NR PCI & PRACH Planning and co-existence strategy recommendation
Well Market Analytic capabilities including solutions for operator challenge survival
Home Repeater PM Including technical negotiation , PO arrangement ,end customer satisfaction and certifications
Optimization Team TD
LTE/VoLTE RAN Optimization Expert/TeamLeader
FWUTECH
May 2020
to December 2021
KPI (SLA) Ownership of Optimization on MTN-Irancell Network for Region 1/3 (largest MTN Region equipped with Huawei) including more than 3000 eNBs
MTN CTO Meeting ownership for FWUTECH LTE to present and Manage LTE Optimization Activities including improvement and network insight (Acting RM)
Conducting Feature tuning over the Live LTE network including Trial/Roll-out and parameter retuning of Main feature such as: -MLB -MBOCS -Intera/Inter Freq/RAT parameter tuning for Idle and dedicated mode -Adoptive CSFB -Flash CSFB (RIM) -MIMO -RACH, PUCCH and PUSCH power control -Load Balancing (Intra RAT) -CA strategy tuning
Network Level KPI achievement and strategy changes for Band efficient Utilization
Design and develop Contribution performance trend to highlit the sector level priotrization and Target Identification to the Team
Leading the team including 15 guys on 6 Province and 15 LTE Zone (RNC)
Proactively develop and implement measures to improve operations while Network bottle-neck detection and compensation to Ensure customer satisfaction
Serve as TL to MTN senior management and major customers regarding advanced technical challenges and potential Solutions and final resolution of complex problems
Manage Engineers on DTQI (Drive Test on Quality Indicators) andcarry on the meetings with Customer Team
SmartCare CEM SA Engineer
Huawei Cooperation Tehran -Iran
February 2020
to May 2020
3rd party Probe Adaptation (Astellia/SGI) KQI/KPI validation on CSE & SQM parts
Responsible for Project Roll-out and technical meeting to inquiry Customer Requirements and Huawei Available Solutions (OTT User Behavior - Churn Prediction - VVIP Care - MBB Traffic Analyze -Device Analyze)
Dashboard customization Based on MTN-Irancell Strategies and different Team Requirements
Huawei SEQ Analyze on CS/PS/IMS xDR Base on available Dictionary
LTE RF Optimization Team Leader
Huawei Cooperation
May 2015
to February 2020
Full-time
Tehran
Iran
RF PM for MTN-Huawei Modernization Project including 2G/3G/LTE team arrangement for 2018/17 Acceptance
LTE RF Team Lead for Huawei-MTN rollout project: 2016-2018 LTE modernization project
Network initial tuning/optimization and KPI achievement for new on-aired sites -unblock/troubleshooting new LTE feature for the first time in the network and Handing over to MS/MVO team
Multi Layer network strategy implementation for LTE1800/LTE2600/U900/U2100/G900/G1800/L3500
Preparing Network Level LTE quarterly reporting for customer
Managing Huawei LTE team including expat and local engineers to achieve Huawei annual targets -Network Level cell planning including PCI/PRACH planning and cell naming standard suggestion -TT and customer complain Resolution for non-PACed sites with ranking first -RND acceptance owner of RF LTE part
LTE Team leader for MTN 1300 site PAT & FAT project -including RF optimization and target achivement of LTE to get Perlimanary and Final acceptance of MTN-Irancell
parameter optimization and initial tuning of the RF based on 3G/2G optmization and changes in network -Working on dual layer LTE network (FDD 1800/2600) -TAC/PCI/PRACH planning of the site including lateral additional sites during project
Coverage and power usage optimization of the LTE netwrok base on RRU capability and 2G/3G power requirements
customer interface to get all kind of special requirements and escation to HQ for new solution
RF Team Leader for MTN LTE-TDD & Wimax Project including
Feature tests of LTE Pilot site on MTN office and solving co-existence problems with Wimax network.
Planning of 40 LTE-TDD sites in Karaj as Pilot project of MTN 3.5 LTE
Optimizing Wimax network to achieve target Baseline from 51.2 to 64.1 (MTN target was 53.8) the over-target bonus assigned to the whole team.
Parameter audit and modification to optimum value of 850 Huawei sites in MTN network
cluster optimization on over 100 clusters with achieving more than 85% of the targets
2G/3G RF Optimization Engineer
ZTE Coopration
July 2014
to January 2015
Full-time
Tehran
Iran
Responsible for RF Optimization and ZTE contact point with MTN-Irancell Network Team,for Yazd Province's Ericsson to ZTE swap project
Finalizing the EP Parameter of 2G/3G network with MTN
Training subcontractors to work with ZTE OSS Tools and performing the KPI reports of each new site in the network.
Finalizing report template and swap criteria with MTN
Negotiation of Network KPI's definition and KPI/parameter mapping between Ericcson and ZTE
RF Optimization Manager
Mobinnet Telecom
August 2011
to July 2014
Full-time
Tehran
Iran
Managing RF Optimization Department
-Optimization and achieving Coverage KPI target of Mobinnet Netwrok for: o 500 Huawei BS o 250 Samsung BS o And 300 ZTE BS
-Initial tuning and planning of first LTE-TDD network of Iran on 2.6 band for hotspot target cities to offload VIP wimax users -Pre-optimization of LTE sites to achieve the PAC KPIs including availability, retainability , mobility and capacity for Huawei and ZTE LTE equipment. -Capacity Optimization for Huawei and Samsung Network to the Maximum Network Utilization of Samsung and Huawei Network specially in Tehran Hotspot Zones -Successfully Completing More than 8 successful Optimization project within 1 years -Negotiation on LTE Planning and optimization with Huawei/ZTE/Datang for Pilot TDD-LTE network of MTC. -Leading Optimization part of Swap project in RF part from Huawei to Samsung/ ZTE for more than 20 province and 50 cities of Iran not to face network quality decrement after swap -Defining KPIs includes E2E connectivity/accessibility, connection sustainability, coverage and capacity of the -Train and guide Junior team-members for Drive Test analysis & parameter optimization of 802.16e network -Huawei and Samsung co-existence parameter tuning and define border interference strategies -Wimax R1 future & functional tests with vendors and troubleshooting futures -Managing and preparing contracts for RF subcontractors of the project such as DT and adjustment **Out of work for (Feb 2013-April 2013)
WiMAX RF Planning & Optimization Consultant
Huawei
February 2011
to August 2011
Full-time
Ankara
Turkey
Nominal Coverage and Traffic Planning for Dyarbakir, Urfa, Bengul and Turkey Eastern regions for Turk Telecom WiMAX Project -Define Model tuning scenario for Huawei WiMAX 3.5GHz -Setting up Atoll (U-Net) with database for Huawei WiMAX project , including parameter and model tunning -Preventive and corrective optimization actions including frequencies and parameters in order to optimize the coverage, traffic, in Adana & Diyarbakir Region.. -PUSC and FUSC parameter tuning and strategy settings Coverage recheck and target village insurance for final implementation
Head of Radio Access Network Planning
Mobinnet
March 2009
to February 2011
Full-time
Tehran
Iran
Planning and supervising vendors for Mobinnet Phase1 sites. • Drive test analyses for initial tuning. • Finding solutions for upcoming network’s end-to-end problems in associate with other relevant departments, • Testing CPEs and troubleshooting for vendor’s mobinnet customized customer interface softwares and any hardware related miseries. • Dimensioning calculations based on link budget and Traffic analysis to come up with estimated sites numbers • RVT test procedure definition for MTC sites and TSSR/RVT approval for Huawei sites • Create NCP and prediction map using Forsk Atoll software, Asset Enterprise and NetAct. • CW measurement and model tuning of WiMAX 3.5GHz of different type cities • Prepare Frequency spectrum survey scenario to find inter-tech interference. • Detailed RF Planning to provide optimal site selection based on coverage, interference & capacity studies using Atoll & ATDI • Managing Tasks and resources for MobinNet RF team including 6 RNP Engineers to supervise vendors. • Supervising Planning and initial tuning for MobinNet Phase1 for more than 500 Huawei BS whole over Iran. • Model tuning for 3.5 Tehran and Iran major cities in cooperation with vendors teams • TSSR , SARF and SAR evaluation and template preparation for vendors teams
2G RF Planning and optimization Engineer
Taliya
April 2006
to March 2009
Full-time
Tabriz
Iran
Quarterly optimization of Taliya network for region 2
network performance monitoring and Worst Cell KPI Observation for 600 Siemens and 300 Alcatel sites in the network
Drive test analysis, post-process analyse, using TEMS/ACTIX and BSS parameter adjustment accordingly to achieve the targets.
Technical Site surveys and TSSR evaluation
New Site Planning for marketing requested coverage area including Frequency planning, neighbour planning and coverage KPIs.
Maintain and reach Radio network performance targets, such as: (CSSR,HOSR,CDR,HODR,SDCCH DR,…)