EPPM- Engineering Procurement and Project Management
Since September 2018
PROJECTS
Multidisciplinary engineering services for FEED Phase-Algeria BRN ZOI2- OZOI 1 project- ENI In the frame of Berkine North Basin Development Program which includes the development of both ZOI and OZOI areas EPPM got an ‘on call’ contract which consists on the elaboration of engineering documents for FEED activities required for the area of BRN NEW FACILITIES. The Scope of Work (SOW) is provision of engineering services for multi-discipline (Instrumentation, Electrical, Piping, Pipeline and Materials selection)
Expansion of A'Seeb STP (Phase II) and Associated Facilities- HAYA Water The construction of A‘Seeb STP Phase-II is to expand A‘Seeb STP Phase-I with additional capacity of 20,000m3/day to augment the plant capacity to 80,000 m3/day. The construction of A‘Seeb STP Phase-II shall include Design, Procurement, Installation, Testing and Commissioning of Electro-mechanical, ICA works and all other associated works that required to expand the STP capacity to 80,000 m3/day. The water treated using the SBR technology is further processed by an ultra-filtration membrane system. The UF membrane will make the water reusable for irrigation of sports fields and parks.
Water Dilution Skid Provision - GBRS Groupement SONATRACH, PVEP et PTTEP Development of the necessary documentation for the purchase, installation and start-up of a pumping skid for water injection in gas producing wells.
North Berkine Gas Gathering - GSA Groupement SONATRACH AGIP & ENI Progetti Engineering services for development of engineering documents. With my team we gave to GSE the required support
Technical responsibilities:
Coordinate with the technical managers to ensure the development of the project technical documentation
Track and evaluate customer feedback and comments implementation on documents
Verification of documents technical content: scope, interfaces between disciplines
Ensure information workflow
• Management responsibilities
Approval of the initial schedule and follow-up of the updates
Verification of monitoring reports,
Monitor and manage project costs and create remedial plans in the event of a derogation.
Manage all customer communications and facilitate follow-up meetings
Budget monitoring and development of required action plans to prevent overruns
• Pre-project phase Participate in the preparation of technical and commercial offers Project costing & Budget estimating Development of project PEP (Project Execution Plan)
PROJECTS -Anaguid & Durra Wells Upgrade – OMV -Gas Valorization Recycle Line Upgrade Project – OMV -Update of As-Built drawings & Equipment Tagging – TPS -Commissioning of the Catalytic reforming Unit – STIR -Construction of new pipeline from Guebiba, Tank Battery to CFTP – TPS -Cherouq facilities hazards and operability and SIL studies – OMV -Hazardous waste area upgrade – OMV -Anaguid To Waha CPF Pipeline project – ECM+ / OMV
DUTIES
Power system design: - Lighting system design - Earthing system design - Power cables sizing & specification - Electrical material selection
Safety system Design - Hazardous area identification - Safety chart Elaboration - HAZID & HAZOP sessions assistance and preparation - Fire & Gas sytem design - SIL sessions preparation & reporting
Process Control System design
Telecommunication system design
Instrumentation System design
- Instruments specification - Elaboration of instruments technical datasheets - Instruments sizing
Layouts and diagrams elabration
Commissionning check sheets elaboration
FIELD ACTIVITIES - Pre-commisionning field activities(Electrical and Instrumentation check) - Punch list elaboration - Commissionning field activities ( Instrumentation loop test)