Complete factory all industrial works Silos , Preheater&crasher & lime stone storage & substations, Cooler, tunnels, landscape, roads, and etc.Using systems like (slip form system & post tension cables for Silos & using scaffolding design on heavy works & ready mix concrete.Applied industrial safety in all the phases of the project
Complete factory all industrial works silos , Preheater&crasher & lime stone storage & substations and etc.Using systems like (slip form system & post tensioncables for Silos & using scaffolding design on heavy works&ready mix concrete.Applied industrial safety in all the phases of the project
Juhayna Factory in Assuit Nestle Factory in 6 th October Juhayna STORE in CAIRO
Egypt
Building a factory to produce milk products and have all civil works [production building –boiler – (water - gas and treatment tanks]And have terms:Post tension concrete and high finishing works-floors (ceramic-granite…etc.)-doors (France metal – Hormann –Delta )- False celling.-Curtain walls.-Roads (R c slabs – interlock )-Ready mix concrete (with fiber steel and with fiber glass)-central air conditioning and firefighting works-Exterior paints (Saveto, DRY MIX, JOTUN, etc.)-Interior paints ( acrylic)- Epoxy paints for (walls and floors )-Isolation against (sound –water –heat) for Roofs and Tanks-Make lines of feeding and drainage and test this lines( infrastructure)
Esaco Manufacturing Engineering & Contracting S. A. E
August 2008
to February 2012
Beni Suef Cement Line 2 Wadi El Nile Cement Line 1 Assuit Cement Production Plant 1.5 million ton annual
Egypt
Complete factory all industrial works silos & packing and etc. Using systems like (slip form system & post tension cables for Silos & using scaffolding design on heavy works &ready mix concrete.
Al- Obikan Tower 32 Floors with plan runway (concretes) & swimming pool & steel form works (acrow misr scaffolding system) & automatic car parking system. & placing concrete using (stationary pump, pump) & test concrete on site.