Mechanical Construction & Commissioning (Static & Rotating Equipments)
Worked as Mechanical Installation Supervisor with GE power and water with experience for more than 11 years of experience working in oil and gas, power generation (GE Frame 9E), Turbo-compressor (GE PGT 25) and chemical process facilities.
Worked in multinational environment with different nationalities at different locations.
Acquired a high knowledge of mechanical engineering principals mixed with hands on practical experience.
High awareness of GE standards of Safety & Health
Worked on my own & as part of a team
Developed High skills of management, motivations & work administration to achieve their objectives.
Worked according to GE quality standards.
Speak and write 3 languages: Arabic, English & French
Project: Construction and Erection of 2 GE frame 9E Gas Turbines, Generators and auxiliaries in Bouchema Tunisia Fast Track Power Project (3 Months)
Realizations:
Mechanical Construction & Commissioning in Bouchema Power Plant –250 MW which consists of Two GE 9E
To ensure efficient inter-discipline release: foundations to Equipment, then Equipment release to Piping / Hydro; coordination with Electrical and Instrumentation
To supervise the work performed by the contractor; to check its progress as per schedule and budget; and to achieve completion dates as per contract.
Check the preparation, issue and implementation by contractor of construction means, including documents, detailed procedures, method statements, drawings, calculation notes, construction equipment, personnel, planning, as-built documentation, operation and maintenance manuals, and back-up procedures if necessary.