Anis GHNIMI

Mechanical Construction & commissioning (Static and Rotating Equipments)

Anis GHNIMI
46 years old
Adress: Village Hammem Bourguiba (Ain Drahem - 8136) Tunisia
Professional Status
Unemployed
Available
About Me
Mechanical Construction & Commissioning (Static & Rotating Equipments)

  • Worked as Mechanical Installation Supervisor with GE power and water with experience for more than 11 years of experience working in oil and gas, power generation (GE Frame 9E), Turbo-compressor (GE PGT 25) and chemical process facilities.

  • Worked in multinational environment with different nationalities at different locations.

  • Acquired a high knowledge of mechanical engineering principals mixed with hands on practical experience.

  • High awareness of GE standards of Safety & Health

  • Worked on my own & as part of a team

  • Developed High skills of management, motivations & work administration to achieve their objectives.

  • Worked according to GE quality standards.

  • Speak and write 3 languages: Arabic, English & French
Resume created on DoYouBuzz
  • Project:
    Construction and Erection of 2 GE frame 9E Gas Turbines, Generators and auxiliaries in Bouchema Tunisia
    Fast Track Power Project (3 Months)
  • Realizations:
    • Mechanical Construction & Commissioning in Bouchema Power Plant –250 MW which consists of Two GE 9E
    • To ensure efficient inter-discipline release: foundations to Equipment, then Equipment release to Piping / Hydro; coordination with Electrical and Instrumentation
    • To supervise the work performed by the contractor; to check its progress as per schedule and budget; and to achieve completion dates as per contract.
    • Check the preparation, issue and implementation by contractor of construction means, including documents, detailed procedures, method statements, drawings, calculation notes, construction equipment, personnel, planning, as-built documentation, operation and maintenance manuals, and back-up procedures if necessary.
  • Project:
    Construction and Erection of 8 GE frame 9E Gas Turbines, Generators and auxiliaries in New Assiut
    Fast Track Power Project,
    Was part of a team to deliver 8x9E turbines installed & operated on time achieving a world record in installation & deliverance.
  • Realizations:
    • Mechanical Construction & Commissioning in New Assiut Simple Cycle Power Plant –1000 MW which consists of Eight GE 9E
    • Helped in delivering a turbine, that was flipped during transportation, on time
    • Technically advised on Equipment Package With all required Balance of plant systems - On-base piping and equipment according to GE Standards of quality & safety.
Learn more
  • Project :
    Bir Mchergua2: Two Gas turbine 9E / Generator: ELIN 120 MW Installation
    (Fast Track erection 3 months)
  • Client :
    General Electric International Inc. GEII / Tunisian electricity & gas company STEG.
  • Realizations :
    • Supervising Mechanical Activities shaft line & BOP, involved with Inspection and alignment of rotating equipment
    • Preparing and implementing Commissioning and pre-commissioning for Turbine, generator, Lube oil.
      -Package & equipments installation ( GT, Generator, Filter House, cooler, Plenum exhaust, Fire fighting system, pumps, crane...)
    • Hydraulic test, Oil Flushing & Punch list
  • Project :
    Construction of a sulfuric & phosphoric acid plant SKHIRA - TUNISIA
    [] Installation and commissioning :
    • Turbo-Generator (Steam Turbine) GE oil&gas 24MW (type 6-8MC7E)
    • Turbo-Blower (Steam Turbine) Siemens 6.7MW (type STC-SO)
    • Furnace/boiler & pumps
  • Partnership : Technip / Pireco
  • Client : Tunisian Indian Fertilizers TIFERT
  • Realizations :
    • Ensuring that design and quality requirements are maintained during construction phase.
    • Using feedback from the sites to provide engineering with information which could be used to develop better products.
    • Ensuring the completion and commissioning requirements are fully covered and clear.
      Participating, if required, to the elaboration of the procedure, and ensuring it is well understood by the site team.
    • Steam turbine & auxiliary installation (Oil supply tank, control oil, condenser, Gearbox, Generator and blower, overhead tank , silencing hood …)
    • Internal Checks of Turbine and installation of seal ring
    • Mechanical Calibration : Admission valve, Stop valve
    • Adjustment of vibration sensor, displacement, speed
    • Turbine / Pumps installation, alignment, coupling installation and commissioning
    • Furnace/boiler installation& commissioning
  • Project :
    • Sfax- Thyna 3: Installation & commissioning of power plant with gas turbine 9E / Gen: Alstom 120MW (9 months)
    • Feriana 2: Installation & commissioning of power plant with gas turbine 9E / Gen: Alstom 120MW (6 months)
  • Client : General Electric International Inc. GEII / Tunisian electricity & gas company STEG.
  • Realizations :
    • Ensuring that all items required for the project are ordered, or supplied by fabricator.
    • Ensuring free issue items are available and delivered to site as required, and taking appropriate action to mitigate potential risks of delay on the project.
    • Gas turbine, Generator and auxiliary installation (Oil supply tank, control oil, , Firefighting, Gas skid , cooler , silencing hood , Plenum exhaust, Filter house …)
    • Equipment alignment, Oil Flushing Hydraulic test
    • Adjustment of vibration sensor, displacement, speed
    • Pre-commissioning & commissioning turbo generator
  • Projects :
    • Installation & commissioning of three turbo compressors in Sbeitla TUNISIA : (Gas Turbine: GE/NP PGT25 DLE; centrifugal compressor : GE/NP PCL801-1) (9 months)
    • Installation & commissioning of one turbo-compressor in Feriana TUNISIA: (Gas Turbine: GE/NP PGT25 DLE; centrifugal compressor : GE/NP PCL603-2) (7 months)
  • Client : Nuovo Pignone. GE OIL & GAZ / SCOGAT.(ENI).
  • Realizations :
    • Ensuring the company construction procedures are followed on site.
    • Ensuring all necessary records are obtained from contractor and reviewed or approved as necessary.
    • Installation of Gas turbine, Compressors & auxiliary (Oil Tank, control oil, , Firefighting System, Hydraulic startup skid , Silencing hood, filter house, inlet duct, chimney …)
    • Piping installation for oil , gas, sealing air & Piping Chemical cleaning & Hydraulic Test
    • Equipment Alignment , Adjustment of vibration sensor, displacement, speed & Oil Flushing
    • Pre-commissioning & commissioning turbo compressor & hydraulic startup skid
    • Loop check and functional test
  • Project :
    • Sfax-Thyna2: Installation & commissioning of power plant with gas turbine9E/Gen:Alstom120MW(11months)
    • La Goulette: Installation & commissioning of power plant with gas turbine 9E/Gen:Alstom120MW(24months)
  • Client : General Electric International Inc. GEII / Tunisian electricity & gas company STEG.
  • Realizations :
    • Ensuring that engineering deliverables are available for site when required.
    • Ensuring all necessary fabrication procedures are in place and approved.
    • Gas turbine, Generator and auxiliary installation (Oil supply tank, control oil, Firefighting, Gas skid , water cooler , silencing hood , crane, exhaust plenum, Stack …)
    • Hydraulic test & Oil Flushing
    • Equipment (pumps & turbines) alignment
    • Adjustment of vibration sensor, displacement, speed
    • Pre-commissioning & commissioning turbo generator
  • Over 11 years within the international oil industry, I have experience and knowledge in all aspects of rotating equipment and static equipment.
  • I have good oral and written communication skills including the ability to make presentations and write effective reports.
  • I have a broad knowledge in Problem solving and can effectively set and deliver targets and plan current workloads
  • My ability to work in team environments has been proven within the dynamics of a multi-functional and multi-locational environment
  • Complying with Health and Safety and environmental regulations.
  • Ensuring the health, safety and welfare of others.
  • I have the ability to coach, lead, and integrate within an international and national workforce
  • I am strongly committed to safety.
  • Rotating machinery (gas turbine, steam turbine, turbo Generator, turbo compressor, turbo blower, all types of pumps, etc..)
  • Static Equipment
  • Erection of new machine
  • Maintenance and revamping
  • Alignment(by dial gauge and laser )
  • Preparation of planning and progress
  • Pre-commissioning and commissioning
  • Prepare a final documentation & AS-Built
  • Operating system: MS Windows, Unix,
  • Office software: MS-Office(Excel, Word, Power Point, Access, Outlook Express, Outlook)
  • Planning: (Primavera Project Planner P3, SureTrak Project Manager 3.0, MS Project.
  • CAO: AutoCAD
  • Arabic
  • French
  • English

Mechanical engineer

High Institute of Technological Studies - Nabeul(ISET Nabeul)

September 1999 to February 2003
Mechanical Enginner Diploma

The techniques of industrial maintenance

CETIME (Technical Center of the industries Mechanical and Electric)

November 2003
The techniques of industrial maintenance Certificate
  • Other
  • Football
  • Other