  • PROJECTS

    • Multidisciplinary engineering services for FEED Phase-Algeria BRN ZOI2- OZOI 1 project- ENI
      In the frame of Berkine North Basin Development Program which includes the development of both ZOI and OZOI areas EPPM got an ‘on call’ contract which consists on the elaboration of engineering documents for FEED activities required for the area of BRN NEW FACILITIES.
      The Scope of Work (SOW) is provision of engineering services for multi-discipline (Instrumentation, Electrical, Piping, Pipeline and Materials selection)

    • Expansion of A'Seeb STP (Phase II) and Associated Facilities- HAYA Water
      The construction of A‘Seeb STP Phase-II is to expand A‘Seeb STP Phase-I with additional capacity of 20,000m3/day to augment the plant capacity to 80,000 m3/day.
      The construction of A‘Seeb STP Phase-II shall include Design, Procurement, Installation, Testing and Commissioning of Electro-mechanical, ICA works and all other associated works that required to expand the STP capacity to 80,000 m3/day. The water treated using the SBR technology is further processed by an ultra-filtration membrane system. The UF membrane will make the water reusable for irrigation of sports fields and parks.

    • Water Dilution Skid Provision - GBRS Groupement SONATRACH, PVEP et PTTEP
      Development of the necessary documentation for the purchase, installation and start-up of a pumping skid for water injection in gas producing wells.

    • North Berkine Gas Gathering - GSA Groupement SONATRACH AGIP & ENI Progetti
      Engineering services for development of engineering documents. With my team we gave to GSE the required support
  • Technical responsibilities:
    • Coordinate with the technical managers to ensure the development of the project technical documentation
    • Track and evaluate customer feedback and comments implementation on documents
    • Verification of documents technical content: scope, interfaces between disciplines
    • Ensure information workflow
  • • Management responsibilities
    • Approval of the initial schedule and follow-up of the updates
    • Verification of monitoring reports,
    • Monitor and manage project costs and create remedial plans in the event of a derogation.
    • Manage all customer communications and facilitate follow-up meetings
    • Budget monitoring and development of required action plans to prevent overruns
  • • Pre-project phase
    Participate in the preparation of technical and commercial offers
    Project costing & Budget estimating
    Development of project PEP (Project Execution Plan)
  • Create and update projects' schedules
  • Cost estimation
  • Weekly and monthly reporting
  • Coordinate with different project stakeholders (administration, Quality department, technical team..)
  • Projects Risk assassement
  • Change management
  • PROJECTS
    -Anaguid & Durra Wells Upgrade – OMV
    -TEG Unit design – Alpha Technology
    -Gas Lift Compressors Upgrade – OMV
    -AGP chemical storage shelter – OMV
  • RESPONSIBILITIES
    -Project Cost Control
    -Project Planification
    -Scope Clarification
    -Interface between technical departments
  • PROJECTS
    -Anaguid & Durra Wells Upgrade – OMV
    -Gas Valorization Recycle Line Upgrade Project – OMV
    -Update of As-Built drawings & Equipment Tagging – TPS
    -Commissioning of the Catalytic reforming Unit – STIR
    -Construction of new pipeline from Guebiba, Tank Battery to CFTP – TPS
    -Cherouq facilities hazards and operability and SIL studies – OMV
    -Hazardous waste area upgrade – OMV
    -Anaguid To Waha CPF Pipeline project – ECM+ / OMV
  • DUTIES
    • Power system design:
      - Lighting system design
      - Earthing system design
      - Power cables sizing & specification
      - Electrical material selection

    • Safety system Design
      - Hazardous area identification
      - Safety chart Elaboration
      - HAZID & HAZOP sessions assistance and preparation
      - Fire & Gas sytem design
      - SIL sessions preparation & reporting

    • Process Control System design

    • Telecommunication system design

    • Instrumentation System design
      - Instruments specification
      - Elaboration of instruments technical datasheets
      - Instruments sizing

    • Layouts and diagrams elabration

    • Commissionning check sheets elaboration
  • FIELD ACTIVITIES
    - Pre-commisionning field activities(Electrical and
    Instrumentation check)
    - Punch list elaboration
    - Commissionning field activities ( Instrumentation loop test)
Learn more
  • Project
    Automated control system design
Learn more
  • July 2017 - HSE training : AEI Offices
  • Mars 2016- Process Control Training: APC
    • Process control terminology&symbols
    • Control strategy documentation, Plot plan, Flow sheet, P&IDs, Loop sheet
    • Review measurement principles: pressure, temperature, level and flow
    • Control valves type, accessories and application
  • March 2016: Commissionning training: AEI Offices
    • Check-sheets preparation
    • Field activities Planification
    • Punch list elaboration
  • Hazardous area classification: IEC 60079-20/ API RP505
  • Instrumention system design: ISA 20 / ISA 20.4/ ISA 5.1
  • Process Control Systems: API RP 554
  • MsOffice
    Advanced
  • Ecodial Advanced Schneider Electric
    Good
  • Autocad
    Good
  • Caneco BT
    Advanced
  • Dialux
    Advanced
  • Instrucalc
    Good
  • Enardo
    Good
  • STEP 7 / TIA Portal SIEMENS
    Intermediate
  • Primavera
    Good
  • English
    Advanced
  • Frensh
    Expert
  • Arabic
    Expert

Electrical and automation Engineer

National Engineering School of Gabes