Your browser is outdated!

To ensure you have the best experience and security possible, update your browser. Update now

×

Assifa Fahrunnisa

My Resume

Professional Status
Employed
Open to opportunities
About Me
I am a dedicated and results-driven professional with a strong ability to adapt to diverse project environments. My experience working across various projects with differing timelines has honed my skills in strategic planning, task prioritization, and efficient scheduling. I thrive in collaborative settings, where my proactive approach and attention to detail enable me to successfully manage multiple responsibilities while ensuring project goals are met on time.
Resume created on DoYouBuzz
  • Coordinated and submitted permit requests to tower providers, ensuring all necessary documentation and requirements were met. Successfully followed up and secured full approval from tower providers for permit issuance, maintaining effective communication throughout the process
  • Verified site configuration on the OSS (Operations Support System) to ensure accuracy and compliance with project specifications. Submitted the configuration for customer review and successfully obtained full approval.
  • Verified photo Site Owner Information and ensured the accuracy of external alarm simulations provided by subcontractors. Documented and reviewed simulation results to confirm compliance with project requirements and specifications.
  • Checked ethport settings as requested by the PDT Lan Congest team to ensure proper configuration.
  • Migrated M2G systems as per the PDT Lan Congest team's instructions, ensuring smooth transition and minimal disruption.
  • Rerouted Huawei site connections (2G, 3G, 4G, & OAM) in accordance with the MOP (Method of Procedure) provided by the PDT Lan Congest team to optimize network performance.
  • Verify site information between NDB online and actual OSS
  • Check and Verify the EAC Document from the Subcontractor. Submit and get full approval from the customer
  • Generated and provided daily KPI reports for Nokia, ensuring timely and accurate data for performance analysis.
  • Monitored network performance before and after GFR to assess impact and ensure system stability.
  • Collected and analyzed system logs before and after GFR to identify any issues or improvements in performance.
  • Provide KPI Daily Report 4G Huawei and 2G Huawei
  • Provide report 4G performance weekly region level
  • Running script as requested by optim team
  • Provide Weekly Max Utilization
  • Provide weekly counter S1 and X2
  • collect eNodeB Configuration
  • collect CFGMML
  • provide daily KPI report and check alarm then escalate to BSS team
  • provide report performance weekly cluster and cell level
  • collection data of 4G Network Audit from NIC
  • Running script as requested by optim team
  • do lock/unlock site or cluster for SSV activity on LMT
  • UDP Test and Tracing (S1, X2, Uu, FFT test, and user online ) on LMT
  • collect one key board log on LMT or U2000
  • • Provide ND Report as needed by optim team
    • Collect history & active alarm (ZEOH, ZEOL)
    • Provide dump parameter as needed by optim team
    • Preparing scripts needed to run reports for KPI purpose
    • Implementation of parameter change request to support optim team
    • Provide daily reporting 2G & 3G
  • Monitoring KPI performance
    • Providing daily & weekly statistic data to PLO
    • Providing site achievement daily report
    • Providing daily & weekly performance report after SWAP & Rehoming Cabis
    • Analyzing degraded KPI by knowing the causes
    • Providing performance KPI progress report, KPI OSS Certificate, Quality Statement Report and Justification Report
    • Updating project progress report

assistant Laboratorium QA CPE & Support

PT. Telkom R&D Center
July 2010 to August 2010
Internship
Bandung
Indonesia
  • • Measuring diameter of core and cladding optical fiber
    • Measuring Insertion Loss in optical fiber using OTDR
    • Measuring Chromatic Dispersion using Nexus PMD
    • Optical Fiber Splicing with Fusion Splicer

    Internship Report : Polarization Mode Dispersion Measurement of OPTICAL FIBER G.655 C

Telecommunication (Diploma Degree)

Politeknik Negeri Bandung

August 2008 to October 2011

Telecommunication (Bachelor)

Institut Sains dan Teknologi Nasional Jakarta

March 2012 to October 2013