Your browser is outdated!

To ensure you have the best experience and security possible, update your browser. Update now

×

Anis GHNIMI

Mechanical Construction & commissioning (Static and Rotating Equipments)

Anis GHNIMI
46 years old
Adress: Village Hammem Bourguiba (Ain Drahem - 8136) Tunisia
Professional Status
Unemployed
Available
About Me
Mechanical Construction & Commissioning (Static & Rotating Equipments)

  • Worked as Mechanical Installation Supervisor with GE power and water with experience for more than 11 years of experience working in oil and gas, power generation (GE Frame 9E), Turbo-compressor (GE PGT 25) and chemical process facilities.

  • Worked in multinational environment with different nationalities at different locations.

  • Acquired a high knowledge of mechanical engineering principals mixed with hands on practical experience.

  • High awareness of GE standards of Safety & Health

  • Worked on my own & as part of a team

  • Developed High skills of management, motivations & work administration to achieve their objectives.

  • Worked according to GE quality standards.

  • Speak and write 3 languages: Arabic, English & French
Resume created on DoYouBuzz
  • Project:
    Construction and Erection of 2 GE frame 9E Gas Turbines, Generators and auxiliaries in Bouchema Tunisia
    Fast Track Power Project (3 Months)
  • Realizations:
    • Mechanical Construction & Commissioning in Bouchema Power Plant –250 MW which consists of Two GE 9E
    • To ensure efficient inter-discipline release: foundations to Equipment, then Equipment release to Piping / Hydro; coordination with Electrical and Instrumentation
    • To supervise the work performed by the contractor; to check its progress as per schedule and budget; and to achieve completion dates as per contract.
    • Check the preparation, issue and implementation by contractor of construction means, including documents, detailed procedures, method statements, drawings, calculation notes, construction equipment, personnel, planning, as-built documentation, operation and maintenance manuals, and back-up procedures if necessary.
  • Project:
    Construction and Erection of 8 GE frame 9E Gas Turbines, Generators and auxiliaries in New Assiut
    Fast Track Power Project,
    Was part of a team to deliver 8x9E turbines installed & operated on time achieving a world record in installation & deliverance.
  • Realizations:
    • Mechanical Construction & Commissioning in New Assiut Simple Cycle Power Plant –1000 MW which consists of Eight GE 9E
    • Helped in delivering a turbine, that was flipped during transportation, on time
    • Technically advised on Equipment Package With all required Balance of plant systems - On-base piping and equipment according to GE Standards of quality & safety.
Company website
  • Project :
    Bir Mchergua2: Two Gas turbine 9E / Generator: ELIN 120 MW Installation
    (Fast Track erection 3 months)
  • Client :
    General Electric International Inc. GEII / Tunisian electricity & gas company STEG.
  • Realizations :
    • Supervising Mechanical Activities shaft line & BOP, involved with Inspection and alignment of rotating equipment
    • Preparing and implementing Commissioning and pre-commissioning for Turbine, generator, Lube oil.
      -Package & equipments installation ( GT, Generator, Filter House, cooler, Plenum exhaust, Fire fighting system, pumps, crane...)
    • Hydraulic test, Oil Flushing & Punch list
  • Project :
    Construction of a sulfuric & phosphoric acid plant SKHIRA - TUNISIA
    [] Installation and commissioning :
    • Turbo-Generator (Steam Turbine) GE oil&gas 24MW (type 6-8MC7E)
    • Turbo-Blower (Steam Turbine) Siemens 6.7MW (type STC-SO)
    • Furnace/boiler & pumps
  • Partnership : Technip / Pireco
  • Client : Tunisian Indian Fertilizers TIFERT
  • Realizations :
    • Ensuring that design and quality requirements are maintained during construction phase.
    • Using feedback from the sites to provide engineering with information which could be used to develop better products.
    • Ensuring the completion and commissioning requirements are fully covered and clear.
      Participating, if required, to the elaboration of the procedure, and ensuring it is well understood by the site team.
    • Steam turbine & auxiliary installation (Oil supply tank, control oil, condenser, Gearbox, Generator and blower, overhead tank , silencing hood …)
    • Internal Checks of Turbine and installation of seal ring
    • Mechanical Calibration : Admission valve, Stop valve
    • Adjustment of vibration sensor, displacement, speed
    • Turbine / Pumps installation, alignment, coupling installation and commissioning
    • Furnace/boiler installation& commissioning
  • Project :
    • Sfax- Thyna 3: Installation & commissioning of power plant with gas turbine 9E / Gen: Alstom 120MW (9 months)
    • Feriana 2: Installation & commissioning of power plant with gas turbine 9E / Gen: Alstom 120MW (6 months)
  • Client : General Electric International Inc. GEII / Tunisian electricity & gas company STEG.
  • Realizations :
    • Ensuring that all items required for the project are ordered, or supplied by fabricator.
    • Ensuring free issue items are available and delivered to site as required, and taking appropriate action to mitigate potential risks of delay on the project.
    • Gas turbine, Generator and auxiliary installation (Oil supply tank, control oil, , Firefighting, Gas skid , cooler , silencing hood , Plenum exhaust, Filter house …)
    • Equipment alignment, Oil Flushing Hydraulic test
    • Adjustment of vibration sensor, displacement, speed
    • Pre-commissioning & commissioning turbo generator
  • Projects :
    • Installation & commissioning of three turbo compressors in Sbeitla TUNISIA : (Gas Turbine: GE/NP PGT25 DLE; centrifugal compressor : GE/NP PCL801-1) (9 months)
    • Installation & commissioning of one turbo-compressor in Feriana TUNISIA: (Gas Turbine: GE/NP PGT25 DLE; centrifugal compressor : GE/NP PCL603-2) (7 months)
  • Client : Nuovo Pignone. GE OIL & GAZ / SCOGAT.(ENI).
  • Realizations :
    • Ensuring the company construction procedures are followed on site.
    • Ensuring all necessary records are obtained from contractor and reviewed or approved as necessary.
    • Installation of Gas turbine, Compressors & auxiliary (Oil Tank, control oil, , Firefighting System, Hydraulic startup skid , Silencing hood, filter house, inlet duct, chimney …)
    • Piping installation for oil , gas, sealing air & Piping Chemical cleaning & Hydraulic Test
    • Equipment Alignment , Adjustment of vibration sensor, displacement, speed & Oil Flushing
    • Pre-commissioning & commissioning turbo compressor & hydraulic startup skid
    • Loop check and functional test
  • Project :
    • Sfax-Thyna2: Installation & commissioning of power plant with gas turbine9E/Gen:Alstom120MW(11months)
    • La Goulette: Installation & commissioning of power plant with gas turbine 9E/Gen:Alstom120MW(24months)
  • Client : General Electric International Inc. GEII / Tunisian electricity & gas company STEG.
  • Realizations :
    • Ensuring that engineering deliverables are available for site when required.
    • Ensuring all necessary fabrication procedures are in place and approved.
    • Gas turbine, Generator and auxiliary installation (Oil supply tank, control oil, Firefighting, Gas skid , water cooler , silencing hood , crane, exhaust plenum, Stack …)
    • Hydraulic test & Oil Flushing
    • Equipment (pumps & turbines) alignment
    • Adjustment of vibration sensor, displacement, speed
    • Pre-commissioning & commissioning turbo generator