Your browser is outdated!

To ensure you have the best experience and security possible, update your browser. Update now

×

Assifa Fahrunnisa

My Resume

Professional Status
Employed
Unavailable
About Me
I am dedicated, outgoing, and a team player. I have been on different projects with different rhythms and I attribute it to my ability to plan, schedule, and handle many different tasks at once.
Resume created on DoYouBuzz

SE Project

PT. Elabram Systems
Since July 2022
  • Verify photo Site Owner Verification and document simulation of External Alarms from Subcontractor
  • Submit all SOV documents and get full approval from the Customer
  • Verify site configuration between NDB Online, actual OSS , and Antenna System Monitoring Function

TX Capacity [RAN] - XL NPM JABO 2021

PT. Nexwave
December 2021 to May 2022
  • Check ethport setting as requested by PDT Lan Congest team
  • Migrasi M2G as requested by PDT Lan Congest team
  • Reroute site Huawei [2G,3G,4G, & OAM] based on MOP as requested by PDT Lan Congest team
  • Update Progress LAN IDU to IDU/IDU to Router weekly

SE Project

PT. Sinergi Aitikom
November 2019 to November 2021
  • Verify site information between NDB online and actual OSS
  • Implementation of parameter change request to support RNO team
  • Monitoring simulation of external alarm by OSS
  • Check and Verify the EAC Document from the Subcontractor. Submit and get full approval from the customer
  • Provide KPI Daily Report Nokia
  • Monitoring Performance before and after GFR
  • Collect log before and after GFR

OSS Engineer - Telkominfra South Sumatera

PT. GMI Network
January 2016 to November 2018
South Jakarta
Indonesia
  • Provide KPI Daily Report 4G Huawei and 2G Huawei
  • Provide report 4G performance weekly region level
  • Running script as requested by optim team
  • Provide Weekly Max Utilization
  • Provide weekly counter S1 and X2
  • collect eNodeB Configuration
  • collect CFGMML
  • provide daily KPI report and check alarm then escalate to BSS team
  • provide report performance weekly cluster and cell level
  • collection data of 4G Network Audit from NIC
  • Running script as requested by optim team
  • do lock/unlock site or cluster for SSV activity on LMT
  • UDP Test and Tracing (S1, X2, Uu, FFT test, and user online ) on LMT
  • collect one key board log on LMT or U2000
  • • Provide ND Report as needed by optim team
    • Collect history & active alarm (ZEOH, ZEOL)
    • Provide dump parameter as needed by optim team
    • Preparing scripts needed to run reports for KPI purpose
    • Implementation of parameter change request to support optim team
    • Provide daily reporting 2G & 3G
  • Monitoring KPI performance
    • Providing daily & weekly statistic data to PLO
    • Providing site achievement daily report
    • Providing daily & weekly performance report after SWAP & Rehoming Cabis
    • Analyzing degraded KPI by knowing the causes
    • Providing performance KPI progress report, KPI OSS Certificate, Quality Statement Report and Justification Report
    • Updating project progress report

assistant Laboratorium QA CPE & Support

PT. Telkom R&D Center
July 2010 to August 2010
Internship
Bandung
Indonesia
  • • Measuring diameter of core and cladding optical fiber
    • Measuring Insertion Loss in optical fiber using OTDR
    • Measuring Chromatic Dispersion using Nexus PMD
    • Optical Fiber Splicing with Fusion Splicer

    Internship Report : Polarization Mode Dispersion Measurement of OPTICAL FIBER G.655 C