and its remote location,the metallurgical plant was constructed in 15 separate modules in Qingdao, China then shipped to site. The modules, which weigh up to 3,500 tonnes each and can be more than 50 metres tall, arrived in New Caledonia between October and December 2010.
    Hatch, in joint venture with Technip, in an integrated Owner’s team is constructing a metallurgical plant; a 350-megawatt coal-fired power station; an ore preparation plant; an 11.5-kilometre ore conveyor; a port; and a construction camp for more than 4,800 people.

Deputy construction E&I Superintendent

Anotech - Technip Russia
September 2012 to March 2013
KSTOVO
Russia
  • On the IKRA Projects, following construction work standards by following safety, production, productivity, quality, and customer-service standards; resolving operational problems; identifying work process improvements.​
  • Approves construction work by conducting inspections.​
  • Maintains safe, secure, and healthy work environment by following and enforcing standards and procedures; complying with legal regulations.​
  • Accomplishes organization goals by accepting ownership for accomplishing new and different requests; exploring opportunities to add value to job accomplishments.​
Detailed Description
  • IKRA project is a 330 thousand t/y Polyvinyl Chloride (PVC) Integrated Plant near Kstovo in the Nizhniy Novgorod region.
    PVC plant will use the cutting-edge European technologies (BAT – Best Available Techniques) that assure the necessary range of PVC with low process costs, and will comply with the most rigorous environmental requirements of the Russian Federation. The plant will produce 300 kilotons of PVC- suspension, 30 kilotons of PVC- emulsion and 235 kilotons of caustic soda. If the current growth rates of PVC consumption across the CIS territory persist, the project’s working capacity is supposed to be extended on the basis of «RusVinyl» LLC

Lead Electrical and Cathodic Protection Engineer

ILF Beratende Ingenieure GmbH (ILF Consulting Engineers)
October 2011 to July 2012
Almaty
Kazakhstan
  • Review and comment documentation and drawings during basic design phase.
  • Preparation of documents (datasheets, specifications...) as per client requirements.
Detailed Description
  • The Project comprises some 1.400 km of 1,067mm diameter X70 pipeline extending from Beineu-Bozoi and from Bozoi-Shymkent.
    Four new Metering Stations, Nos. 2 Compressor Stations and a SCADA & Telecommunication System will be provided.
    The 1st Phase plans a throughput of 6 bcma – the Bozoi-Shymkent section being planned for completion in 2013. The main facilities of Phase 1 are as follows:
    • Pipeline from Bozoi to Shymkent including all PSR stations in-between and branch line / take off connection for local supply
    • Compressor station CS1 at Bozoi, including Repair - Maintenance – Area (RMA), shift camp and metering station to interconnect to Bukhara – Urals
    • Pig Receiver and Metering station in CS2 / Kereit, Tie-in connection to Kazakhstan – China Gas Pipeline (AGP)
    • Pipeline between CS2 / Kereit and Akbulak / Samsonovka, including pig launcher and receiver
    • Gas Metering Station (GMS) and RMA in Akbulak
    SCADA & Telecom for Stage-1, including station control system for CS1
    The 2nd Phase, planned for completion in 2015, will complete the Beineu-Bozoi section and will add the one compressor station to achieve a throughput of 10 bcma. The main facilities of Phase 2 are as follows:
    • Pipeline from Beineu to Bozoi, including all PSR stations in between, interconnection to Bozoi Compressor Station
    • Gas Metering station (GMS) Beineu
    • Compressor station CS4 Karaosek and RMA Kyzlorda
    • Extension of SCADA & Telecom for Stage-2 pipeline section, including station control system for CS4 and integration of metering station in Beineu
    The 3rd Phase, not yet defined and scheduled, plans a throughput of 15 bcma.
Company Description
The company was founded by Pius Lässer in Innsbruck in 1967. In 1969 he was joined by Adolf Feizlmayr and the company expanded into "Ingenieurgemeinschaft Lässer-Feizlmayr" (ILF). Today, the company does business under the name of ILF Consulting Engineers.

In its more than 40-year long corporate development ILF has continued to extend the scope of its activities and expertise to embrace new and diversified engineering disciplines.
Company website

Electrical Construction Supervisor

ILF Beratende Ingenieure GmbH (ILF Consulting Engineers)
September 2010 to September 2011
Thessaloniki
Greece
  • Supervision during construction, pre-commissioning, commissioning phases for electrical, cathodic protection, CCTV, PA/GA and Fire detection activities.
Detailed Description
  • For client Hellenic Gas Transmission System Operator (DESFA) S.A. (Greek Public Company), construction of gas compressor station with two compressors 7.7 MW each to transport gas coming from Turkey and Russia for internal use and in future extension to redirect to Italy through south stream pipeline.

Maintenance electrical superintendent

SPIE OGS - TOTAL E&P YEMEN
May 2007 to August 2010
Sana'a
Yemen
  • Measuring forces and weaknesses of each member of the team, making follow-up and takes action accordingly
  • Making sure the supervisors are trained and have capacities to manage their groups the proper way
  • Performing periodical assessments of supervisors and coaching them to assess their people
  • Organizing meetings with employees to improve work quality level and increase safety results, instructing them on general policies of company, and motivating the group on specific challenges and goals to be reached
  • In charge of staff recruitment such as resume analysis, interviews, and integration of new employees
  • Responsibility for the content of preventive and planed shut down, guarantee relevancy of maintenance procedures, such as repair levels, frequency, tool availability, checklists and records, and making continuous adjustment as required
  • CMMS system (computerized maintenance system) using, collection of feed back such as costs, hours, parts, relevant notes and registers them in the history database
  • Defining proper maintenance planning and scheduling for new equipments; taking delivery of all related documents, and checks encoding is done in database
  • Providing specific site requests, (studies, report, analysis, enquiry)
  • Following up of material requirement and delivering
  • Permanent following training process; minimizing turnover by keeping good relationship, by suggesting moves, mobility and adjustment of manpower
Detailed Description
  • Block 10 in East Shabwa, was awarded in 1987 under a PSA to a joint venture, with Total E&P Yemen (TEPY) as operator.

    This was the beginning of a success story, which materialized in the discovery of oil in several fields (Kharir, Atuf, Jathma, Wadi Tariba) in the Biyad, Saar, and Basement formations. The story is continuing with the materialization of significant reserves in the Basement of Kharir, which have been aggressively developed since 2003.

    Production has started end of 1998. The cumulative production of the Block has passed the milestones of 50 Mb and 100 Mb respectively end 2003 and early 2008. Production is now around 60,000 bopd.

    An intensive activity, in terms of drilling and development projects, along with the use of innovative technologies, are being implemented to meet this target. In parallel, the Yemeni workforce of TEPY has increased significantly, to over 300 employees. Aggressive training programs have been put in place to bring this workforce rapidly to excellent performance.
Company Description
Total E&P Yemen is a subsidiary of Total S.A., a French multinational oil and gas company and one of the six "Supermajor" oil companies in the world. Its businesses cover the entire oil and gas chain, from crude oil and natural gas exploration and production to power generation, transportation, refining, petroleum product marketing, and international crude oil and product trading. Total is also a large-scale chemicals manufacturer. The company has its head office in the Tour Total in the La Défense district in Courbevoie, West of Paris.
Company website

Electrical Supervisor

CEGELEC - Total E&P Angola
January 2007 to April 2007
Luanda
Angola
  • Technical assistance to Total for Commissioning works for Rosa Project on FPSO Girassol
Detailed Description
  • Located 135 kilometers offshore Angola, the Rosa reservoirs lie 1,000 to 1,500 meters below the seabed, in a water depth of 1,350 meters.
    The subsea production system comprises 14 producers and 11 water injectors.
    The production network comprises 225 kilometers of flow, injection, control and service lines and a 1,250-meter riser tower.
    When Rosa came on stream, it raised the Girassol/Jasmim/Rosa cluster production plateau to 250,000 barrels of crude oil per day.
Company website

Commissioning Electrical Supervisor

CEGELEC - Dolphin Energy Ltd
July 2006 to October 2006
Doha
Qatar
  • Organization and supervision of Commissioning works
  • Establishment of electrical Start-up procedures, Temporary lock-off procedures
  • Preparation of daily reports, work schedules, daily organisation meetings
  • External sub-contactors works follow-up, final acceptance, hand over
Detailed Description
  • The major project of Dolphin Energy is the Dolphin Gas Project, which involves the production and processing of natural gas from Qatar’s North Field, and transportation of the gas by offshore pipeline to the United Arab Emirates and Oman. In July 2007, the company announced it began production of gas from Qatar's North Field. The gas will be processed at Gas Processing Plant in Qatar's Ras Laffan Industrial City and then transported to the refined methane by sub-sea export pipeline from Qatar to Dolphin's Gas Receiving Facilities at Taweelah in Abu Dhabi.
Company Description
Dolphin Energy is a gas company of Abu Dhabi, United Arab Emirates. It was established in March 1999 by the Government of Abu Dhabi. As of today, Dolphin Energy is owned by Mubadala Development Company, on behalf of the Government of Abu Dhabi, (51% of shares), Total S.A. (24.5%) and Occidental Petroleum (24.5%).
Company website

Construction Electrical Supervisor

Saria Tech. - TECHNIP France
September 2005 to March 2006
Abu-Dhabi
United Arab Emirates
  • Organization and supervision of Construction works: 32 clusters with including, UPS 220Vac, UPS 48vdc, HVAC, MCC and transformer 33kV/400V and pumps
  • quality control with establishing of punch lists
  • daily reports, work schedules, daily organisation meetings
  • external sub-contactors works follow-up
Detailed Description
  • North East Bab (NEB) Project in a propriety of Abu Dhabi Company for Onshore Oil Operations (ADCO), which was a grass root development. New processing facilities were installed to handle oil, gas and water production from Rumaitha oil field. Water and gas injection facilities were also constructed to provide pressure support and enhanced oil recovery.

    Rumaitha field is located entirely onshore in a desert location, some 30 km south of Al-Dabbiya.
    The field is located in environmentally sensitive areas.
    The project facilities comprise of the following:
    Central processing plant (CPP)
    32 Clusters
    The key design parameters of the facilities are as follows:
    Rumaitha
    Sustainable oil production rate = 40,000 BPD
    Peak oil production rate=55,000 BPD
    GOR= 500 to 2000
    Wellhead closing pressure = 4000 to 1000 psia
    One processing train x 55,000 BOPD
Company Description
Technip is a provider of project management, engineering, and construction services for the oil and gas industry, headquartered in Paris, France. The company designs and builds high-technology industrial installations, such as subsea equipment and platforms, and onshore mega-complexes for the oil, gas and petrochemical sectors. It operates in three segments: Subsea, Offshore and Onshore.
Company website

Construction and Commissioning Supervisor

ITA - Centre Ingénierie Gaz de France
June 2005 to September 2005
La Neuvelotte
France
  • Organization and supervision of Construction works (Electricity, Instrumentation and PLC) for a gas compression station
  • External sub-contactors works follow-up
Detailed Description
  • Gas compression station La Neuvelotte is a property of GRT (subsidiary of GDF). This station is composed with 2 electric engine driven gas compressors TERMODYN with a capacity of gas transfer of 11 mmscfd fed from Russian gas and distributing 40% of French required gas.
Company Description
Gaz de France was created in 1946 along with its sister company Électricité de France (EDF) by the French Government. After the liberalisation of Europe’s energy markets, Gaz de France also entered into the electricity sector, having developed combined natural gas-electricity offerings.
Company website

Power Distribution Supervisor

CEGELEC - ENI IRAN BV
May 2004 to January 2005
Assaluyeh
Iran
  • Directing and co-ordinating activities and personnel during a shift duty period, with the responsibility to guarantee electric power distribution in accordance with distribution plan and schedules; ensuring the regular and correct recording of Power Plant Distribution
  • Monitoring Power Distribution control room and network; supervising the start-up and shutdown of the unit, in collaboration with Power Distribution Foreman and Control System Technician
  • Supervising the area work programs achievement; training and leading Power Distribution Foremen, operators and power distribution control system technicians
Detailed Description
  • The Development of the South Pars Gas Fields, Phases 4&5 was awarded in 2000 to a consortium formed by Agip 60% and Petropars 40% on a buy-back basis.
    Later, Petropars transferred 50% of its share to N.I.C.O.
    The present share breakdown is as follows :

    Eni (Agip) 60%
    Petropars 20%
    NICO 20%
    The Iranian construction share of this project was over 44% equivalent to 850 million USD.

    Project Objectives :

    Meeting domestic natural gas needs.
    Increasing export gas volume.
    Substituting natural gas instead of other oil products.
    Products of the Project :

    Product Name Daily Output Annual Output
    Lean Gas 50 MM SCM 18 MMM SCM
    Ethane 2.18 MM SCM 1 MM T
    Propane 1794 Tons 1/05 MMT
    Butane 1134 Tons
    Stabilized Condensate 80000 Brl 29 MM B
    Sulfur 400 Tons 146 M T
    Lean gas which shall be transported by a 75 km long 56" pipeline to IGAT-3 tie-in manifold in the vicinity of Kangan Gas Refinery.
    Ethane gas which shall be transported to NPC through a 16" pipeline.
    Treated LPG which shall be refrigerated and stored in double wall storage tanks to be pumped to LPG carriers for export.
    Condensate stored in special storage tanks which shall be exported through the existing Phase 1 SBM.
Company Description
Eni S.p.A. is an Italian multinational oil and gas company, present in 85 countries, and currently Italy's largest industrial company.
Company website

Supervisor

MONTALEV
March 2004 to April 2004
Part-time
Nouméa
New Caledonia
  • Revamping of the electrical network for supply of oven in the factory for nickel treatment.

Senior Commissioning Technician

CEGELEC - BHP BILLITON
December 2002 to November 2003
Ohanet
Algeria
  • Supervision of sub-contractors during a shift duty period, to ensure construction
  • Supervising the start-up team before hand-over
  • Quality control with establishing of punch lists
  • Training and preparing electrical technician on maintenance
Detailed Description
  • Ohanet Gas Processing facility treats around 710 million standard cubic feet per day (MMscf/d) of gas and produce a maximum of 30,000 barrels per day (bbl/d) of condensate and 26,000 bbl/d of Liquefied Petroleum Gas (LPG), together with a stream of dry pipeline sales quality gas for SONATRACH. A total of 28 new wells have been drilled and completed and 15 existing wells re-completed to develop the 4 reservoirs forming the development.
Company Description
BHP Billiton is an Anglo-Australian multinational mining, oil and gas company headquartered in Melbourne, Australia and with a major management office in London, United Kingdom. It is the world's largest mining company measured by 2011 revenues and as of February 2011 was the world's third-largest company measured by market capitalisation.
BHP Billiton was created in 2001 through the merger of the Australian Broken Hill Proprietary Company Limited (BHP) and the Anglo-Dutch Billiton plc.
Company website

Lead electrical Engineer

FORAID
September 2002 to October 2002
Port-Gentil
Gabon
  • Electrical and instrumentation department management for new small projects on onshore and offshore oilfields.
  • Establishment of technical files, quotation, purchasing of material, preparation on site,
  • Follow-up during construction and commissioning phases
  • Preparation of billing
Detailed Description
  • Several projects for oilfields:
    CAP LOPEZ Oil Terminal (TOTAL):
    • Installation of automatic barrier
    • Replacement of all valves
    • Revamping of Metering Station
    • Installation of oil Tanks level radars

    SOGARA:
    • Revamping of electrical sub-station
    • Installation of oil Tanks level Radars

    SHELL:
    • Revamping of cathodic protection on main oil pipeline

Maintenance Lead electrical Technician

IOTA - Dietsmann Technology
August 2001 to July 2002
Pointe-Noire
Congo - Brazzaville
  • Organization of preventive and curative works: establishment of work intervention procedures, creation of work permits
  • equipment supervision, adjustments, settings
  • daily reports, work schedules, specific action procedure drafts, CMMS reports, spare parts identification from warehouse for deliveries, extra purchase orders
  • external sub-contactors works follow-up, final acceptance, hand over
  • team management: 2 senior electrical team leaders and 6 junior electrical technicians, respect of security procedures (HSE), work quality follow-up
Detailed Description
  • The Tchibouela oil field, located offshore in the lower Congo basin has been discovered in 1984 and has been developed in 1987 by the French Major oil company ELF (TOTAL). It is presently the major producing field in Congo with an output of roughly 50,000 bbl/d and initial recoverable reserves exceeding 200 million barrels.This production unit is composed by 1 production platform and 6 satellites.
Company Description
Dietsmann is the Leading Independent Specialist of Operation and Maintenance for Oil, Gas, LNG and Power Plants leveraging 35 years of cumulated know-how of plant and equipment, the evidence of which is its long term partnerships with many IOC’s and NOC’s.
Company website

Maintenance technician

REGITRA - Bouygues TP
July 2001
Temporary Work
Gopenstein
Switzerland
  • Maintenance of vehicles and conveyors inside tunnel under construction

Senior Maintenance Technician

Bouygues Offshore
December 2000 to June 2001
WARI
Nigeria
  • Maintenance on all living barges – electrical and all civil works equipment
  • Applying multidiscipline skills (electricity, plumbing, painting, electronic and HVAC)
Detailed Description
  • This project is executed by the NNPC/Shell JV in the South Western part of Nigeria. The objective of the project is to gather gas and inject into the ELP (Escravos to Lagos Pipeline), which will eventually form part of the West African Gas Pipeline that will supply gas to some West African Countries. The Odidi field is located in a swamp in The Delta of Niger close to Wari . The swamp area consists of rivers, creeks, dry land as well as areas that alternate between wet and dry depending on the season and the tide.
Company Description
Bouygues Offshore is an oil and gas construction company located in Paris region. Specializes in laying of pipelines Onshore, the company expanded into the offshore and construction of oil terminals, petrochemical plants and refineries. Bouygues Offshore became SAIPEM in 2002.
Company website

Technician

Adecco - Clemessy
October 2000 to November 2000
Temporary Work
Champigny-sur-Marne
France
  • Revamping of electrical network and ventilation system in a printing press

Installation technician

Adecco - IVS
August 2000 to September 2000
Temporary Work
Caen
France
  • Installation of video and audio system in a sports bar under construction

Construction Supervisor

REGITRA - Bouygues Offshore
December 1999 to July 2000
Novorossiysk
Russia
  • Supervising call for tender for all works in tank Farms buildings (electricity, plumbing, metal works, external woodworks, covering, painting) according client specification
  • Follow-up on site of the works in order to respect planning; organizing and plan of maintenance works
  • Choicing of sub-contractors
  • Supervising the area work programs achievement
Detailed Description
  • The Caspian Pipeline Consortium is a consortium and a pipeline to transport Caspian oil from Tengiz field to the Novorossiysk Marine Terminal on Russia's Black Sea coast. It is also a major export route for oil from the Kashagan and Karachaganak fields.
    The diameter of the 1,510 kilometers long oil pipeline varies between 1,016 millimetres (40.0 in) and 1,067 millimetres (42.0 in). There are five pumping stations. The marine terminal includes two single point moorings and the tank farm consists of four steel storage tanks of 100,000 cubic meters each. Pipeline throughflow started at 350,000 barrels per day (56,000 m3/d) and supposed to be increased up to 700,000 barrels per day (110,000 m3/d)..
Company website

Technician

AEMI
April 1998 to August 1999
Boulogne-sur-Mer
France
  • Maintenance and installation of marine electronic and electrical equipments (GPS, radars, VHF…)
  • Consultant for FURUNO and MLR equipment
Company Description
AEMI supplies, installs and maintains electronic equipment owners to its customers.

The activity is focused on three areas:

  • Navigation equipment and communication (FURUNO, B & G. ...)
  • Productivity of fisheries (SCANMAR, SCANTROL, MAREL .....)
  • The provision of services in electronics and electricity.

The company is positioned on four main markets:
Shipyards, the Armaments fishing support vessels, trade and Administrations.

Technician

Adecco - Renault Vehicule Industriel
January 1998
Caen
France
  • Installation of electronic cards and test for temperature control designed for trucks planned for expedition to Russia

Quality control technician

Adecco - Philips Composent
July 1997 to December 1997
Temporary Work
Caen
France
  • Quality control of Electronic Integrated circuit

Installation technician

Adecco - LOCATEL
May 1997 to July 1997
Temporary Work
Caen
France
  • Installation of television in hospitals, hotels, prisons or audio and video material for seminars.

Technician

Adecco - Renault Vehicule Industriel
April 1997 to May 1997
Temporary Work
Caen
France
  • Installation of overhead crane controlled by wireless controller.

Electrical designer CAD

Adecco - Clemessy
March 1997
Temporary Work
Caen
France
  • Design on computer with software Autocad Electrical of project of water treatment station.

Technician

Adecco - ROC
February 1997 to March 1997
Temporary Work
Caen
France
  • Dynamic mechanic tests for street lighting poles all over city.

Construction Lead Electrical Technician

REGITRA - ETPM Mc DERMOTT
December 1996 to February 1997
Rotterdam
Netherlands
  • Revamping of Barge DLB1601 Fire detection system

Installation Technician

Adecco - Clemessy
September 1996 to November 1996
Temporary Work
Caen
France
  • Installation of Telecom dishes around France on "Carrefour" hypermarkets.
    Installation and connection of optic fibres with servers.

Technician

GTMH
May 1996 to August 1996
Pointe-Noire
Congo - Brazzaville
  • Start-up of the Nkossa offshore project
Detailed Description
  • The barge N'Kossa, located 60 km off Pointe-Noire - Congo's economic capital, is the largest offshore floating production of hydrocarbons in the world. In high performance concrete prestressed 70 MPa, it is anchored by over 170 m deep. Total is the Main operator and produces 60,000 barrels per day.

Commissioning Technician

SDEL - GTMH
September 1995 to April 1996
Fos-sur-Mer
France
  • Pre-commissioning / commissioning of the Nkossa project

Electrical technician

VediorBis - Clemessy
July 1995 to August 1995
Temporary Work
Lisieux
France
  • Construction of cold stores building with installation, termination and test of all electrical equipment.