  • Complete factory all industrial works Silos , Preheater&crasher & lime stone storage & substations, Cooler, tunnels, landscape, roads, and etc.Using systems like (slip form system & post tension cables for Silos & using scaffolding design on heavy works & ready mix concrete.Applied industrial safety in all the phases of the project
Learn more
  • Complete factory all industrial works silos , Preheater&crasher & lime stone storage & substations and etc.Using systems like (slip form system & post tensioncables for Silos & using scaffolding design on heavy works&ready mix concrete.Applied industrial safety in all the phases of the project
  • 670 villas ( concrete and finishing ) contain swimming pools , lakes ,roads , landscaping , stone bridges , water tank ,Irrigation tank
Learn more
  • Building a factory to produce milk products and have all civil works [production building –boiler – (water - gas and treatment tanks]And have terms:Post tension concrete and high finishing works-floors (ceramic-granite…etc.)-doors (France metal – Hormann –Delta )- False celling.-Curtain walls.-Roads (R c slabs – interlock )-Ready mix concrete (with fiber steel and with fiber glass)-central air conditioning and firefighting works-Exterior paints (Saveto, DRY MIX, JOTUN, etc.)-Interior paints ( acrylic)- Epoxy paints for (walls and floors )-Isolation against (sound –water –heat) for Roofs and Tanks-Make lines of feeding and drainage and test this lines( infrastructure)
Learn more
  • Complete factory all industrial works silos & packing and etc. Using systems like (slip form system & post tension cables for Silos & using scaffolding design on heavy works &ready mix concrete.
Learn more

Site Manager

Al Islamia company FOR GENERAL CONTRACTING
February 2008 to August 2008
  • Building 14 Floors ( Concrete)( raft -2 basements and 4 floors

Site Manager & Slip Form Engineer

LIFT SLAB COMPANY
October 2006 to February 2008
Sinai
Egypt
  • Al Arabia Cement Line 1 ( EGYPT )1 SiloAl Arabia Cement 2 ( SAUDIA ARABIA) 4 SilosSinai Cement Line2 ( EGYPT ) 3 Silos
Learn more

Project Engineer and quantity survey

PRIMES INTERNATIONAL COMPANY
July 2004 to October 2005
taif
Saudi Arabia
  • Al- Obikan Tower
    32 Floors with plan runway (concretes) & swimming pool & steel form works (acrow misr scaffolding system) & automatic car parking system. & placing concrete using (stationary pump, pump) & test concrete on site.

Site Engineer

AL REHAB COMPANY FOR GENERAL CONTRACTING
July 2003 to February 2004
  • High building 14 floor ( concretes & finishing)

Consultant From the army

ARMY GENERAL CONTRACTING
April 2002 to June 2003
  • Stores & Steel structures
  • 960 Housing Units In Ismailia CityProject Description Every Unit 5 Floors ( Concretes & Finishing)
Learn more
  • Microsoft office 2016
    Expert
  • AUTOCAD 2016
    Expert
  • INTERNET PROGRAMS
    Expert
  • Microsoft MS project
    Expert
  • All civil construction works.
    Expert
  • All finishing works (paints –electricity- floors- etc. )
    Expert
  • Slip form works (silos –building cores – water tanks- etc.)
    Expert
  • Quality control ( concrete – steel- all civil works)
    Advanced
  • Cost control & time control
    Expert
  • quantity survey using ( MS office2016 –AutoCAD 2016)
    Expert
  • Planning and scheduling using Microsoft MS project 2013
    Expert
  • Work-Shop drawings.
    Expert

Bachelor‘s degree

fculty of engineering Zagazig University Egypt

September 1997 to October 2001
civil engineering (64.49 %) project (excellent