Mechanical Construction & Commissioning (Static & Rotating Equipments)
Worked as Mechanical Installation Supervisor with GE power and water with experience for more than 11 years of experience working in oil and gas, power generation (GE Frame 9E), Turbo-compressor (GE PGT 25) and chemical process facilities.
Worked in multinational environment with different nationalities at different locations.
Acquired a high knowledge of mechanical engineering principals mixed with hands on practical experience.
High awareness of GE standards of Safety & Health
Worked on my own & as part of a team
Developed High skills of management, motivations & work administration to achieve their objectives.
Worked according to GE quality standards.
Speak and write 3 languages: Arabic, English & French
Project: Construction and Erection of 8 GE frame 9E Gas Turbines, Generators and auxiliaries in New Assiut Fast Track Power Project, Was part of a team to deliver 8x9E turbines installed & operated on time achieving a world record in installation & deliverance.
Realizations:
Mechanical Construction & Commissioning in New Assiut Simple Cycle Power Plant –1000 MW which consists of Eight GE 9E
Helped in delivering a turbine, that was flipped during transportation, on time
Technically advised on Equipment Package With all required Balance of plant systems - On-base piping and equipment according to GE Standards of quality & safety.