Your browser is outdated!

To ensure you have the best experience and security possible, update your browser. Update now

×

Antoine CRENN

Antoine CRENN

QA/QC or Inspector in pressure equipment’s and construction

39 years old
Driving License
TOURS (37000) France
Available
> Français (lien) : https://www.doyoubuzz.com/antoine-crenn
Contact : antoine.crenn.job@gmail.com


Dear Madam, Sir,

After working for more than 10 years as QA/QC or inspector for various clients as ITER Organization, ELECTRABEL ENGIE, SAUDI ELECTRICITY, LAFARGE HOLCIM, TOTAL, EDF, AREVA or VINCI ; having explored the sectors of, thermal solar, Nuclear, petrochemical, coal, gas, aeronautic, pharmaceutic, transport, national defence, offshore construction ; I’m willing to find new opportunities.

I currently have the skills for the following activities:

  • QA/QC management: Project activities, rules of construction, action plan, coordination
  • Audit / Procedures follow-up: Internal, sub-contractor, client, system
  • Inspection: steel, pressure equipment’s, civil engineering, controls, test, protection
  • Final construction files: Client, contractor, supplier. Structure of records EOMR
  • Welding assistance: 15 years of practice. Qualified as International Welding Specialist
  • NDT: VT, PT2 COFREND, UT thickness, Floormap. Inspection methods VT, PT, MT, UT, RT
    Thank you very much for considering this application.

.
Resume created on DoYouBuzz
  • Equipment’s assembly: VV, VVTS, TFC, before transfer to Tokamak (B13/B17). DYNAMIC Consortium
    • Radio coordination: RT program, visits, scaffolding, bio-protections, films reading
    • ITP-NCR / activities: Documents / site follow up, from PIM to closure
    • Controls / tests: visual on materials / assembly / welding / silver coating, endoscope, penetrant testing, cryogenic / pressure / helium FOSSELEV, torquing, cleaning / flushing – Sagittaire software
  • Inspection PMII (French regulation) after environmental hazard study. Scope PED / PMII / Maintenance.
  • Zero point (document / site): Visual control, ultrasonic thickness, control program, documentary historic research, marking identification update, regulatory dossier.
  • Quote and invoice: drawings isometrics / P&ID + Ultrasonic thickness gauge
  • Extension of composite materials production unit:
    • Interfaces with customer / Notified Body / companies (mechanic, welding, NDT, coating)
    • NCR monitoring, action plan, audit + documentary update
    • Preparation of final files, ITP quality plans, records (piping equipment, structure)
    • PERF2: Bar code tracking software for quick incrementation. Welds / controls / test pack
  • Nuclear ELECTRABEL, AREVA-TN, WESTINGHOUSE (6 months – Doel / Tihange & Europe) ASME
    • Equipment and pipe Inspections, prefabrication, installation & repair on projects CFVS, SWOL, LTO, BUR, CEU, SUR-E, B5-22, combustible containers TN24SH/DH/XLH; in Belgium, France, Spain, Italy, Finland, Germany
  • Solar, coal and gas plan SAUDI Electricity, LAFARGE South Africa, LICIASTAR Kathu, MOEP Myanmar (6 months international) ASME, AWS/ANSI, EU norms
    • Various prefabrication & site: Pipes, pumps, valves, filters, skids, turbine, tanks, crusher, boiler, heater, coolers, water treatment, chimney; in Belgium, France, Spain, Italy, Germany, China, Myanmar, USA, Canada
  • LNG Harbour EMCC-GEKA group VINCI (16 months – Dunkirk France – English contract) EEMUA158
    • Quality management: AQ/QC system establishment, inspection plan, audit, coordination of QC operations
    • Welding: check of procedures and qualification (metal, piping-structural steel)
    • Quality coating / concrete / assembly, planning / weekly schedule, sub-contractor audits, preparation of final construction files, basic knowledge of civil work
  • Nuclear EDF CEIDRE, AREVA TA/NP, DCNS (3 years – 4 sites) RCCM,
    • Supervision: audit, welding, repairs, NDT, pickling & passivation, pressure tests, final construction files
    • Inspection quality plan preparation / follow up: exchangers, air-coolers, pipes, valves, nuclear powered submarine SSN, nuclear central EPR
  • Petrochemical industry TOTAL, POLIMERI (3 years, 5 sites) PED 97/23/CE, EEMUA159, PMII
    • Pipe Inspector on site: Ultrasonic measures, corrosion research, recommendations, work follow-up, preparation and acceptance of hydraulic pressure test, decennial inspection on various tanks
    • Factory audits: Qualifications, application of procedures, welding operations, files records management

Industrial coating (Bournemouth England)

AMENCO
2007 to 2008
United Kingdom
  • Preparation of metal steel pieces for coating operations
  • Certification and development ISO 9001: Audits, Non-Conformity system, meetings managing, action plan
  • Work shop: production plan, control reports, calibration instruments, welder performance’s qualifications
  • Steel work and machining preparation: Diesel engines in QS 9000, project for Dresser Waukesha (USA)
  • Activities, rules of construction, action plan, coordination
  • Project preparation, organisation, prefabricated and site works
  • Piping, pressure equipment, civil engineering, controls NDE
  • Client, contractor, supplier. Structure of records
  • 15 years of experience. Qualified “International Welding Specialist”
  • Concrete tests, qualifications products & suppliers, work follow up
  • Nexess, Credo, RBI, A+ Metrologie, Sam, Lotus, AFNOR, BSI, SagaWeb, Gipsy, Chorus, Gedeon, Senet, Codem, Sharepoint, Opms/Aims, Quest, Adobe Pro, Yammer
  • French: Mother tong
  • English: Fluent (reading, writing, speaking)
  • Spanish: basics
  • “Brevet d’Aptitudes aux Fonctions d’Animateur” – French degree for child holiday camp animation
  • Salsa, traveling, permaculture, guitar, computing, snowboard, ping-pong, amateur video editing