Mechanical Construction & Commissioning (Static & Rotating Equipments)
Worked as Mechanical Installation Supervisor with GE power and water with experience for more than 11 years of experience working in oil and gas, power generation (GE Frame 9E), Turbo-compressor (GE PGT 25) and chemical process facilities.
Worked in multinational environment with different nationalities at different locations.
Acquired a high knowledge of mechanical engineering principals mixed with hands on practical experience.
High awareness of GE standards of Safety & Health
Worked on my own & as part of a team
Developed High skills of management, motivations & work administration to achieve their objectives.
Worked according to GE quality standards.
Speak and write 3 languages: Arabic, English & French
Project: Construction and Erection of 2 GE frame 9E Gas Turbines, Generators and auxiliaries in Bouchema Tunisia Fast Track Power Project (3 Months)
Realizations:
Mechanical Construction & Commissioning in Bouchema Power Plant –250 MW which consists of Two GE 9E
To ensure efficient inter-discipline release: foundations to Equipment, then Equipment release to Piping / Hydro; coordination with Electrical and Instrumentation
To supervise the work performed by the contractor; to check its progress as per schedule and budget; and to achieve completion dates as per contract.
Check the preparation, issue and implementation by contractor of construction means, including documents, detailed procedures, method statements, drawings, calculation notes, construction equipment, personnel, planning, as-built documentation, operation and maintenance manuals, and back-up procedures if necessary.
Project: Construction and Erection of 8 GE frame 9E Gas Turbines, Generators and auxiliaries in New Assiut Fast Track Power Project, Was part of a team to deliver 8x9E turbines installed & operated on time achieving a world record in installation & deliverance.
Realizations:
Mechanical Construction & Commissioning in New Assiut Simple Cycle Power Plant –1000 MW which consists of Eight GE 9E
Helped in delivering a turbine, that was flipped during transportation, on time
Technically advised on Equipment Package With all required Balance of plant systems - On-base piping and equipment according to GE Standards of quality & safety.
Ensuring that design and quality requirements are maintained during construction phase.
Using feedback from the sites to provide engineering with information which could be used to develop better products.
Ensuring the completion and commissioning requirements are fully covered and clear. Participating, if required, to the elaboration of the procedure, and ensuring it is well understood by the site team.
Steam turbine & auxiliary installation (Oil supply tank, control oil, condenser, Gearbox, Generator and blower, overhead tank , silencing hood …)
Internal Checks of Turbine and installation of seal ring
Sfax- Thyna 3: Installation & commissioning of power plant with gas turbine 9E / Gen: Alstom 120MW (9 months)
Feriana 2: Installation & commissioning of power plant with gas turbine 9E / Gen: Alstom 120MW (6 months)
Client : General Electric International Inc. GEII / Tunisian electricity & gas company STEG.
Realizations :
Ensuring that all items required for the project are ordered, or supplied by fabricator.
Ensuring free issue items are available and delivered to site as required, and taking appropriate action to mitigate potential risks of delay on the project.
Gas turbine, Generator and auxiliary installation (Oil supply tank, control oil, , Firefighting, Gas skid , cooler , silencing hood , Plenum exhaust, Filter house …)
Equipment alignment, Oil Flushing Hydraulic test
Adjustment of vibration sensor, displacement, speed